',, 'ELERATED TRIBUTION DEMONS TION SYSTEM k
INFORMATION DISTRIBUTION SYSTEM (RIDS)
I'EGULATORY ACCESSION NBR: 9104090187 DOC. DATE: 91/03/28 NOTARIZED: NO DOCKET FACIL:50-410 Nine Mile Point Nuclear Station, Unit 2, Niagara Moha 05000410 AUTH. NAME AUTHOR AFFILIATION MCCORMICK,M.J. Niagara Mohawk Power Corp.
RECIP.NAME RECIPIENT AFFILIATION
'R ~
SUBJECT:
"NMP Nine Mile Point, Unit 2 First Refueling Outgage Reactor Containment Bldg Integrated Leak Rate Test." W/910402 ltr.
DISTRIBUTION CODE: A017D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal: Append' Containment Leak Rate Testing .
S'OTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD1-1 LA 1 0; PD1-1 PD 1 BRINKMAN,D 2 . 2 OUDINOT,D 2=, 2 D INTERNAL: ACRS 6. 6 NRR/DST/SPLB 8D 1 1 D OC/LFMB 1 0 OGC/HDS 1 1' 01 1 ~ 1 RES/DE/SEB 1 1 S
~RES/'D DB/RS 1 1 RES/DSIR/SAIB 1 1 RES/DSR/RPSB 1 1 EXTERNAL: NRC PDR 1 1 NSIC 1 1
. R D
S D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM. DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 22 ENCL 20
0 I
I V
\
NINE MILE POINTUNIT 2/P.O. BOX 63, LYCOMING, NY 13093/TELEPHONE (315) 343-2110 April 2, 1991
, NMP79609 U.S. Nuclear Regulatory Commission Attention: Document and Control Desk Washington, D.C. 20S55
SUBJECT:
Report of Reactor Containment Building Integrated Leak Rate Test Results Docket No. 50-410 Nine-Mile Point Nuclear Station-Unit 2 Enclosed is the report of the Integrated Leak Rate Test for the Reactor Containment Building completed on January 6, 1991. This report is being submitted in accordance with Section V, Paragraph B.3 of 10CFRSO, Appendix J.
If there are any questions, please contact Mr. Ray Dean, Lead System Engineer at (315) 349-4240.
Sincere Mart , J. McCormick, Jr.
Plant Manager, NMP2 cc: Regional Administrator, Region I W. A. Cook, Resident Inspector 9104090187 91032S PDR ADOCK 05000410 P PDR
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 1ST REFUELING OUTAGE REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST March 28, 1991
/91pppgpy8~ I
I 0
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT TABLE OF CONTENTS SECTION TITLE PAGE TABLE OF CONTENTS EXECUTIVE
SUMMARY
1.0 INTRODUCTION
1 2.0 GENERAL DATA 1 3.0 TECHNICAL DATA 1 4.0 TEST DATA 2 5,0 VERIFICATION TEST 2 6.0 ANALYSIS AND INTERPRETATION 2 7.0
SUMMARY
OF EVENTS 10 REFERENCES 11 TABLES 6.9-1 AS LEFT TYPE A TEST RESULTS 6.10-1 AS FOUND TYPE A TEST RESULTS 6.11-1 VERIFICATION TEST RESULTS FIGURES 6.8-1 PLOT OF CONTAINMENT AIR MASS - TEMPERATURE STABILIZATION 14 6.9-1 PLOT OF TOTAL TIME LEAKAGE RATE AND UCL VS..75La 15 6.9-2 PLOT OF CONTAINMENT AIR MASS - TYPE A TEST 16 6.11-1 PLOT OF TOTAL TIME LEAKAGE RATE VS. VERIFICATION LIMITS 17 6.11-2 PLOT OF CONTAINMENT AIR MASS - VERIFICATION TEST 18 N M P2-I LRT
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT APPENDICES A
SUMMARY
OF TYPE B AND C TEST RESULTS Section I, Summary of Type B Test ResultsSection II, Summary of Type C Test Results
SUMMARY
OF TYPE B AND C TEST FAILURES Section I, Summary of Type B and C Failures between Preoperational Test and Commercial Operations.
Section II, Summary of Type B and C Failures for May 1988 Outage Section III, Summary of Type B and C Failures for October 1988 Outage Section IV, Summary of Type B and C Failures for September 1989 Outage Section V, Summary of Type B and C Failures for January 1990 Outage Section Vl, Summary of Type B and C Failures for May 1990 Outage Section Vll, Summary of Type B and C Failures for First Refueling Outage Section Vill, Summary of Type B and C Failures, Failure to Meet Acceptance Criteria of 10CFR50 Appendix J Section III.C.3.a PRE-TEST PENALTY LEAKAGE RESULTS TYPE A TEST PARAMETERS VERIFICATION TEST PARAMETERS NMP2-ILRT
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT EXECUTIVE
SUMMARY
This report is written to provide an analysis and interpretation of the results of the Type A test. The subject test was performed during the first refueling outage.
Pressurization of the containment began at 2300 on January 4, 1991. Final containment test pressure was reached at 0915 on January 5, 1991. The test was conducted from 1315 to 2115 on the same date. The verification test was completed on January 6,1991 at 0230. Depressurization was completed at 0330 on January 7, 1991.
The acceptance criteria established for the test are found in 10CFR50 Appendix J, Section III A.5.b(2) and Nine Mile Point Unit 2 Technical Specification 3.6.1.2, These values are less than 0.75 La, or 0.825 %/day and less than or equal to 1.1 %/day respectively. The Type A "as found" results were 0.623 %/day. This number includes penalties and "as found" vs. "as left" savings form the Type B and C tests. The "as left" result was 0.305 %/day. The "as left" result also includes appropriate 8 and C penalties.
Based on the above it can be seen that both "as found" and "as left" results are below the acceptance criteria.
The report also includes a summary of Type B and C tests performed since the last Type A test. This summary is provided in appendix A. Appendix B provides an analysis of the failures and gives descriptions of corrective actions performed.
NMP2-ILRT
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT
1.0 INTRODUCTION
In accordance with the requirements of 10CFR50 Appendix J, Section V, Paragraphs B.1 and B.3, this report provides the results of the Nine Mile Point Nuclear Station, Unit 2, 1991 Integrated Leak Rate Test. The general form and content of this report was written in accordance with ANSI/ANS-56.8-1987, "Containment System Leakage Testing Requirements", Section 5.8.
2.0 GENERAL DATA 2.1 Principal Owner and Licensee: The Niagara Mohawk Power Corporation 2.2 Plant Name: Nine Mile Point Unit 2 2.3 Docket No.: 50-410
2.4 Location
Nine Mile Point site on the southern shore of Lake Ontario, Lycoming, New York 2.5 Containment
Description:
General Electric Boiling Water Reactor, Mark II, pressure suppression type containment 2.6 Test Completion Date: January 6, 1991 3.0 TECHNICAL DATA 3.1 Containment Net Free Volume: 496,800 cu ft 3.2 Design Pressure: 45 psig 3.3 Design Temperature: 340 'F (Drywell); 207 'F (Suppression Pool) 3.4 Calculated Accident Peak Pressure, Pac: 39.75 psig (Drywell);
33.98 psig (Suppression Pool) 3.5 Calculated Accident Peak Temperature: 286 'F (Drywell)
NMP2-ILRT 1 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 4.0 TEST DATA 4.1 Test Method: Absolute Method 4.2 Data Analysis Technique: Total time analysis method in accordance with BN-TOP-1, "Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants", Revision 1, November 1, 1972.
4.3 Test Pressures: Between 56.5 psia and 56.7 psia 4.4 Maximum Allowable Leakage Rate La (%/24 hours): 1.1 %/day 4.5 Calculated Leakage Rate at Upper Confidence Limit (UCL); 0.288 %/day 4.6 Measured Leakage Rate (Lam): 0.192 %/day 5.0 VERIFICATION TEST Calibrated Leak Superimposed (%/24 hours): 1.013 %/day See Section 6.11 for more information regarding the verification test.
6.0 ANALYSIS AND INTERPRETATION 6.1 Acce ance Criteria Based on Nine Mile Unit 2 Technical Specification Limiting Condition for Operation 3.6.1.2, the primary containment overall integrated leakage rate shall be maintained less than or equal to La, or 1 1% by weight of the
~
containment air per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> at Pa, 39.75 psig. 10CFR50 Appendix J, Section III A.5.b(2), requires that the measured leakage rate shall be less than 0.75La, or 0.825 %/day as determined by the Type A test. This was interpreted to mean that the upper confidence limit on the measured leakage rate (UCL), including all Type B and C corrections, penalties, and other leakage additions, shall be less than the above acceptance criteria.
NMP2-ILRT 2of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT Further, a verification test using the calibrated superimposed leakage method shall be performed and satisfy the following condition:
(Lo + Lam - 0.25 La) ( Lc ( (Lo + Lam + 0.25 La)
Where; Lo = Superimposed Leakage rate which is between 75 and 125% of La, Lam = Last valid Type A measured/calculated leakage rate, Lc = Composite leakage rate as measured by the data acquisition system during the verification test, La = Maximum allowable leakage rate at pressure Pac.
6.2 Instrumentation S stem The test instrumentation system consisted of: (1) a microprocessor controlled data acquisition system (DAS); (2) twenty-two drybulb resistance temperature detectors; (3) six dew point temperature sensors; and (4) two precision pressure manometers. For testing purposes, only one precision pressure manometer connected to the drywell was used . Prior to containment pressurization, the calculated instrumentation system Instrument Selection Guide (ISG) was 0.0228%/day for an assumed eight hour test duration. This value was below the required value of 0.275%/day.
The instrumentation system configuration at the beginning and end of the test was:
- a. Drybulb RTD Sensors: 22
- b. Dewpoint Temperature Sensors: 6
- c. Precision Pressure Manometers: 1
- d. Mass Flow Meters: 1 NMP2-ILRT 3 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 6.3 T e B Tes Resul s (Ref. Appendices A and B)
In accordance with 10CFR50 Appendix J, Section V.B.3, a summary analysis of periodic Type 8 tests performed since the last Type A test is provided in appendices A and B.
6.4 T e C Air Test Resul s (Ref. Appendices A and B)
In accordance with 10CFR50 Appendix J, Section V,B.3, a summary analysis of periodic Type C tests performed since the last Type A test is provided in appendices A and B.
6.5 T e B and C Pretes Penal Leaka e (Ref. Appendix C)
In accordance with 10CFR50 Appendix J, Section III.A.1.d, certain systems penetrating the containment boundary were not vented and drained. In order to compute the appropriate Type A Test penalty to be applied to the upper confidence limit, an analysis of each affected penetration was performed, based on minimum path analysis as described in the Nine Mile Point Unit 2 USAR. Based on this analysis, a total pretest penalty leakage of 0.017 %/day was assigned. Appendix C is a detailed summary of these penetrations and their assigned penalty leakages based on Type B and Type C Test results.
6.6 S ruc ural lnte ri Ins ec ion and Evalua ion In accordance with 10CFR50 Appendix J, Section V.A, the primary containment was inspected for structural integrity. During this inspection, two conditions requiring additional engineering evaluation were observed.
- 1) During the pretest inspection by Maintenance Engineering, it was discovered that a number of piping plugs (located on the penetration test head) were missing from'four "Z" type penetrations. The intended function of the penetration test heads is to provide a means to perform a Positive Pressure Decay Test of welds between the liner insert plates and the penetration sleeves. The test heads do not comprise part of the primary containment liner boundary. Based on engineering evaluation, it was determined that the missing plugs were NMP2-ILRT 4of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT not required to be installed during the test or prior to startup.
Documentation related to the engineering evaluation of this condition is available at the plant site.
- 2) During the pretest inspection by Maintenance Engineering, it was discovered that the paint coating on many weld joints was cracking, peeling, and flaking. The unsatisfactory loose paint condition has been determined to be a specified amount of unqualified coating within the containment area. Based on engineering evaluation, it was determined that the affected coating conditions had been previously accounted for in other analyses, Documentation related to the engineering evaluation of this condition is available at the plant site.
6.7 Area Tem era ure Surv An area temperature survey of the primary containment was performed to verify that the instrument locations and associated volume fractions employed during the preoperational test were valid for the first Unit 2 inservice test. The following conditions were established prior to the survey:
- 1. All Drywell fans secured and cooling water isolated.
- 2. Recirculation System secured.
- 3. Loop B of the Residual Heat Removal System in service.
- 4. Reactor coolant temperature controlled between 102 'F and 108 'F.
The results of the survey confirmed the correct location of the dry bulb and dew point temperature sensors for the containment ventilation configuration employed during the test.
NMP2-ILRT 5 of 18
l NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 6.8 Tem erature Stabilization The temperature stabilization period was begun after reaching the final containment pressure of 56.8 psia. The containment atmosphere was allowed to stabilize for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. The latest rate of drybulb temperature change over the last hour of the stabilization period was 0.022'F. The rate of change over the last four hours of the stabilization period was 0.185'F, indicating a stable containment atmosphere. Further, a plot of containment air mass versus time was observed to be trending towards linear behavior, thus confirming containment atmospheric stability. (See Figure 6.8-1.)
6.9 As Le Containmen T e A Tes The Type A Test was begun at 1315 hours0.0152 days <br />0.365 hours <br />0.00217 weeks <br />5.003575e-4 months <br /> on January 5, 1991. Based on the Total Time Analysis Method, the test was declared over at 2115 on January 5, 1991. The Type A Test results must be corrected for Type B and Type C test penalty leakages, which are equal to 0.017 %/day. (See Appendix C.) The following table summarizes the as left test results.
TABLE 6.9-1 As Left Type A Test Results Type B &. C Pre-Test Penalty Leakage 0.017 %/day Water Level Correction 0.000 %/day Total Time Leakage UCL 0.288 %/day Post Test Type B 5. C Leakage Correction 0.000 %/day TOTAL 0.305 %/day Total Time Acceptance: 0.305 %/day < 0.825 %/day NMP2-ILRT 6 of 18
~g NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT Figure 6.9-1 illustrates the Total Time calculated leakage rate and associated upper confidence limit over the test interval ~ In addition, a plot of containment air mass versus time indicates containment atmosphere stability during the Type A test. (See Figure 6.9-2.) Based on the above data, it was concluded that the as left containment leakage rate was stable, below the acceptance criteria, and therefore the containment may be declared operable in accordance with the plant Technical Specifications, Also see Appendix D for a tabulation of Type A test results.
6.10 As Found Containmen T e A Tes Type A Test results must be compensated for the "as found" vs. "as left" leakages for all penetrations if the Type B and C Tests are conducted prior to the Type A Test. These as found vs. as left leakages were tabulated based on the minimum pathway leakage in Procedure N2-TSP-CNT-@003 and were equal to 0.006 %/day. The following table summarizes the as found test results.
TABLE 6.10-1 As Found Type A Test Results As Left Total Time Leakage Rate 0.305 %/day As Found vs. As Left Leakage Correction 0.006 %/day Plug PT-84A Maximum Leakage 0.312 %/day (See Section 6.12, part 2)
TOTAL 0.623 %/day Total Time Acceptance: 0.623 %/day ( 1.1 %/day Based on the above data, it was concluded that the as found containment leakage rate was below the acceptance criteria.
NMP2-ILRT 7 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 6.11 Verification Tes The superimposed leakage verification test was begun at 2130 on January 5, 1991 The superimposed leakage rate was established at 13.01 SCFM,
~
A one hour stabilization period was followed by a 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> verification test which was performed in accordance with BN-TOP-1 based on an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> Type A Test duration. The following table summarizes the test results.
TABLE 6.11-1 Verification Test Results Verification Test Completion 0230/01-06-91 Time and Date Superimposed Leakage Rate (Lo) 1.013 %/day Total Time Composite Leakage at 1.016 %/day End of Test (Lc)
Total Time Calculated Leakage (Lam) 0.192 %/day from Type A Test Lo + Lam + 0.275 %/day = ULIMIT 1.480 %/day Lo + Lam-0.275 %/day = LLIMIT 0.930 %/day Total Time Acceptance: 0.930 < 1.016 ( 1.480 LLIMIT< Lc ( ULIMIT Figure 6.11-1 illustrates the verification test Total Time Composite Leakage Rate with respect to the upper and lower limits as a function of time. In addition, a plot of containment air mass versus time indicates containment atmosphere stability during the verification test. (See Figure 6.11-2,)
Based on the above data, it was concluded that the composite leakage rate NMP2-ILRT 8 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT was stable, within the limits of the test, and therefore, the Type A Test instrumentation system was considered to be verified functional throughout the Type A Test. Also see Appendix E for a tabulation of verification test results.
6.12 Con ainmen Penetra ion Re ir rA 'en No repairs or adjustments were made to the containment boundary during the Type A Test or the subsequent verification test.
During containment pressurization, a thorough walkdown of all accessible penetrations was conducted. During this walkdown, two conditions were identified that required adjustment to the containment boundary.
- 1) RCIC turbine exhaust line check valve V29 was leaking suppression pool water to the RCIC turbine. In order to prevent damage to the turbine and contamination of its oil systems, motor operated valve MOV"122 was closed, effectively isolating penetration Z-19 and stopping the leak. The minimum pathway leakage for this penetration is .742 SCFH. Therefore, this value was included in Appendix C, Pre Test Penalty Leakage Results as a valve lineup change penalty.
- 2) Containment pressure transmitter 2RCS-PT84A was observed to be leaking through the high side bleed and vent valve. This valve was considered to be part of the containment boundary valve alignment by the test director and as such was ordered closed by normal means using l&C craft personnel. However, upon further investigation, it was discovered that the condition of this valve may have existed for a significant period of time prior to the Type A test. Since no local leakage rate test results were available for this condition, the contribution of this valve to the as found containment condition is indeterminate. The maximum leakage through this valve would occur just prior to the checking setpoint of the instrument excess flow check valve. The setpoint for this valve is 4.0 SCFIVI. Therefore, this value was used to compensate the as found test results for this condition. These results are presented in Table 6.10-1.
NMP2-ILRT 9 of 18
0 NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 7.0
SUMMARY
OF EVENTS 7.1 ~Pi* 1
- C 2300 on January 4, 1991.
1 p<<l* 1 The pressurization b g phase was interrupted once due to penetration Z-49 steel temperature dropping to near the nil ductility transition (NDT) temperature. Once the source of steel cooling was discovered and corrected, pressurization was resumed. Final containment pressure was reached at 0915 on January 5, 1991.
7.3 ~gbili* 1
- C 1 bill 1 b g 5915 3 y 5.
1991 ~ Based on temperature stability and air mass data, the containment was declared stabilized at 1315 on January 5, 1991.
7.3 TATT-Tb <<1 5 Tyb AT d 1 d 1315 January 5, 1991. The test proceeded for 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and was declared over at 2115 on January 5, 1991.
7.4 Verification Test - The start of the verification test was declared at 2130 on January 5, 1991 ~ A one hour stabilization period was implemented in accordance with BN-TOP-1. The test proceeded for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and was declared over at 0230 on January 6, 1991.
7.5 De ressurization - The containment was depressurized over a period of 25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />. The containment pressure was reduced to atmospheric conditions at 0330 on January 7, 1991.
NMP2-ILRT 10 of 18
0 NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT
8.0 REFERENCES
8.1 Licensee Documen ation
- a. Nine Mile Point Unit 2, Updated Safety Analysis Report, Section 6.2
- b. Nine Mile Point Unit 2, Technical Specifications, Sections 4.0.5, 4.4.4.c, 4.6.1.2.a-d, 4.6.2.1.d, Table 3.6.3-1 and 4.6.6.1.c 8.2 S and rds Re ulations and Codes
- a. 10CFR50, Appendix J, Primary Reactor Containment Leakage Testing for Light Water Reactors
- b. ANSI N45.4-1972, Leakage-Rate Testing of Containment Structures for Nuclear Reactors C. ANSI-ANS 56.8-1987, Containment System Leakage Testing Requirements
- d. BN-TOP-1, November 1, 1972, Testing Criteria for Integrated Leakage Rate Testing of Primary Containment Structures for Nuclear Power Plants
- e. IEN 85-71, Containment Integrated Leak Rate Tests 3.3 3
- a. N2-TSP-CNT-O001, Reactor Containment Building Integrated Leak Rate Test
- d. N2-MSP-CNT-R005, Primary Containment Structural Integrity Inspection 11 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT 8.4 Additional References
- b. SER 90-045, Primary Containment Volume
- c. SER 90-148, Primary Containment Integrated Leak Rate Test NMP2-ILRT 12 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT FIGURES NMP2-ILRT 13 of 18
FIGURE 6.8-1 NINE MILE POINT UNIT 2 ILRT CONTAINMENT AIR MASS GEN SYS DATASET S 17 ORP 138520 ~ ooooo DATE ~ 0 1/05/9 1 TIME 13: 15: 00 138500 Tdry 84 . 626 Ptot 56. 671 138480 Pvap 0.4736 B Tdew 77.898 M
Tstab 0.185 138460 ~ ' " 4 A T. RMASS 138449 138440 MP Lam 0.2007 MP UCL 0.2521 TT Lam 0.2970 138420 ~ ~
TT LSq 0 . 0714 TT UCL 0.6983 138400 0 1 2 3 4 ELAPSED T IME (HOURS)
TEMPERATURE STABILIZATION NNP2- I LRT 14 of 18
FIGURE 6.9-1 NINE MILE POINT UNIT 2 ILRT TOTAL TIME LEAKAGE RATE AND UCL VS .75La Lam GENSYS DATASET A 32 UCL QQRP 0.890 DATE ~ 01/ 05/ 91 P
- 0. 790 TIME 21: 15: 00 R
- 0. 690 Tdr y - 84. 289 E
~
~
~
~
Ptot ~ 56.603 0.590 ' oooo
+oo ~ ooo>>
Pvap 0. 4761 T
0.490 ~ ~
~
o
~
~
~ ooo ooo ~
Tdew 78.064 Og P
~ ~
Tstab 0.004
~ ~
- 0. 390 ~
~
>>op
'o R ~ o>> A IRMASS 138361
- 0. 290 ~o ~ oo oooooo ~o MP Lam 0.1903 D
MP UCL 0.1973 A 0.190 ~ l ooo Y TT Lam 0. 1915 0.090 ~ >> \ >> TT LSg 0.1968 TT UCL 0.2880
.010 0 3 4 5 6 7 9 10 ELAPSED TIME (HOURS)
TYPE A TEST NMP2- ILRT 15 of 18
FIGURE 6.9-2 NINE MILE POINT UNIT 2 ILRT CONTAINMENT AIR MASS GENSYS DATASET A 32 138460 QQRP
~ 4 DATE ~ 0 1//05/ 9 1 TIME 21: 15: 00 138440 TCll 84.289 138420 ~ '"4 ~ oo oo 4 Ptot 56.603 L Pvap 0.4761 138400 B Tdew 78.064 M
138380 } oo oo Tstab 0.004 138360 AIRMASS 138361 MP Lam 0.1903 138340 ~ " ~ "4 MP UCL 0.1973 TT Lam 0.1915 138320 TT LSq 0.1968 TT UCL 0.2880 138300 0 3 4 5 6 7 9 10 ELAPSED T IME (HOURS)
TYPE A TEST NMP2-ILRT 16 of 18
FIGURE 6.11-1 NINE MILE POINT UNIT 2 ILRT TOTAL TIME LEAKAGE RATE VS VERIFICATION LIMITS GENSYS DATASET V 17 1.700 gORP DATE ~ 0 1, j'069 1 P
1.500 TIME 02 30: 00 R
1.300 ~ tie Tdr y 84 . 230 E Ptot ~ 56.479 1.100 Pvap - 0.4778 T Tdew - 78 . 174 0.900 ~ W P Tstab - 0.007
- 0. 700 R AIRMASS 138066
- 0. 500 MP Lam 1 . 0265 0
A o.3oo MP UCL 1.0451 Y TT Lam 1 . 0164
- 0. 100 TT LSq 1.0381
.100 TT UCL 1.1365 2 3 ELAPSEO TIME (HOURS)
VERIFICATION TEST ttMP2-ILRT 17 of 18
FIGURE 6.11-2 NINE MILE POINT UNIT 2 ILRT CONTAINMENT AIR MASS GENSYS OATASET V 17 CORP 138350 OATE ~ 0 1/06I/9 1 TIME ~ 02: 30: 00 138300 ~ o o 4 ~ o ~ o4 Tdry 84 . 230 138250 ~ oooooooooo \o ooo oooooooo ~o Ptot 56.479 L Pvap 0.4778 8 Tdew 78. 174 M
138200 Tstab 0. 007 138150 ~ oo ooo+ ~ " 4'IRMASS 138066 MP Lam 1.0265 138100, MP UCL 1 . 0451 TT Lam 1 . 0164 138050 TT LSq 1 . 0381 TT UCL 1 . 1365 138000 0 2 3 ELAPSED TIME (HOURS)
VERIFICATION TEST NMP2- ILRT 18 of 18
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST APPENDICES NMP2-ILRT
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS NMP2-ILRT
Page No.
03/25/91 APPENDIX'A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION DRA3
- CRD Removal Hatch 07/03/86 0.0110 0.5000 Yes 05/01/88 0.1460 0.5000 Yes 01/08/90 0.0610 0.5000 Yes 09/13/90 0.0050 0.5000 Yes 12/30/90 0.0080 0.5000 Yes
- PENETRATION DRA4A Sup Po ol N. Hatch 1 05/15/87 0.0060 0.5000 Yes 05/20/87 0.0080 0.5000 Yes 01/21/88 0.0050 0.5000 Yes 01/28/88 0.0100 0.5000 Yes 12/27/88 0.0060 0.5000 Yes 03/07/89 0.0060 0 '000 Yes 03/31/89 0.0070 0.5000 Yes 01/14/90 0.0050 0.5000 Yes 09/07/90 0.0070 0.5000 Yes 01/04/91 0.0050 0.5000 Yes
- PENETRATION DRA4B
- Sup Pool S. Hatch 2 12/18/87 0.0070 0.5000 Yes 05/01/88 0.1500 0.5000 Yes 05/21/88 0.0050 0.5000 Yes 10/04/88 0.0060 0.5000 Yes 11/17/88 0.0080 0.5000 Yes 02/08/89 0.0120 0.5000 Yes 03/22/89 0.0280 0.5000 Yes 09/09/89 0.0010 0.5000 Yes 09/19/89 0.0080 0.5000 Yes 01/05/90 0.0050 0.5000 Yes 01/20/90 0.0130 0.5000 Yes 09/07/90 0.0040 0.5000 Yes 01/04/91 0.0050 0.5000 Yes
4 Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION DRA5
- Equipment Hatch N 08/26/86 0.0100 0.5000 Yes 08/19/88 0.0100 0.5000 Yes 05/16/90 0.0130 0.5000 Yes 09/06/90 0.0130 0.5000 Yes 11/26/90 0.0080 0.5000 Yes
- PENETRATION DRA6
- Equipment Hatch S 05/22/87 0.0040 0.5000 Yes 11/24/87 0.0370 0.5000 Yes 12/12/87 0.0050 0.5000 Yes 10/01/88 0.0900 0.5000 Yes 02/05/89 0.1300 0.5000 Yes 09/06/90 0.0080 0.5000 Yes 12/30/90 0.0040 0.5000 Yes
- PENETRATION HD1
- Drywell Head 02/26/87 0.0450 0.5000 Yes 10/11/88 0.0170 0.5000 Yes 09/11/90 0.0650 0.5000 Yes 12/30/90 0.0510 0.5000 Yes
- PENETRATION Overal
- Escape Hatch 05/14/87 0.2980 41.2000 Yes 09/26/87 1.5350 41.2000 Yes 10/27/87 1.8460 41.2000 Yes 04/30/88 9.0270 41.2000 Yes 10/02/88 1.8550 41.2000 Yes 02/01/89 1.8310 41.2000 Yes 07/11/89 3.1080 41.2000 Yes 10/22/89 0.0710 41.2000 Yes 01/27/90 0.4900 41.2000 Yes 05/16/90 0.3390 41.2000 Yes
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- Personnel Airlock 06/07/87 1.7660 41.2000 Yes 09/27/87 2.2170 41.2000 Yes 12/18/87 6.2780 41.2000 Yes 04/30/88 30.6330 41.2000 Yes 10/02/88 2.9730 41.2000 Yes 02/21/89 5.6230 41.2000 Yes 07/11/89 8.4350 41.2000 Yes 10/22/89 1.7980 41.2000 Yes 01/27/90 0.1380 41.2000 Yes 05/17/90 1 '840 41.2000 Yes
- PENETRATION Z-201
- , Electrical Penet 02/14/87 0.0190 0.1000 Yes 11/29/88 0.0170 0.1000 Yes 09/09/90 0.0220 0.1000 Yes
- PENETRATION Z-202
- Electrical Penet 09/08/86 0.0420 0.1000 Yes 11/29/88 0.0450 0.1000 Yes 09/08/90 0.0280 0.1000 Yes
- PENETRATION Z-203
- Electrical Penet 09/08/86 0.0080 0.1000 Yes 11/30/88 0.0060 0.1000 Yes 09/09/90 0.0050 0.1000 Yes
- + PENETRATION Z-204
- Electrical Penet 09/08/86 0.0050 0.1000 Yes 11/30/88 0.0060 0.1000 Yes 09/08/90 0.0040 0.1000 Yes
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-205
- Electrical Penet 09/08/86 0.0080 0.1000 Yes 11/30/88 0.0050 0.1000 Yes 09/09/90 0.0070 0.1000 Yes 11/30/90 0.0040 0.1000 Yes
- PENETRATION Z-206
- Electrical Penet 05/21/87 0.0060 0.1000 Yes 08/15/87 0.0180 0.1000 Yes 11/30/88 0.0080 0.1000 Yes 09/08/90 0.0100 0.1000 Yes
- PENETRATION Z-207
- Electrical Penet 09/08/86 0.0080 0.1000 Yes 11/30/88 0.0050 0.1000 Yes 09/09/90 0.0040 0.1000 Yes
- PENETRATION Z-208
- Electrical Penet 09/08/86 0.0050 0.1000 Yes 11/30/88 0.0060 0.1000 Yes 09/09/90 0.0040 0.1000 Yes
- PENETRATION Z-209
- Electrical Penet 09/08/86 0.0080 0.1000 Yes 11/30/88 0.0210 0.1000 Yes 09/09/90 0.0040 0.1000 Yes
~,
~ i
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-210
- , Electrical Penet 09/08/86 0.0080 0.1000 Yes 11/30/88 0.0040 0.1000 Yes 09/09/90 0.0060 0.1000 Yes
- PENETRATION Z-211
- Electrical Penet 09/09/86 0.0130 0.1000 Yes 12/01/88 0.0090 0.1000 Yes 09/10/90 0.0200 0.1000 Yes
- PENETRATION Z-212
- Electrical Penet 09/09/86 0. 0130 0.1000 Yes 12/01/88 0.0280 0.1000 Yes 09/10/90 0.0220 0.1000 Yes
- PENETRATION Z-213
- Electrical Penet 09/09/86 0.0130 0.1000 Yes 12/01/88 0.0040 0.1000 Yes 09/10/90 0.0050 0.1000 Yes
- PENETRATION Z-214
- Electrical Penet 09/09/86 0.0130 0.1000 Yes 12/04/88 0.0040 0.1000 Yes 09/10/90 0.0040 0.1000 Yes
- PENETRATION Z-215 Electrical Penet 09/09/86 0.0100 0.1000 Yes 12/04/88 0.0040 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
g Jl
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-216
- Electrical Penet 09/17/87 0.0330 0.1000 Yes 12/01/87 0.0380 0.1000 Yes 12/01/88 0.0050 0.1000 Yes 09/17/90 0.0040 0.1000 Yes
- PENETRATION Z-217
- Electrical Penet 09/09/86 0.0100 0.1000 Yes 12/01/88 0.0060 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-218
- Electrical Penet 09/09/86 0.0100 0.1000 Yes 12/01/88 0.0050 0.1000 Yes 09/17/90 0.0040 0.1000 Yes
- PENETRATION Z-219
- Electrical Penet 09/09/86 0.0070 0.1000 Yes 12/01/88 0.0050 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-220
- Electrical Penet 09/09/86 0.0070 0.1000 Yes 12/01/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
k il
'I F
II C
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-221
- Electrical Penet 09/09/86 0.0070 0.1000 Yes 12/04/88 0.0040 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-222
- Electrical Penet 05/21/87 0.0080 0.1000 Yes 08/15/87 0.0060 0.1000 Yes 09/22/87 0.0020 0.1000 Yes 12/04/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-223
- Electrical Penet 09/10/86 0.0040 0.1000 Yes 12/04/88 0.0070 0.1000 Yes 09/20/90 0.0230 0.1000 Yes
- PENETRATION Z-224
- Electrical Penet 09/10/86 0.0040 0.1000 Yes 12/05/88 0.0260 0.1000 Yes 09/20/90 0.0060 0.1000 Yes
- PENETRATION Z-225
- Electrical Penet 09/10/86 0.0040 0.1000 Yes 12/05/88 0.0050 0.1000 Yes 09/20/90 0.0070 0.1000 Yes
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-226
- Electrical Penet 09/10/86 0.0040 0.1000 Yes 12/05/88 0.0040 0.1000 Yes 09/21/90 0.0060 0.1000 Yes
- PENETRATION Z-227
- Electrical Penet 09/10/86 0.0270 0.1000 Yes 12/05/88 0.0040 0.1000 Yes 09/21/90 0.0470 0.1000 Yes
- PENETRATION Z-228
- Electrical Penet 09/10/86 0.0050 0.1000 Yes 12/05/88 0.0040 0.1000 Yes 09/21/90 0.0040 0.1000 Yes
- PENETRATION Z-229
- Electrical Penet 09/10/86 0.0270 0.1000 Yes 02/16/88 0.0470 0.1000 Yes 12/06/88 0.0490 0.1000 Yes 09/19/90 0.0270 0.1000 Yes
- PENETRATION Z-230
- Electrical Penet 09/10/86 0.0270 0.1000 Yes 12/06/88 0.0690 0.1000 Yes 09/20/90 0.0360 0.1000 Yes
- PENETRATION Z-231
- Electrical Penet 09/11/86 0.0050 0.1000 Yes 12/06/88 0.0050 0.1000 Yes
~ k k
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-232
- Electrical Penet 09/11/86 0.0050 0.1000 Yes 12/07/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-233
- Electrical Penet 09/11/86 0. 0040 0.1000 Yes 12/07/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-234
- Electrical Penet 09/11/86 0.0070 0.1000 Yes 12/07/88 0.0050 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-235
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/07/88 0.0060 0.1000 Yes 09/18/90 0.0050 0.1000 Yes 11/30/90 0.0040 0.1000 Yes
- PENETRATION Z-236
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 11/25/87 0.0130 0.1000 Yes 12/07/88 0.0080 0.1000 Yes 09/18/90 0.0120 0.1000 Yes
0 t
0
Page No. 10 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-237
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/07/88 0.0040 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-238
- Electrical Penet 09/11/86 0.0070 0.1000 Yes 12/07/88 0. 0040 0.1000 Yes 09/18/90 0.0050 0.1000 Yes
- PENETRATION Z-239
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/07/88 0.0040 0.1000 Yes 09/18/90 0. 0040 0.1000 Yes
- PENETRATION Z-240
- Electrical Penet 09/11/86 0.0070 0.1000 Yes 12/08/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-241
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/08/88 0.0110 0.1000 Yes 09/19/90 0.0050 0.1000 Yes
- PENETRATION Z-242
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/09/88 0.0050 0.1000 Yes 09/08/90 0.0080 0.1000 Yes
I l
Page No. 11 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-243
- Electrical Penet 09/11/86 0.0040 0. 1000 Yes 12/08/88 0.0190 0. 1000 Yes 09/22/90 0.0050 0.1000 Yes
- PENETRATION Z-244
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/09/88 0.0050 0.1000 Yes 09/19/90 0.0050 0.1000 Yes 11/30/90 0.0040 0.1000 Yes
- PENETRATION Z-245
- Electrical Penet 09/17/86 0.0240 0.1000 Yes 12/11/88 0.0170 0.1000 Yes 09/22/90 0.0040 0.1000 Yes
- PENETRATION Z-246
- Electrical Penet 09/17/86 0.0240 0.1000 Yes 12/11/88 0.0220 0.1000 Yes 09/22/90 0.0050 0.1000 Yes
- PENETRATION Z-247
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/08/88 0.0050 0.1000 Yes 09/19/90 0.0060 0.1000 Yes
0 Page No. 12 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-248
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/09/88 0.0040 0.1000 Yes 09/21/90 0.0050 0.1000 Yes
- PENETRATION Z-249
- Electrical Penet 09/11/86 0.0040 0.1000 Yes 12/09/88 0.0040 0.1000 Yes 09/21/90 0.0050 0.1000 Yes
- PENETRATION Z-250
- Electrical Penet 09/10/86 0.0080 0.1000 Yes 12/09/88 0.0040 0.1000 Yes 10/06/90 0.0120 0.1000 Yes
- PENETRATION Z-251
- Electrical Penet 09/08/86 0.0050 0.1000 Yes 11/30/88 0.0050 0.1000 Yes 10/06/90 0.0110 0.1000 Yes
- PENETRATION Z-252
- Electrical Penet 09/09/86 0.0130 0.1000 Yes 11/30/88 0.0080 0.1000 Yes 10/06/90 0.0210 0.1000 Yes
- PENETRATION Z-253
- Electrical Penet 09/10/86 0.0080 0.1000 Yes 12/09/88 0.0060 0.1000 Yes 10/06/90 0.0130 0.1000 Yes
Page No. 13 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-254
- Electrical Penet 09/10/86 0.0270 0.1000 Yes 12/06/88 0.0040 0.1000 Yes 10/05/90 0.0320 0.1000 Yes
- PENETRATION Z-255
- Electrical Penet 09/11/86 0.0070 0.1000 Yes 12/08/88 0.0050 0.1000 Yes 09/18/90 0.0040 0.1000 Yes
- PENETRATION Z-256
- Electrical Penet 08/27/86 0.0070 0.1000 Yes 10/07/88 0.0050 0.1000 Yes 09/07/90 0.0040 0.1000 Yes
- PENETRATION Z-257
- Electrical Penet 08/27/8Q 0.0130 0.1000 Yes 10/07/88 0.0050 0.1000 Yes 09/08/90 0.0040 0.1000 Yes
- PENETRATION Z-258
- Electrical Penet 08/27/86 0.0240 0.1000 Yes 10/08/88 0.0040 0.1000 Yes 09/08/90 0.0040 0.1000 Yes
- PENETRATION Z-259
- Electrical Penet 08/27/86 0.0200 0.1000 Yes 10/08/88 0.0040 0.1000 Yes
Page No. 14 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 09/08/90 0.0050 0.1000 Yes
- PENETRATION Z-260
- Electrical Penet 08/27/86 0.0090 0.1000 Yes 10/08/88 0.0040 0.1000 Yes 09/08/90 0.0060 0.1000 Yes 10/31/90 0.0050 0.1000 Yes
- PENETRATION Z-31AA
- TIP Penetration 11/30/87 0.0070 0.5000 Yes 03/04/89 0.0040 0.5000 Yes 05/19/90 0.0050 0.5000 Yes
- PENETRATION Z-31AB
- TIP Penetration 05/19/90 0.0040 0.5000 Yes
- PENETRATION Z-31B
- PENETRATION Z-31BA
- TIP Penetration 11/30/87 0.0090 0.5000 Yes 03/04/89 0.0040 0.5000 Yes 05/19/90 0.0060 0.5000 Yes
- PENETRATION Z-31BB
- TIP Penetration 05/19/90 0.0060 0.5000 Yes
h Page No. 15 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-31CA
- TIP Penetration 11/30/87 0.0080 0.5000 Yes 03/04/89 0.0040 0.5000 Yes 05/19/90 0.0040 0.5000 Yes
- PENETRATION Z-31CB
- TIP Penetration 05/19/90 0. 0040 0.5000 Yes
- PENETRATION Z-31DA
- TIP Penetration 11/30/87 0.0080 0.5000 Yes 03/04/89 0.0040 0.5000 Yes 05/19/90 0.0980 0.5000 Yes
- PENETRATION Z-31DB
- TIP Penetration 05/19/90 0.0040 0.5000 Yes
- PENETRATION Z-31EA
- TIP Penetration 11/30/87 0.0080 0.5000 Yes 03/04/89 0.0040 0.5000 Yes 05/19/90 0.0380 0.5000 Yes
- PENETRATION Z-31EB
- TIP Penetration 05/19/90 0.0050 0.5000 Yes
- PENETRATION Z-32
- TIP Penetration 11/30/87 0.0060 0.5000 Yes 03/04/89 0.0040 0.5000 Yes
l-Page No. 16 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND.C TEST RESULTS SECTION I TYPE B TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 12/07/90 0.0070 0.5000 Yes
- PENETRATION Z-46C
- FP Water Penet 05/20/87 0.0310 0.5000 Yes 05/22/87 0.0140 0.5000 Yes 05/26/88 0.0040 0.5000 Yes 01/05/90 0.0050 0.5000 Yes 10/30/90 0.0050 0.5000 Yes
- PENETRATION Z-74
- Spare Penet 04/06/88 05/02/88 105.6000 102.0000 0.5000 0.5000 No No SEE APP ~ B g SECT SEE APP ~ B g SECT ~
II II g ITEM 1 ITEM 1 g
05/13/88 0.0040 0.5000 Yes 01/05/90 0.0050 0.5000 Yes 09/06/90 0.0040 0.5000 Yes 12/30/90 0.0050 0.5000 Yes
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMXT
- PENETRATION N/A
- VALVE ID 2RDS*AOV123 11/26/87 0.1440 0.6250 Yes 09/10/89 0.0528 0.6250 Yes 10/23/90 0.0550 0.6250 Yes
- VALVE ID 2RDS*AOV124 11/26/87 0.1440 0. 3125 Yes 09/11/89 0.2289 0. 3125 Yes 10/23/90 0.0480 0. 3125 Yes
- VALVE ID 2RDS*AOV130 11/27/87 1.3120 0.6250 No see App. B, Sect I, Item 1 09/10/89 0.0950 0.6250 Yes 10/23/90 0.0410 0.6250 Yes
- VALVE ID 2RDS*AOV132 11/27/87 1.3120 0.3125 No see App. B, Sect I, Item 1 09/11/89 0.0830 0.3125 Yes 10/23/90 0.0000 0.3125 No see App. B, Sect VII, Item 1 11/06/90 0.0050 0.3125 Yes
- PENETRATXON 2-01A
- VALVE ID 2MSS*AOV6A 05/04/87 0.0440 6.0000 Yes 10/08/88 0. 1408 6.0000 Yes 09/27/90 2.4920 6.0000 Yes
- VALVE ID 2MSS*AOV7A 05/03/87 5.2890 6.0000 Yes 10/09/88 1.5904 6.0000 Yes 09/28/90 3.0040 6.0000 Yes
- VALVE ID 2MSS*MOV208 04/03/86 0.3040 1.5000 Yes 09/20/87 0.1327 0.6250 Yes 10/18/88 0.4590 0.6250 Yes 10/04/90 0.7386 0.6250 No see App. B, Sect VII, Item 2 11/30/90 0.4450 0.6250 Yes
P
,b II 4
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2MSS*SOV97A 04/03/86 0.3040 1.5000 Yes 02/08/87 1.5044 0.2344 No see App. B, Sect I, Item 1 09/19/87 0.4074 0.2344 No see App. B, Sect I, Item 1 10/18/88 12/02/88 0.3320 0.1360 0.2344 0.5000 No Yes see App. B, Sect III, Item 1 10/01/90 0.0102 3.0000 Yes 10/01/90 10.6240 3.0000 No see App. B, Sect VII, Item 3
- PENETRATION Z-01B
- VALVE ID 2MSS*AOV6B 05/04/87 4.4900 6.0000 Yes 10/08/88 0.7080 6.0000 Yes 10/02/90 3.9920 6.0000 Yes VALVE ID 2MSS*AOV7B 05/03/87 3.0894 6.0000 Yes 10/09/88 12/24/88 15.7040 0.3157 6.0000 6.0000 No Yes see App. B, Sect III, Item 2 10/01/90 0.7950 6.0000 Yes
- VALVE ID 2MSS*SOV97B 04/03/86 0.3040 1.5000 Yes 02/08/87 10/18/88 0.3250 0.0942 0.2344 No 0.5000 Yes see App. B, Sect I, Item 1 10/02/90 1.9710 3.0000 Yes
- PENETRATION Z-01C
- VALVE ID 2MSS*AOV6C 05/03/87 4.1400 6.0000 Yes 10/08/88 1.3720 6.0000 Yes 09/25/90 294.6800 6.0000 No see App. B, Sect VII, Item 4 12/25/90 1.5530 6.0000 Yes
- VALVE ID 2MSS*AOV7C 05/02/87 3.5350 6.0000 Yes 10/09/88 3.8924 6.0000 Yes 09/27/90 4.9510 6.0000 Yes
l~
0 e
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2MSS*SOV97C 04/03/86 0.3040 1.5000 Yes 02/08/87 0.8474 0.2344 No see App. B, Sect I, Item 1 08/15/87 10/18/88 0.2780 0.0307 0.2344 0.5000 No Yes see App. B, Sect I, Item 1 10/01/90 0.0290 3.0000 Yes
- PENETRATION Z-01D
- VALVE ID 2MSS*AOV6D 05/03/87 1.8580 6.0000 Yes 10/08/88 0.1304 6.0000 Yes 09/25/90 132.3500 6.0000 No see App. B, Sect VII, Item 5 12/03/90 4.0320 6.0000 Yes
- VALVE ID 2MSS*AOV7D 05/02/87 4.1284 6.0000 Yes 10/10/88 1.7674 6.0000 Yes 09/28/90 5.5700 6.0000 Yes
- VALVE ID 2MSS*SOV97D 04/03/86 0.3040 0.2344 No see App. B, Sect I, Item 1 02/08/87 8.7640 0.2344 No see App. B, Sect I, Item 1 10/18/88 12/20/88 1.1764 0.3700 0.2344 0.5000 No Yes see App. B, Sect III, Item 3 10/02/90 0.8390 3.0000 Yes
- + PENETRATION Z-02
- VALVE ID 2MSS*MOV111 08/16/86 0.0200 1.8000 Yes 09/09/87 09/16/87 12.8570 0.0325 1.8750 1.8750 No Yes see App. B, Sect I, Item 1 01/18/89 0.0207 1.8750 Yes 10/03/90 0.0090 1.8750 Yes
- VALVE ID 2MSS*MOV112 08/16/86 0.0200 1.8000 Yes 09/14/87 0.0407 1.8750 Yes 01/18/89 0.0068 1.8750 Yes
Ip Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/03/90 0.0050 1.8750 Yes
- PENETRATION Z-04A
- VALVE ID 2FWS*AOV23A 06/18/86 5.6200 12.0000 Yes 05/05/88 0.4123 12.0000 Yes 03/21/89 1.3046 12.0000 Yes 10/28/90 7.8370 12.0000 Yes
- VALVE ID 2FWS*MOV21A 06/20/86 05/04/88 12.1000 3.2956 12.0000 7.5000 No Yes see App. B, Sect I, Item 1 01/10/90 0.3812 7.5000 Yes 10/26/90 0.1089 7.5000 Yes VALVE ID 2FWS*V12A 06/18/86 0.2510 12.0000 Yes 05/05/88 0.0486 12.0000 Yes 03/22/89 0.0268 12.0000 Yes 10/28/90 8.1640 12.0000 Yes
- PENETRATION Z-04A,B
- VALVE ID 2WCS*MOV200 06/20/86 12.1000 12.0000 No see App. B, Sect I, Item 1 10/11/86 05/06/88 2.8324 1.6449 2.5000 2.5000 No Yes see App. B, Sect I, Item 1 01/10/90 0.3868 2.5000 Yes 10/24/90 0.5430 2.5000 Yes
- PENETRATION Z-04B
- VALVE ID 2FWS*AOV23B 06/20/86 2.0400 12.0000 Yes 05/05/88 1.1634 12.0000 Yes 09/16/89 0.1538 12.0000 Yes 10/29/90 1.7360 12.0000 Yes
- VALVE ID 2FWS*MOV21B 06/20/86 12.1000 12.0000 No see App. B, Sect I, Item 1
Ag
'P
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 05/04/88 2.9736 7.5000 Yes 01/10/90 0.3049 7.5000 Yes 10/27/90 0.1878 7.5000 Yes
- VALVE ID 2FWS*V12B 06/20/86 8.3000 12.0000 Yes 05/06/88 0.0840 12.0000 Yes 09/17/89 0.2668 12.0000 Yes 10/29/90 0.9420 12.0000 Yes
- PENETRATION Z-05A
- VALVE ID 2RHS*MOV1A 01/05/87 12/24/88 9.0910 1.4624 7.5000 No 7.5000 Yes see App. B, Sect I, Item 1 11/02/90 0.2130 7.5000 Yes
- PENETRATION Z-05B
- VALVE ID 2RHS*MOV1B 01/21/87 28.7240 7.5000 No see App. B, Sect I, Item 1 11/19/88 12/16/88 305.4000 0.7017 7.5000 7.5000 No Yes see App. B, Sect III, Item 4 10/14/90 5.4320 7.5000 Yes
- PENETRATION Z-05C
- VALVE ID 2RHS*MOV1C 03/31/86 5.4000 16.8000 Yes 07/25/86 16.7000 12.0000 No see App. B, Sect I, Item 1 03/25/87 11/26/88 16.7240 3.2730 7.5000 7.5000 No Yes see App. B, Sect I, Item 1 10/12/90 2.3294 7.5000 Yes
- + PENETRATION Z-06A
- VALVE ID 2RHS*MOV30B 05/04/87 0.1016 5.6250 Yes 11/14/88 2.5240 5.6250 Yes 10/11/90 0.0220 5.6250 Yes
fi' d I
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-06B
- VALVE ID 2RHS*MOV30A 04/10/87 2.5724 5.6250 Yes 12/30/88 01/11/89 0.0000 2.2484 5.6250 5.6250 No Yes see App. B, Sect III, Item 5 11/05/90 5.1640 5.6250 Yes
- PENETRATION Z-07A
- VALVE ID 2RHS*MOV33A 01/16/87 0.0630 1.2500 Yes 12/29/88 0.0870 1.2500 Yes 10/10/90 0.0060 1.2500 Yes 11/05/90 0.0060 1.2500 Yes 11/13/90 0.0260 1.2500 Yes
- PENETRATION Z-07B
- VALVE ID 2RHS*MOV33B 04/28/87 0.0090 1.2500 Yes 11/14/88 0.0055 1.2500 Yes 11/13/90 0.0070 1.2500 Yes
- PENETRATION Z-08A
- VALVE ID 2RHS*MOV15A 03/31/86 0 '510 4.8000 Yes 01/19/87 9.8780 5.0000 No see App. B, Sect I, Item 12/28/88 01/04/89 15.5240 3.6831 5.0000 5.0000 No Yes see App. B, Sect III, Item1 6 01/08/89 01/14/89 20.3240 0.0709 5.0000 5.0000 No Yes see App. B, Sect III, Item 6 11/06/90 0.0740 5.0000 Yes
- VALVE ID 2RHS*MOV25A 01/17/87 0.0610 5.0000 Yes 01/19/87 0.2860 5.0000 Yes 12/28/88 0.0440 5.0000 Yes 11/06/90 0.1670 5.0000 Yes
l ~
Y 1
e a
'I '4 I 4
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS?'OMMENTS LEAK RATE LIMIT
- PENETRATION Z-08B
- VALVE ID 2RHS*MOV15B 01/19/87 0.5854 5.0000 Yes 01/21/87 0.5584 5.0000 Yes 11/16/88 0.0160 5.0000 Yes 10/14/90 0.0720 5.0000 Yes
- VALVE ID 2RHS*MOV25B 01/19/87 0.0640 5.0000 Yes 01/21/87 0.0360 5.0000 Yes 11/16/88 0.0088 5.0000 Yes 10/14/90 0.0120 5.0000 Yes
- PENETRATION Z-09A
- VALVE ID 2RHS*AOV16A 06/06/86 0.8500 12.0000 Yes 10/10/86 1.1100 12.0000 Yes 04/06/87 0.7824 7.5000 Yes 01/02/89 01/15/89 0.0000 3.4170 7.5000 7.5000 No Yes see App. B, Sect III, Item 7 11/06/90 0.0000 30.0000 No see App. B, Sect VII, Item 6 11/21/90 15.5510 30.0000 Yes
- VALVE ID 2RHS*MOV24A 10/10/86 1.0380 3.6000 Yes 04/07/87 0.0488 3.7500 Yes 01/01/89 0.0455 3.7500 Yes 11/06/90 0.0730 3.7500 Yes
- PENETRATION Z-09B
- VALVE ID 2RHS*AOV16B 06/23/86 1.1100 12.0000 Yes 10/03/86 0.0570 12.0000 Yes 04/30/87 0.0770 7.5000 Yes 11/18/88 0.0066 7.5000 Yes 10/14/90 0.0046 30.0000 Yes
4 1t
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION XI TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMXT
- VALVE ID 2RHS*MOV24B 10/03/86 0.1000 3.6000 Yes 04/30/87 0.0880 3.7500 Yes 11/12/88 0.0200 3.7500 Yes 10/13/90 0.0280 3.7500 Yes
- PENETRATION Z-09C
- VALVE ID 2RHS*AOV16C 06/05/86 0.1150 12.0000 Yes 03/27/87 0.4630 7.5000 Yes 11/23/88 0.9204 7.5000 Yes 10/18/90 19.9240 30.0000 Yes 11/17/90 5.6240 30.0000 Yes
- VALVE ID 2RHS*MOV24C 03/26/87 0.2240 3.7500 Yes 11/21/88 0.0910 3.7500 Yes 10/17/90 0.0107 3.7500 Yes
- PENETRATION Z-10A
- VALVE ID 2RHS*AOV39A 05/06/86 3.9100 12.6000 Yes 04/05/87 0.0940 7.5000 Yes 01/01/89 01/09/89 33.2240 3.5804 7.5000 7.5000 No Yes see App. B, Sect. III, Item '8 10/27/90 3.2900 30.0000 Yes
- VALVE ID 2RHS*MOV40A 04/05/87 0.1239 3.7500 Yes 01/12/89 01/12/89 13.7040 3.2190 3.7500 3.7500 No Yes see App. B, Sect III, Item 9 10/28/90 5.9240 7.5000 Yes 12/04/90 0.0280 7.5000 Yes
- VALVE ID 2RHS*MOV67A 05/06/86 3.9100 12.6000 Yes 04/05/87 0.0050 0.6250 Yes 01/09/89 0.0684 0.6250 Yes 10/27/90 0.0500 0.6250 Yes
a 1r g1
~ '%
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-10B
- VALVE ID 2RHS*AOV39B 05/01/87 1.2724 7.5000 Yes 11/14/88 0.0337 7.5000 Yes 10/19/90 0.0000 30.0000 No see App. B, Sect VII, Item 8 10/20/90 0.0000 30.0000 No see App. B, Sect VII, Item 8 11/16/90 26.0000 30.0000 Yes
- VALVE ID 2RHS*MOV40B 07/18/86 0.4700 3.6000 Yes 05/02/87 0.1118 3.7500 Yes 11/13/88 0.0500 3.7500 Yes 11/04/90 0.0630 7.5000 Yes
- VALVE ID 2RHS*MOV67B 05/01/87 0.0424 0.6250 Yes 11/13/88 0. 0178 0.6250 Yes 11/17/90 0.0100 0.6250 Yes
- PENETRATION Z-ll
- VALVE ID 2RHS*MOV112 07/24/86 0.4600 6.0000 Yes 04/09/87 0.1850 6.2500 Yes 12/31/88 1.4464 6.2500 Yes 10/26/90 1.0824 6.2500 Yes
- VALVE ID 2RHS*MOV113 06/17/86 1.9500 6.0000 Yes 04/08/87 1.1100 6.2500 Yes 01/01/89 1.7624 6.2500 Yes 10/27/90 0.0140 6.2500 Yes
- VALVE ID 2RHS*RV152 04/08/87 01/01/89 1.1104 0.0195 0.2344 No 0.2344 Yes see App. B, Sect I, Item 1 10/28/90 0.0060 0.2344 Yes
II Page No. 10 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-12
- VALVE ID 2CSH*MOV118 10/31/86 0.0390 6.0000 Yes 10/27/88 0.0102 5.6250 Yes 12/20/88 0.0720 5.6250 Yes 10/19/90 0.3290 5.6250 Yes
- PENETRATION Z-13
- VALVE ID 2CSH*MOV105 08/17/86 0.7800 1.2000 Yes 05/10/88 0.0103 1.2500 Yes 01/14/90 0.3680 1.2500 Yes 10/25/90 0.0060 1.2500 Yes
- VALVE ID 2CSH*MOV111 08/08/86 0.0080 3.6000 Yes 01/17/87 0.0360 3.7500 Yes 10/26/88 0.0333 3.7500 Yes 10/18/90 0.6590 3.7500 Yes
- PENETRATION Z-14
- VALVE ID 2CSH*AOV108 07/23/86 2.2500 12.0000 Yes 09/12/87 5.8240 3.7500 No see App. B, Sect I, Item 1 10/25/88 0.0000 5.0000 No see App. B, Sect III, Item 10 10/25/88 11/02/88 205.1940 0.0000 7.5000 5.0000 No No see see App.
App.
B, B,
Sect Sect III, Item III, Item 10 10 01/21/89 3.4204 7.5000 Yes 09/26/90 0.0000 5.0000 No see App. B, Sect VII, Item 9 10/23/90 48.2000 30.0000 No see App. B, Sect VII, Item 9 11/20/90 12.9040 30.0000 Yes
- VALVE ID 2CSH*MOV107 08/10/86 0.0650 3.6000 Yes 09/18/87 09/26/87 6.8040 0.1490 3.7500 3.7500 No Yes see App. B, Sect I, Item 1 10/29/88 0.0360 3.7500 Yes 10/23/90 0.1290 3.7500 Yes
t,t
't lt V
r
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-15
- VALVE ID 2CSL*MOV112 05/27/86 8.0400 14.0000 Yes 05/07/88 0.2156 6.2500 Yes 01/17/90 0.7370 6.2500 Yes 01/21/90 0.4214 6.2500 Yes 09/14/90 1.3360 6.2500 Yes
- PENETRATION Z-16
- VALVE ID 2CSL*AOV101 06/06/86 1.1700 12.0000 Yes 09/15/87 10/19/88 10.6240 0.0876 3.7500 7.5000 No Yes see App. B, Sect I, Item 1 01/23/89 0.9704 7.5000 Yes 09/17/90 856.4800 30.0000 No see App. B, Sect VII, Item 10 11/20/90 20.9240 30.0000 Yes
- VALVE ID 2CSL*MOV104 06/30/86 0.1330 3.6000 Yes 09/15/87 10/21/88 4.8740 0.0580 3.7500 3.7500 No Yes see App. B, Sect I, Item 1 09/16/90 0.0690 3.7500 Yes
- PENETRATION Z-17
- VALVE ID 2ICS*MOV136 06/05/86 0.3160 1.8000 Yes 02/20/87 7.1240 1.8750 No see App. B, Sect I, Item 1 11/05/88 12/20/88 80.7540 0.1180 1.8750 1.8750 No Yes see App. B, Sect III, Item 11 10/30/90 0.0068 1.8750 Yes
- PENETRATION Z-18
- VALVE ID 2ICS*MOV143 12/18/86 0.0530 0.6250 Yes 12/20/86 0.0370 0.6250 Yes 02/21/87 0.0390 0.6250 Yes
L
Page No. 12 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/31/88 0.0138 0.6250 Yes 11/18/90 0.0160 0.6250 Yes
- PENETRATION Z-19
- VALVE ID 2ICS*MOV122 03/29/87 0.0254 3.7500 Yes 10/30/88 0.4030 3.7500 Yes 11/17/90 0.7420 3.7500 Yes
- PENETRATION Z-21
- VALVE ID 2ICS*MOV121 04/09/86 0.0120 3.0000 Yes 12/19/86 0.3200 3.1250 Yes 12/20/86 0.2890 3.1250 Yes 03/28/87 0.3960 3.1250 Yes 12/10/88 2.6304 3.1250 Yes 03/20/89 1.5594 3.1250 Yes 01/11/90 0.1004 3.1250 Yes 11/18/90 0.0060 3.1250 Yes
- VALVE ID 2ICS*MOV128 03/24/87 0.1460 3. 1250 Yes 11/02/88 1.3024 3.1250 Yes 11/19/90 42.0000 3.1250 No see App. B, Sect VII, Item 11 12/06/90 1.1120 3.1250 Yes
- VALVE ID 2ICS*MOV170 04/02/86 0.1500 0.3000 Yes 01/02/87 0.1140 0.3125 Yes 02/16/87 0.0100 0.3125 Yes 12/10/88 0.0060 0.3125 Yes 11/18/90 0.0040 0.3125 Yes 12/05/90 0.0150 0.3125 Yes
- PENETRATION Z-22
- VALVE ID 2ICS*AOV156 05/07/86 0.6400 6.0000 Yes 12/07/87 0.6250 3.7500 Yes
'I IH N
'I
Page No. 13 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 03/20/89 0.2093 3.7500 Yes 10/31/90 0.0000 3.7500 No see App. B, Sect VII, Item 12 12/11/90 2.1380 3.7500 Yes
- VALVE ID 2ICS*AOV157 06/04/86 5.5000 6.0000 Yes 12/05/87 0.0225 3.7500 Yes 03/22/89 0.4474 3.7500 Yes 11/17/90 0.3610 3.7500 Yes
- VALVE ID 2ICS*MOV126 01/02/87 0.7934 1.8750 Yes 01/08/87 0.2420 1.8750 Yes 12/06/87 0.0518 1.8750 Yes 03/21/89 0.1297 1.8750 Yes 10/31/90 0.0400 1.8750 Yes
- VALVE ID 2RHS*MOV104 05/02/86 0.1880 1.8000 Yes 12/06/87 0.7624 1.8750 Yes 03/26/89 0.1066 1.8750 Yes 11/01/90 0.0290 1.8750 Yes
- PENETRATION Z-23
- VALVE ID 2WCS*MOV102 06/19/86 0.0540 2.4000 Yes 09/06/87 0.0680 2.5000 Yes 01/21/89 0.0177 2.5000 Yes 10/16/90 1.8994 2.5000 Yes
- VALVE ID 2NCS*MOV112 06/19/86 0.0070 1.2000 Yes 09/06/87 0.0420 2.5000 Yes 01/21/89 0.0810 2.5000 Yes 10/16/90 2.8064 2.5000 No see App. B, Sect VII, Item 13 11/14/90 0.0060 2.5000 Yes
I ll N
Page No. 14 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-29
- VALVE ID 2SLS*MOV5A 08/04/86 0.0490 0.5000 Yes 05/07/88 0.0590 1.2500 Yes 11/05/88 0.0076 1.2500 Yes 10/13/90 0.0040 1.2500 Yes
- VALVE ID 2SLS*MOV5B 08/04/86 0.0490 0.5000 Yes 05/07/88 0.0590 1.2500 Yes 11/05/88 0.0076 1.2500 Yes 10/13/90 0.0040 1.2500 Yes
- VALVE ID 2SLS*V10 12/18/86 0.0620 0.6250 Yes 05/14/88 0.0860 1.2500 Yes 01/12/90 0.0165 1.2500 Yes 10/13/90 0.0510 1.2500 Yes
- PENETRATION Z-31A
- VALVE ID 2NMS*SOV1A 08/12/86 0.1690 0.5000 Yes 12/03/87 0.0127 0.4688 Yes 03/07/89 0.0055 0.1172 Yes 10/04/90 0.0060 0.1172 Yes
- PENETRATION Z-31B
- VALVE ID 2NMS*SOV1B 08/14/86 0.0060 0.5000 Yes 12/03/87 0.0157 0.4688 Yes 03/07/89 0.0052 0.1172 Yes 10/04/90 0.0060 0.1172 Yes
- PENETRATION Z-31C
- VALVE ID 2NMS*SOV1C 08/12/86 0.0160 0.5000 Yes 12/03/87 0.0223 0.4688 Yes
V q~
Page No. 15 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 03/07/89 0.0061 0. 1172 Yes 10/04/90 0.0070 0.1172 Yes
- PENETRATION Z-31D
- VALVE ID 2NMS*SOV1D 08/14/86 0.0070 0.5000 Yes 12/04/87 0.0191 0.4688 Yes 03/07/89 0.0051 0.1172 Yes 10/05/90 0.0060 0.1172 Yes
- PENETRATION Z-31E
- VALVE ID 2NMS*SOV1E 08/14/86 0.0080 0.5000 Yes 12/04/87 0.0182 0.4688 Yes 03/07/89 0.0077 0.4688 Yes 10/05/90 0.0040 0.4688 Yes
- PENETRATION Z-32
- VALVE ID 2GSN*SOV166 07/01/86 0.0070 0.2000 Yes 04/19/87 0.0055 0.3125 Yes 01/10/89 0.0060 0.3125 Yes 12/07/90 0.0060 0.3125 Yes
- VALVE ID 2GSN*V170 07/01/86 0.0940 0.5000 Yes 04/20/87 05/19/87 1.3124 0.0760 0.3125 0.3125 No Yes see App. B, Sect I, Item 1 01/11/89 0.0670 0.3125 Yes 12/07/90 0.0220 0.3125 Yes
- PENETRATION Z-33A
- VALVE ID 2CCP*MOV17A 06/16/86 0.1970 1.2000 Yes 04/14/87 0.0210 1.2500 Yes 11/05/88 0.0153 1.2500 Yes 10/25/90 0.0420 1.2500 Yes
I C'
i
'I ~
Page No. 16 03/25/91 APPENDIX A SUMMtWY OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2CCP*MOV94A 06/15/86 0.1180 1.2000 Yes 04/14/87 0.0387 1.2500 Yes 11/05/88 0.0272, 1.2500 Yes 10/25/90 0.0210 1.2500 Yes
- PENETRATION Z-33B
- VALVE ID 2CCP*MOV17B 04/25/87 0.0444 1.2500 Yes 12/07/87 0.1160 1.2500 Yes 10/14/88 0.0696 1.2500 Yes 09/11/90 0.0060 1.2500 Yes 10/06/90 0.0240 1.2500 Yes
- VALVE ID 2CCP*MOV94B 04/25/87 0.4580 1.2500 Yes 10/14/88 0.0153 1.2500 Yes 09/11/90 0.0060 1.2500 Yes
- VALVE ID 2CCP*RV170 04/25/87 0.0444 0.2344 Yes 12/07/87 0.1160 0.2344 Yes 10/14/88 0.0696 0.2344 Yes 09/11/90 0.0130 0.2344 Yes 10/06/90 0.0090 0.2344 Yes
- PENETRATION Z-34A
- VALVE ID 2CCP*MOV15A 06/16/86 0.0080 1.2000 Yes 04/14/87 0.1330 1.2500 Yes 11/05/88 0.0150 1.2500 Yes 10/25/90 0.0220 1.2500 Yes
- VALVE ID 2CCP*MOV16A 06/15/86 0.0120 1.2000 Yes 04/14/87 0.0270 1.2500 Yes 11/05/88 0.0077 1.2500 Yes 10/25/90 0.0090 1.2500 Yes
k il l
't
Page No. 17 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-34B
- VALVE ID 2CCP*MOV15B 04/06/86 0.2020 1.2000 Yes 04/26/87 0.0562 1.2500 Yes 12/07/87 0.0840 1.2500 Yes 10/17/88 0.2563 1.2500 Yes 10/21/88 0.1500 1.2500 Yes 09/12/90 0.0220 1.2500 Yes 10/07/90 0.0130 1.2500 Yes
- VALVE ID 2CCP*MOV16B 04/06/86 0.2570 1.8000 Yes 04/25/87 0.0492 1.2500 Yes 10/17/88 0.0135 1.2500 Yes 09/12/90 0.0160 1.2500 Yes
- VALVE ID 2CCP*RV171 04/26/87 0.0562 0.2344 Yes 12/07/87 0.0840 0.2344 Yes 10/17/88 10/21/88 0.2563 0.0878 0.2344 0.2344 No Yes see App. B, Sect III, Item 12 09/12/90 0.0298 0.2344 Yes 10/07/90 0.0048 0.2344 Yes
- PENETRATION Z-37
- VALVE ID 2AAS*HCV134 03/31/87 0.1078 0.6250 Yes 10/10/88 0.0323 0.6250 Yes 10/14/90 0. 0360 0.6250 Yes
- VALVE ID 2AAS*HCV136 03/31/87 0.0377 0.6250 Yes 10/10/88 0.0196 0.6250 Yes 10/14/90 0.0220 0.6250 Yes 1
H' 0
Page No. 18 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-38A
- VALVE ID 2RCS*V59A 04/01/86 0.0450 0.8000 Yes 04/20/87 0.0140 0.4688 Yes 10/19/88 11/03/88 88.8180 0.0150 0.4688 0.4688 No Yes see App. B, Sect III, Item 13 10/19/90 1.6104 6.0000 Yes
- VALVE ID 2RCS*V60A 04/01/86 0.5740 0.8000 Yes 04/21/87 0.0042 0.4688 Yes 10/19/88 0.0118 0.4688 Yes 10/20/90 2.8324 6.0000 Yes VALVE ID 2RCS*V90A 04/02/86 10.6000 0.8000 No see App. B, Sect I, Item 1 04/21/87 0.5391 0.4688 No see App. B, Sect I, Item 1 10/19/88 11/04/88 104.2200 0.0110 0.4688 No 0.4688 Yes see App. B, Sect III, Item 14 10/20/90 0.0117 6.0000 Yes
- PENETRATION Z-38B
- VALVE ID 2RCS*V59B 04/01/86 0.2520 0.8000 Yes 03/31/87 0.0580 0.4688 Yes 10/25/88 0.1761 0.4688 Yes 09/12/90 2.3237 6.0000 Yes 11/23/90 0.0690 6.0000 Yes
- VALVE ID 2RCS*V60B 04/02/86 0.4900 0.8000 Yes 04/01/87 0.3220 0.4688 Yes 10/26/88 11/05/88 1.3377 0.0100 0.4688 0.4688 No Yes see App. B, Sect III, Item 15 09/12/90 1.2160 6.0000 Yes
- VALVE ID 2RCS*V90B 04/02/86 9.0000 0.8000 No see App. B, Sect I, Item 1 04/01/87 8.6170 0.4688 No see App. B, Sect I, Item 1
I Page No. 19 03/25/91 APPENDIX
. A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/26/88 0.4424 0.4688 Yes 09/12/90 3.0404 6.0000 Yes 11/24/90 1.2624 6.0000 Yes
- PENETRATION Z-39
- VALVE ID 2DFR*MOV120 07/11/86 0.5500 1.8000 Yes 11/29/86 0.1220 1.8750 Yes 04/12/87 1.0270 1.8750 Yes 10/24/88 0.0370 1.8750 Yes 09/21/90 0.7444 1.8750 Yes
- VALVE ID 2DFR*MOV121 07/11/86 0.4800 1.8000 Yes 04/13/87 0.0168 1.8750 Yes 10/25/88 0.0054 1.8750 Yes 09/21/90 0.0040 1.8750 Yes
- PENETRATION Z-40
- VALVE ID 2DER*MOV119 04/04/86 0.8600 1.2000 Yes 04/16/87 0.0050 1.2500 Yes 12/21/88 0.1100 1.2500 Yes 10/04/90 0.0200 1.2500 Yes
- VALVE ID 2DER*MOV120 04/17/87 0.4354 1.2500 Yes 12/21/88 0.4590 1.2500 Yes 10/04/90 0.2680 1.2500 Yes
- PENETRATION Z-41
- VALVE ID 2RCS*SOV104 05/07/86 04/18/87 0.3760 0.0052 0.2000 0.2344 No Yes see App. B, Sect I, Item 1 09/16/87 0.0078 0.2344 Yes 09/19/87 10/22/88 0.9630 0.0129 0.2344 0.2344 No Yes see App. B, Sect I, Item 1 12/21/90 0.5224 5.0000 Yes
t '
a $
Page No. 20 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2RCS*SOV105 05/07/86 0.1130 0.2000 Yes 04/17/87 0.0042 0.2344 Yes 10/27/88 0.0077 0.2344 Yes 01/28/89 0.1024 0.2344 Yes 12/21/90 0.0430 5.0000 Yes
- PENETRATION Z-42A
- VALVE ID 2FPW*SOV218 10/08/86 0.1690 0.6000 Yes 05/06/88 0.2770 0.6250 Yes 01/07/90 0.0074 0.6250 Yes 09/22/90 0.0160 0.6250 Yes
- VALVE ID 2FPW*SOV219 10/09/86 0.0130 0.6000 Yes 05/05/88 0.0790 0.6250 Yes 01/07/90 0.0045 0.6250 Yes 09/22/90 0.0130 0.6250 Yes
- PENETRATION 2-42B
- VALVE ID 2FPW*SOV220 10/08/86 0.0100 0.6000 Yes 05/06/88 0.5718 0.6250 Yes 10/11/88 0.0112 0.6250 Yes 01/07/90 0.0060 0.6250 Yes 09/22/90 0.0050 0.6250 Yes
- VALVE ID 2FPW*SOV221 10/09/86 0.0080 0.6000 Yes 05/06/88 0.0194 0.6250 Yes 01/07/90 0.0052 0.6250 Yes 09/22/90 0.0050 0.6250 Yes
A Page No. 21 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-43
- VALVE ID 2DFR*MOV139 02/24/87 0.1570 0.9375 Yes 04/15/87 0.2320 0.9375 Yes 10/23/88 0.5084 0.9375 Yes 12/07/88 12/18/88 9.2640 0.2480 0.9375 0.9375 No Yes see App. B, Sect III, Item 16 09/13/90 0.6424 0.9375 Yes 09/21/90 0.3240 0.9375 Yes
- VALVE ID 2DFR*MOV140 04/15/87 0.2340 0.9375 Yes 10/23/88 0.1920 0.9375 Yes 09/13/90 42.4000 0.9375 No see App. B, Sect VII, Item 14 09/21/90 634.3270 0.9375 No see App. B, Sect VII, Item 14 12/21/90 0.1059 0.9375 Yes
- PENETRATION Z-44E
- VALVE ID 2SAS*HCV160 08/21/86 0.0192 0.6250 Yes 05/03/88 0.0200 0.6250 Yes 01/07/90 0.0100 0.6250 Yes 09/17/90 0.0140 0.6250 Yes
- VALVE ID 2SAS*HCV161 08/21/86 0.0420 0.6000 Yes 05/03/88 0.0190 0.6250 Yes 01/08/90 0.1857 0.6250 Yes 09/15/90 0.2190 0.6250 Yes
- VALVE ID 2SAS*HCV162 08/21/86 0.0190 0.6250 Yes 08/21/86 0.0320 0.6250 Yes 05/03/88 0.0180 0.6250 Yes 01/07/90 0.0130 0.6250 Yes 09/17/90 0.0150 0.6250 Yes
- VALVE ID 2SAS*HCV163 08/21/86 0.0250 0.6000 Yes
I s I" 4 f ~ %v n.
'I
Page No. 22 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 05/03/88 0. 0190 0.6250 Yes 01/08/90 0.0120 0.6250 Yes 09/15/90 0.2280 0.6250 Yes
- PENETRATION Z-44F
- VALVE ID 2AAS*HCV135 03/24/87 0.2880 0.6250 Yes 10/10/88 0.0323 0.6250 Yes 09/18/90 0.1730 0.6250 Yes
- VALVE ID 2AAS*HCV137 03/24/87 0.0140 0.6250 Yes 10/10/88 0.0439 0.6250 Yes 09/18/90 0.0310 0.6250 Yes
- PENETRATION Z-45
- VALVE ID 2DER*MOV130 06/02/86 0.4020 0.6000 Yes 08/26/86 0.2150 0.6000 Yes 12/23/86 0.2736 0.6250 Yes 04/17/87 0.2950 0.6250 Yes 12/22/88 0.2960 0.6250 Yes 09/15/90 0.2800 0.6250 Yes VALVE ID 2DER*MOV131 08/26/86 0.0940 0.6000 Yes 04/17/87 0.3650 0.6250 Yes 12/22/88 0.3900 0.6250 Yes 09/15/90 0.3260 0.6250 Yes
- PENETRATION Z-46A
- VALVE ID 2CCP*MOV265 04/24/87 0.1106 2.5000 Yes 10/16/88 0.2150 2.5000 Yes 09/11/90 0.0140 2.5000 Yes
- VALVE ID 2CCP*MOV273 04/24/87 0.0107 2.5000 Yes
l I
C
,E I
Page No. 23 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/16/88 0.0216 2.5000 Yes 12/03/88 0.2097 2.5000 Yes 09/10/90 0.0220 2.5000 Yes
- PENETRATION Z-47
- VALVE ID 2CCP*MOV122 04/25/87 0.0016 2.5000 Yes 10/17/88 12/17/88 9.9170 0.0963 2.5000 2.5000 No Yes see App. B, Sect III, Item 17 09/10/90 0.1960 2.5000 Yes
- VALVE ID 2CCP*MOV124 04/25/87 0.0114 2.5000 Yes 10/17/88 12/17/88 28.9240 0.1030 2.5000 No 2.5000 Yes see App. B, Sect III, Item 18 09/11/90 0.2010 2.5000 Yes
- PENETRATION Z-48
- VALVE ID 2CPS*AOV104 02/18/87 0.2224 4.3800 Yes 05/15/87 0.1542 4.3800 Yes 08/12/87 0.3824 4.3800 Yes 11/13/87 0.5748 4.3800 Yes 02/25/88 0.7364 4.3800 Yes 05/16/88 0.2604 4.3800 Yes 08/11/88 2.6124 4.3800 Yes 11/30/88 1.2164 4.3800 Yes 02/15/89 1.6878 4.3800 Yes 05/15/89 1.9550 4.3800 Yes 08/15/89 1.1424 4.3800 Yes 11/28/89 0.9764 4.3800 Yes 01/15/90 0.1274 4.3800 Yes 04/23/90 0.0444 4.3800 Yes 08/07/90 2.8420 4.3800 Yes 11/11/90 1.1830 4.3800 Yes
- VALVE ID 2CPS*AOV108 02/18/87 2.2724 4.3800 Yes 05/15/87 2.4020 4.3800 Yes
f.
i ~ $
a E
Page No. 24 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 08/12/87 1.6924 4.3800 Yes 11/10/87 1.4544 4.3800 Yes 02/25/88 1.8844 4.3800 Yes 05/16/88 2.1477 4.3800 Yes 08/10/88 2.1591 4.3800 Yes 11/30/88 2.0564 4.3800 Yes 02/16/89 2.0577 4.3800 Yes 05/16/89 1.7651 4.3800 Yes 08/17/89 2.0144 4.3800 Yes 11/29/89 1.7157 4.3800 Yes 01/17/90 3.3644 4.3800 Yes 04/24/90 1 '524 4.3800 Yes 08/09/90 1.7470 4.3800 Yes 10/29/90 6.4000 4.3800 No see App. B, Sect VII, Item 15 12/15/90 1.9180 4.3800 Yes
- VALVE ID 2CPS*AOV110 02/18/87 0.9924 4.3800 Yes 05/15/87 0.3024 4.3800 Yes 08/12/87 0.3424 4.3800 Yes 11/10/87 0.0951 4.3800 Yes 02/25/88 0.4274 4.3800 Yes 05/16/88 0.3764 4.3800 Yes 08/10/88 0.1497 4.3800 Yes 11/30/88 0.9154 4.3800 Yes 02/16/89 1.3404 4.3800 Yes 05/16/89 0.8150 4.3800 Yes 08/17/89 0.2974 4.3800 Yes 11/29/89 0.6544 4.3800 Yes 01/17/90 0.1004 4.3800 Yes 04/24/90 0.4804 4.3800 Yes 08/09/90 0.9620 4.3800 Yes 10/29/90 1.7700 4.3800 Yes
- PENETRATION Z-49
- VALVE ID 2CPS*AOV106 02/18/87 05/15/87 0.8524 1.0824 4.3800 4.3800 No Yes see App. B, Sect I, Item 1 08/12/87 0.5024 4.3800 Yes 11/13/87 0.8574 4.3800 Yes
hn lt w ~
Page No. 25 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 02/25/88 2.3244 4.3800 Yes 05/16/88 1.7084 4.3800 Yes 08/11/88 1.0594 4.3800 Yes 11/29/88 1.7044 4.3800 Yes 02/15/89 0.4830 4.3800 Yes 05/15/89 1.2451 4.3800 Yes 08/15/89 1.0704 4.3800 Yes 11/28/89 0.6691 4.3800 Yes 01/15/90 1.2574 4.3800 Yes 04/23/90 1.5104 4.3800 Yes 08/07/90 1.1806 4.3800 Yes 11/11/90 1.2500 4.3800 Yes
- PENETRATION Z-50 VALVE ID 2CPS*AOV105 02/18/87 0.7424 3.7500 Yes 05/15/87 0.5924 3.7500 Yes 08/12/87 1.2524 3.7500 Yes 11/13/87 0.0578 3.7500 Yes 02/25/88 0.0837 3.7500 Yes 05/16/88 1.3754 3.7500 Yes 08/10/88 1.8524 3.7500 Yes 11/30/88 3.7060 3.7500 Yes 02/16/89 0.5677 3.7500 Yes 05/15/89 2.3310 3.7500 Yes 08/16/89 5.5280 3.7500 No see App. B, Sect IV, Item 1 08/17/89 0.0970 3.7500 Yes 11/29/89 0.1004 3.7500 Yes 01/16/90 0.0184 3.7500 Yes 04/23/90 0.3114 3.7500 Yes 08/07/90 0.2970 3.7500 Yes 11/11/90 0.2690 3.7500 Yes
- VALVE ID 2CPS*AOV107 02/18/87 1.0524 3.7500 Yes 05/15/87 3.1924 3.7500 Yes 08/12/87 1.9924 3.7500 Yes 11/13/87 1.5250 3.7500 Yes 02/25/88 2.8824 3.7500 Yes 05/16/88 0.8824 3.7500 Yes
II C
~ ~
Page No. 26 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS?'OMMENTS LEAK RATE LIMIT 08/10/88 2.5654 3.7500 Yes 11/29/88 2.9274 3.7500 Yes 02/15/89 0.6677 3.7500 Yes 05/15/89 2.5054 3.7500 Yes 08/16/89 0.4460 3.7500 Yes 11/29/89 1.3171 3.7500 Yes 01/16/90 1.5264 3.7500 Yes 04/23/90 1.0134 3.7500 Yes 08/07/90 0.7520 3.7500 Yes 11/11/90 0.6720 3.7500 Yes
- PENETRATION Z-51 VALVE ID 2CPS*AOV109 02/19/87 1.5024 3.7500 Yes 05/15/87 0.1154 3.7500 Yes 08/12/87 0.6124 3.7500 Yes 11/10/87 1.2324 3.7500 Yes 02/25/88 0.2240 3.7500 Yes 05/16/88 0.8331 3.7500 Yes 08/11/88 0.6324 3.7500 Yes 11/30/88 2.0874 3.7500 Yes 02/16/89 1.7244 3.7500 Yes 05/16/89 2.0994 3.7500 Yes 08/17/89 2.8254 3.7500 Yes 11/30/89 3 '371 3.7500 Yes 01/17/90 1.7317 3.7500 Yes 04/24/90 1.1794 3.7500 Yes 08/09/90 1.2006 3.7500 Yes 10/30/90 7.7000 3.7500 No see App. B, Sect VII, Item 16 12/15/90 1.3130 3.7500 Yes
- VALVE ID 2CPS*AOV111 02/19/87 0.2942 3.7500 Yes 05/15/87 0.8824 3.7500 Yes 08/12/87 0.5142 3.7500 Yes 11/10/87 0.1942 3.7500 Yes 02/25/88 0.6914 3.7500 Yes 05/16/88 0.3543 3.7500 Yes 08/11/88 0.2384 3.7500 Yes 11/30/88 0.0444 3.7500 Yes
'I Cp a s
'1
Page No. 27 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 02/16/89 0.3484 3.7500 Yes 05/16/89 0.1444 3.7500 Yes 08/17/89 0.4634 3.7500 Yes 11/30/89 0.3237 3.7500 Yes 01/17/90 1.0797 3.7500 Yes 04/24/90 0.7054 3.7500 Yes 08/09/90 0.6340 3.7500 Yes 10/30/90 0.0100 3.7500 Yes
- PENETRATION Z-53A
- VALVE ID 2IAS*SOV164 06/10/86 0.7300 0.5000 No see App. B, Sect I, Item 1, 04/22/87 0.1650 0.4688 Yes 10/06/88 0.3536 0.4688 Yes 11/28/90 0.0546 0.4688 Yes
- VALVE ID 2IAS*V448 06/10/86 0.8000 0.9400 Yes 04/23/87 0.3710 0.9375 Yes 10/06/88 0.4731 0.9375 Yes 11/28/90 0.6240 0.9375 Yes
+* PENETRATION Z-53B
- VALVE ID 2IAS*SOV165 07/01/86 0.1650 0.5000 Yes 04/22/87 0.2250 0.4688 Yes 10/05/88 0.2370 0.4688 Yes 11/28/90 0.0730 0.4688 Yes
- VALVE ID 2IAS*V449 04/22/87 0.7424 0.9375 Yes 10/05/88 0.6417 0.9375 Yes 11/28/90 0.4940 0.9375 Yes
+* PENETRATION Z-53C
- VALVE ID 2IAS*SOV166 09/19/86 0.1310 0.5000 Yes 04/28/87 0.1630 0.4688 Yes
4 ) I I
Page No. 28 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/17/88 0.0695 0.4688 Yes 11/28/90 0.0040 0.4688 Yes
- VALVE ID 2IAS*SOV185 08/26/86 0.1550 0.5000 Yes 05/09/88 0.1592 0.4688 Yes 03/04/89 0.1900 0.4688 Yes 09/17/90 0.1850 0.4688 Yes
- PENETRATION Z-58
- VALVE ID 2CPS*SOV120 04/03/87 0.0250 0.6250 Yes 10/09/88 0.1550 0.6250 Yes 10/24/90 0.0780 0.6250 Yes
- VALVE ID 2CPS*SOV122 04/03/87 0.0250 0.6250 Yes 10/09/88 0.1550 0.6250 Yes 10/24/90 0.0810 0.6250 Yes
- PENETRATION Z-59
- VALVE ID 2CPS*SOV119 04/03/87 0.2710 0.6250 Yes 10/08/88 12/21/88 0.7477 0.1320 0.6250 0.6250 No Yes see App. B, Sect III, Item 19 10/24/90 0.0610 0.6250 Yes
- VALVE ID 2CPS*SOV121 04/03/87 0.2710 0.6250 Yes 10/08/88 12/21/88 0.7477 0.1320 0.6250 0.6250 No Yes see App. B, Sect III, Item 20 10/24/90 0.0610 0.6250 Yes
- PENETRATION Z-60A
- VALVE ID 2CMS*SOV60A 04/23/87 0.0050 0.2344 Yes 10/04/88 0.0092 0.2344 Yes 10/08/90 0.0050 0.2344 Yes
I Y I h LI T
~ ~r I
I
Page No. 29 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2CMS*SOV61A 04/23/87 0.0050 0.2344 Yes 10/04/88 0.0092 0.2344 Yes 10/08/90 0.0050 0.2344 Yes
- PENETRATION Z-60B
- VALVE ID 2CMS*SOV24A 05/29/86 0.0050 0.3000 Yes 04/27/87 0.0040 0.2344 Yes 10/05/88 0.0070 0.2344 Yes 10/19/90 0.0120 0.2344 Yes
- VALVE ID 2CMS*SOV24C 05/29/86 0.0070 0.3000 Yes 04/27/87 0.0070 0.2344 Yes 10/05/88 0.0075 0.2344 Yes 10/19/90 0.0340 0.2344 Yes
+* PENETRATION Z-60C
- VALVE ID 2CMS*SOV62A 04/23/87 0.0062 0.2344 Yes 10/04/88 0.0096 0.2344 Yes 09/16/90 0.0050 0.2344 Yes
- VALVE ID 2CMS*SOV63A 04/23/87 0.0062 0.2344 Yes 10/04/88 0.0096 0.2344 Yes 09/16/90 0.0050 0.2344 Yes
- PENETRATION Z-60D
- VALVE ID 2CMS*SOV32A 04/27/87 0.0070 0.2344 Yes 10/05/88 0.0076 0.2344 Yes 09/13/90 0.0300 0.2344 Yes
- VALVE ID 2CMS*SOV33A 04/27/87 0.0070 0.2344 Yes
tg
,1 t
Page No. 30 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 10/05/88 0.0076 0.2344 Yes 09/13/90 0.0300 0.2344 Yes
- PENETRATION Z-60E
- VALVE ID 2CMS*SOV60B 05/29/86 0.0880 0.3000 Yes 02/11/87 0.0140 0.2344 Yes 10/04/88 0.0101 0.2344 Yes 10/10/90 0.0050 0.2344 Yes
- VALVE ID 2CMS*SOV61B 05/29/86 0.0880 0.3000 Yes 02/11/87 0.0140 0.2344 Yes 10/04/88 0.0101 0.2344 Yes 10/10/90 0.0050 0.2344 Yes
- PENETRATION Z-60F
- VALVE ID 2CMS*SOV24B 05/30/86 0.0100 0.3000 Yes 05/07/88 0.1588 0.2344 Yes 01/07/90 0.1036 0.2344 Yes 11/03/90 0.0040 0.2344 Yes
- VALVE ID 2CMS*SOV24D 05/30/86 0.0170 0.3000 Yes 05/07/88 0.1540 0.2344 Yes 01/07/90 0.1043 0.2344 Yes 11/03/90 0.0070 0.2344 Yes
- PENETRATION Z-60G
- VALVE ID 2CMS*SOV62B 06/04/86 0.0350 0.2344 Yes 05/04/88 0.0090 0.2344 Yes 01/06/90 0.0160 0.2344 Yes 11/01/90 0.0110 0.2344 Yes
- VALVE ID 2CMS*SOV63B 06/04/86 0. 0352 0.2344 Yes
- 8 II J
Page No. 31 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 05/06/88 0.0090 0.2344 Yes 01/06/90 0.0160 0.2344 Yes 11/01/90 0.0110 0.2344 Yes
- PENETRATION Z-60H
- VALVE ID 2CMS*SOV32B 05/28/86 0.0060 0.3000 Yes 05/04/88 0.0080 0.2344 Yes 10/29/88 0.0105 0.2344 Yes 01/27/89 0.0082 0.2344 Yes 09/19/90 0.0110 0.2344 Yes
- VALVE ID 2CMS*SOV33B 05/28/86 0.0060 0.3000 Yes 05/04/88 0.0080 0.2344 Yes 10/29/88 0.0105 0.2344 Yes 01/27/89 0.0082 0.2344 Yes 09/19/90 0.0110 0.2344 Yes
- PENETRATION Z-61B
- VALVE ID 2CMS*SOV26A 05/30/86 0.0040 0.3000 Yes 05/06/88 0 '166 0.2344 Yes 01/09/90 0.0044 0.2344 Yes 10/03/90 0.0100 0.2344 Yes
- VALVE ID 2CMS*SOV26C 05/30/86 0.0090 0.3000 Yes 05/06/88 0.0222 0.2344 Yes 01/09/90 0.0280 0.2344 Yes 10/03/90 443.5870 0.2344 No see App. B, Sect VII, Item 17 12/20/90 0.0040 0.2344 Yes
- PENETRATION Z-61C
- VALVE ID 2CMS*SOV34A 05/28/86 0.0140 0.3000 Yes 05/03/88 0.0067 0.2344 Yes 01/08/90 0.0326 0.2344 Yes
M jI s
Page No. 32 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 11/02/90 0.0080 0.2344 Yes
- VALVE ID 2CMS*SOV35A 05/28/86 0.0140 0.3000 Yes 05/03/88 0.0067 0.2344 Yes 01/08/90 0.0326 0.2344 Yes 11/02/90 0.0080 0.2344 Yes
- PENETRATION Z-61E
- VALVE ID 2CMS*SOV26B 05/30/86 0.0170 0.3000 Yes 05/06/88 0.1010 0.2344 Yes 01/09/90 0.0292 0.2344 Yes 10/09/90 0.0090 0.2344 Yes
- VALVE ID 2CMS*SOV26D 05/30/86 0.0130 0.3000 Yes 05/06/88 0.1095 0.2344 Yes 01/09/90 0.0310 0.2344 Yes 10/09/90 0.0150 0.2344 Yes
- PENETRATION Z-61F
- VALVE ID 2CMS*SOV34B 05/28/86 0.0060 0.3000 Yes 05/05/87 0.0080 0.2344 Yes 05/03/88 0.0055 0.2344 Yes 01/06/90 0.0074 0.2344 Yes 09/19/90 0.0050 0.2344 Yes
- VALVE ID 2CMS*SOV35B 05/28/86 0.0060 0.3000 Yes 05/05/87 0.0080 0.2344 Yes 05/03/88 0.0055 0.2344 Yes 01/06/90 0.0074 0.2344 Yes 09/19/90 0.0050 0.2344 Yes
~ ( r Page No. 33 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-80
- VALVE ID 2SFC*V203 03/30/87 0.0110 0.4688 Yes 11/19/88 0.0140 0.4688 Yes 09/16/90 0.0137 0.4688 Yes
- VALVE ID 2 SF C*V2 04 04/01/87 0.1105 0.4688 Yes 10/13/88 11/19/88 0.6157 0.5757 0.4688 No 0.4688 No see App. B, Sect see App. B, Sect III, Item III, Item 21 21 12/06/88 0.3160 0.4688 Yes 09/16/90 0.1885 0.4688 Yes
- PENETRATION Z-88A
- VALVE ID 2RHS*MOV26A 05/21/86 0.0830 0.3000 Yes 04/02/87 0.0070 0.3125 Yes 12/29/88 0.0080 0.3125 Yes 11/12/90 0.0140 0.3125 Yes
- VALVE ID 2RHS*MOV27A 05/21/86 0.0150 0.3000 Yes 04/02/87 0.0070 0.3125 Yes 12/29/88 0.0185 0.3125 Yes 11/12/90 0.0130 0.3125 Yes
- PENETRATION Z-88B
- VALVE ID 2RHS*MOV26B 05/22/86 0.0390 0.3000 Yes 05/01/87 0.0140 0.3125 Yes 11/17/88 11/17/88 0.3820 0.2160 0.3125 0.3125 No Yes see App. B, Sect III, Item 22 11/09/90 0.2760 0.3125 Yes
- VALVE ID 2RHS*MOV27B 05/22/86 0.0270 0.3000 Yes 05/01/87 11/17/88 0.8824 0.1705 0.3125 No 0.3125 Yes see App. B, Sect I, Item 1
Page No.
03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT 11/09/90 0.2840 0.3125 Yes
- PENETRATION Z-89A
- VALVE ID 2LMS*SOV152 09/12/86 0.0080 0.2000 Yes 05/08/88 0.0630 0.2344 Yes 01/11/90 0.0130 0.2344 Yes 09/21/90 0.0270 0.2344 Yes
- VALVE ID 2LMS*SOV153 09/12/86 0.0110 0.2000 Yes 05/08/88 0.0610 0.2344 Yes 01/11/90 0.0118 0.2344 Yes 09/21/90 0,. 0260 0.2344 Yes
- PENETRATION Z-89C
- VALVE ID 2LMS*SOV156 04/29/86 0.0060 0.3000 Yes 09/12/86 0.0100 0.2000 Yes 05/08/88 0.0106 0.2344 Yes 01/11/90 0.0109 0.2344 Yes 09/22/90 0.0070 0.2344 Yes
- VALVE ID 2LMS*SOV157 04/29/86 0.0060 0.3000 Yes 09/12/86 0.0150 0.2000 Yes 10/05/86 0.0280 0.2000 Yes 05/08/88 0.0114 0.2344 Yes 01/14/90 0.0254 0.2344 Yes 09/22/90 0.0050 0.2344 Yes
- PENETRATION Z-90
- VALVE ID 2ICS*MOV148 07/11/86 0.0380 0.5000 Yes 02/20/87 1.0324 0.4688 No see App. B, Sect I, Item 1 11/01/88 0.0118 0.4688 Yes 09/13/90 0.0040 0.4688 Yes
h
'i
Page No. 35 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- VALVE ID 2ICS*MOV164 07/11/86 0.1010 0.5000 Yes 02/20/87 1.7800 0.1890 0.4688 No see App. B, Sect I, Item 1 11/01/88 0.4688 Yes 09/13/90 0.0040 0.4688 Yes
- VALVE ID 2RHS*V192 05/02/87 0.5824 0.2344 No see App. B, Sect I, Item 1 11/02/88 0.1013 0.2344 Yes 09/13/90 0.1250 0.2344 Yes
- PENETRATION Z-91A
- VALVE ID 2IAS*SOV167 08/25/86 0.3230 0.5000 Yes 05/08/88 0.4484 0.4688 Yes 10/06/88 0.3990 0.4688 Yes 09/17/90 0.4260 0.4688 Yes
- VALVE ID 2IAS*SOV184 09/19/86 0.0880 0.5000 Yes 04/28/87 0.2041 0.4688 Yes 10/17/88 0.1330 0.4688 Yes 11/28/90 0.0040 0.4688 Yes
- PENETRATION Z-91B
- VALVE ID 2IAS*SOV168 08/25/86 0.8424 0.5000 No see App. B, Sect I, Item 1 05/09/88 1.7364 0.4688 No see App. B, Sect II, Item 2 05/09/88 05/13/88 1.7630 0.1203 0.4688 0.4688 No Yes see App. B, Sect II, Item 2 03/03/89 0.0600 0.4688 Yes 11/28/90 0.0660 0.4688 Yes
- VALVE ID 2IAS*SOV180 08/25/86 05/09/88 0.6200 0.2149 0.5000 0.4688 No Yes see App. B, Sect I, Item 1 03/04/89 0.2050 0.4688 Yes 11/28/90 0.2880 0.4688 Yes
Page No. 36 03/25/91 APPENDIX A
SUMMARY
OF TYPE B AND C TEST RESULTS SECTION II TYPE C TEST DATE TOTAL LEAKAGE PASS? COMMENTS LEAK RATE LIMIT
- PENETRATION Z-92
- VALVE ID 2CPS*SOV133 04/02/87 0.0051 0.3125 Yes 10/23/88 0.0062 0.3125 Yes 10/20/90 0.0060 0.3125 Yes
- VALVE ID 2CPS*V51 04/02/87 5.2240 0.9375 No see App. B, Sect I, Item 1 05/19/87 1.4664 0.9375 No see App. B, Sect I, Item 1 10/23/88 11/23/88 1.4864 3.9504 0.9375 0.9375 No see see App. B, Sect Sect III, Item III, Item 23 No App. B, 23 12/28/88 0.3650 0.9375 Yes 10/20/90 0.7520 0.9375 Yes
- PENETRATION Z-96
- VALVE ID 2CPS*SOV132 04/09/87 1.8784 0.3125 No see App. B, Sect I, Item 1 05/19/87 0.0050 0.3125 Yes 10/25/88 0.0791 0.3125 Yes 10/15/90 0.0070 0.3125 Yes
- VALVE ID 2CPS*V50 04/10/87 2.2024 0.5570 0.9375 No see App. B, Sect I, Item 1 05/19/87 0.9375 Yes 10/26/88 0.6904 0.9375 Yes 10/16/90 0.5024 0.9375 Yes
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT APPENDIX B
SUMMARY
OF TYPE B AND C TEST FAILURES NMP2-ILRT
APPENDIX B SECTION I:
SUMMARY
OF TYPE B AND C FAILURES BETWEEN PREOPERATIONAL TEST AND COMMERCIAL OPERATION (MARCH 11,1988)
ITEM ¹ VALVE NUMBER DESCRIPTION OF FAILURE T e B Failures There were no failures between completion of the Type A Preoperational Test and the date of Commercial Operation.
T e C Failure Various Prior to Commercial Operation the Leakage Limits (acceptance criteria) were used as guide values only. These values were routinely exceeded as long as the maximum pathway total remained below 0.6 La. This problem was corrected by imposing ASME XI limits post Commercial Operation and by retesting and repairing any valve outside these limits in subsequent outages. Therefore no summary of failures is given for the time period between the completion of the Preoperational Test and Commercial Operation.
P2-ILRT APPENDIX B, PAGE 1 OF 12
APPENDIX B SECTION II:
SUMMARY
OF TYPE B AND C FAILURES FOR MAY 1988 OUTAGE EM ¹ VALVE NUMBER DESCRIPTION OF FAILURE T e B Failures Pen. Z-74 Leakage into primary containment. Penetration is a blank flanged penetration. Upon disassembly it was discovered that the inner "0" ring for the penetration was missing. "0" ring was replaced. Penetration retested satisfactorily on 5/13/88.
T e C Failure
,2 2IAS+SOV1 68 Leakage through seat. Valve was disassembled. Seat cleaned and disc replaced. Valve retested satisfactorily on 5/13/88.
P2-ILRT APPENDIX B, PAGE 2 OF 12
f APPENDIX B SECTION III:
SUMMARY
OF TYPE B AND C FAILURES FOR OCTOBER 1988 OUTAGE EM ¹ VALVE NUMBER DESCRIPTION OF FAILURE There were no Type B failures for the October 1988 outage.
T e C Failures 2MSS+SOV97A Leakage through seat. Valve was disassembled. Seat was lapped and disc replaced. Valve reassembled and retested using new acceptance criteria provided by Engineering. Valve retested satisfactorily on 12/2/88.
2MSS%AOV7B Leakage through seat. Valve was disassembled. Seat and plug lapped. Valve reassembled and stroked by normal means. Valve retested satisfactorily on 12/24/88.
2MSS%SOV97D Leakage through seat. Valve was disassembled. Seat was lapped and disc replaced. Valve reassembled and retested using new acceptance criteria provided by Engineering. Valve retested satisfactorily on 12/20/88.
2MSS%MOV1 B Leakage through seat. Valve was disassembled. Seat and disc cleaned, Valve reassembled and stroked by normal means. Valve retested satisfactorily on 12/16/88.
2RHS%MOV30A Leakage through seat. Valve was disassembled. Disc seal was replaced due to dirt in valve. Valve was reassembled.
Valve retested satisfactorily on 1/11/89.
2RHS+MOV15A Valve failed to seat tightly. Packing replaced and subsequently readjusted. Valve retested satisfactorily on 1/14/89.
P2-ILRT APPENDIX B, PAGE 3 OF 12
ITEM ¹ VALVE NUMBER DESCRIPTION OF FAILURE 2RHS%AOV1 6A Valve failed to seat tightly. Indicator shaft adjusted and valve repacked. Seats cleaned. Valve retested satisfactorily on 1/15/89.
2RHS%AOV39A Boundary valve found not tightly closed. Boundary valve reclosed. Valve retested satisfactorily on 1/9/89.
2RHS "MOV40A Test volume found not fully drained. Additionally found a loose test connection to Leak Rate Monitor. Valve retested satisfactorily on 1/12/89 after draining test volume and tightening fitting.
10 2CSH+AOV108 Leakage through seat. Maximum Pathway value for .6 La exceeded on this test. Readjusted valve limit switches which were determined to be holding valve open at bottom of travel.
Valve retested satisfactorily on 1/21/89.
2ICS+MOV136 Leakage through seat. Valve was disassembled. Cleaned seats and reassembled valve. Valve retested satisfactorily on 1 2/20/88.
2CCP+ RV171 Valve tested in conjunction with 2CCP" MOV15B. Test reperformed using different boundary lineup to isolate leakage through each valve. Valve retested satisfactorily on 10/21/88.
13 2RCS%V59A Leakage through seat. Replaced valve. New valve tested satisfactorily on 11/3/88.
14 2RCS+V90A Leakage through seat. Replaced valve. New valve tested satisfactorily on 11/4/88.
15 2RCS+V60B Leakage through seat. Replaced valve. New valve tested satisfactorily on 11/5/88.
16 2DFR+MOV139 Post maintenance test for valve operator maintenance. Valve tested satisfactorily on 12/18/88.
P2-ILRT APPENDIX B, PAGE 4 OF 12
ITEM 4 VALVE NUMBER DESCRIPTION OF FAILURE 2CCP%MOV122 Boundary valve found not tightly closed. Valve retested satisfactorily on 12/17/88.
2CCP" MOV1 24 Boundary valve found not tightly closed. Valve retested satisfactorily on 12/17/88.
2CPS+SOV1 19 Leakage through seat. Valve was disassembled. Replaced disc and seals. Valve reassembled and stroked. Valve retested satisfactorily on 12/21/88.
20 2CPS+SOV121 Valve failed due to leakage through seat of 2CPS "SOV119 (see item 18). Valve retested satisfactorily on 12/21/88 after repairs made to valve 2CPS "SOV119.
21 2SFC%V204 Leakage through seat. Valve found to be binding. Valve packing replaced. Retested satisfactorily on 12/6/88.
22 2RHS% MOV26B Leakage through seat. Valve flushed using air. Valve retested satisfactorily on 11/17/88.
23 2CPS+V51 Leakage through seat. Valve was disassembled and seat lapped. Valve retested satisfactorily on 12/28/88.
P2-ILRT APPENDIX B, PAGE 5 OF 12
APPENDIX B SECTION IV:
SUMMARY
OF TYPE B AND C FAILURES FOR SEPTEMBER 1989 OUTAGE EM ¹ VALVE NUMBER DESCRIPTION OF FAILURE T e B Failures There were no Type B failures for the September 1989 outage.
T e C Failures 2CPS%AOV105 Leakage through seat. Valve was disassembled. Soft seats and backup "0" rings replaced. Valve retested satisfactorily on 8/17/90.
P2-ILRT APPENDIX B, PAGE 6 OF 12
f 1t l
APPENDIX B SECTION V:
SUMMARY
OF TYPE B AND C FAILURES FOR JANUARY 1990 OUTAGE EM ¹ VALVE NUMBER DESCRIPTION OF FAILURE T e 8 Failures There were no Type B failures for the January 1990 outage.
T e C Failures There were no Type C failures for the January 1990 outage.
P2-ILRT APPENDIX B, PAGE 7 OF 12
t 't f P
APPENDIX B SECTION VI:
SUMMARY
OF TYPE B AND C FAILURES FOR MAY 1990 OUTAGE EM ¹ VALVE NUMBER DESCRIPTION OF FAILURE T BF il res There were no Type B failures during the May 1990 outage. It was discovered however that a number of Type B tests had been omitted from the program during this outage. These test omissions are discussed in LER 90-10.
T eCFil re There were no Type C failures during the May 1990 outage.
P2-ILRT APPENDIX B, PAGE 8 OF 12
t 'I I
APPENDIX B SECTION VII:
SUMMARY
OF TYPE B AND C FAILURES FOR FIRST REFUELING OUTAGE ITEM ¹ VALVE NUMBER DESCRIPTION F FAILURE T e B Failure There were no Type B failures during the First Refueling Outage.
T e C Failures 2RDS+AOV132 Leakage through seat. Unable to achieve test pressure. Valve was disassembled. Valve gaskets and packing were replaced.
Valve retested satisfactorily on 11/6/90.
2MSS "MOV208 Leakage through seat. Valve was stroked open and seats flushed. Valve was then reclosed by normal means. Valve retested satisfactorily on 11/30/90.
2MSS%SOV97A Leakage through seats. Valve was stroked open and seats flushed. Valve was then reclosed by normal means. Valve retested satisfactorily on 10/1/90.
2MSS "AOV6C Leakage through seats. Valve was disassembled. Seats were lapped, disk replaced and valve body modified by addition of a new strut internal to the valve body. Valve was reassembled and stroked by normal means. Valve retested satisfactorily on 1 2/25/90.
2MSS "AOV6D Leakage through seats. Valve was disassembled. Seats were lapped and valve reassembled. Valve retested satisfactorily 12/3/90.
2RHS+AOV16A Leakage through seats. Unable to achieve test pressure.
Valve disassembled and seats lapped. Valve reassembled and retested to new acceptance criteria from Engineering. Valve retested satisfactorily on 11/21/90.
2RHS+AOV1 6C Leakage through seats. Valve disassembled and seats lapped.
Valve reassembled and retested to new acceptance criteria from Engineering. Valve retested satisfactorily on 11/21/90.
P2-ILRT APPENDIX B, PAGE 9 OF 12
0 ITEM ¹ VALVE NUMBER DESCRIPTION OF FAILURE 2RHS+AOV39B Leakage through seat. Unable to achieve test pressure. Valve was disassembled. Seats lapped, new pressure seals and packing installed. Valve retested to new acceptance criteria from Engineering. Valve retested satisfactorily 11/16/90.
9 2CSH%AOV108 Leakage through seat. Unable to achieve test pressure. Valve was disassembled. Seat lapped, disc skim cut and lapped, new gasket, packing and pressure seals installed. Valve retested to new acceptance criteria from Engineering. Valve retested satisfactorily on 11/20/90.
10 2CSL%AOV101 Leakage through seat. Maximum Pathway value for .6 La exceeded on this test. Valve was disassembled. Seat lapped, disc skim cut and lapped, new gasket, packing and pressure seals installed. Valve retested to new acceptance criteria from Engineering. Valve retested satisfactorily on 11/20/90.
2ICS% MOV1 28 Leakage through seat. Valve was disassembled, Stem replaced disc and seat lapped. Valve reassembled and retested satisfactorily 12/6/90.
2ICS%AOV156 Leakage through seat. Valve was disassembled. Valve seat and disc cleaned, new packing gaskets and seal ring installed.
Valve retested satisfactorily on 12/11/90.
2WCS "MOV112 Leakage through seat. Valve stroked open and flushed. Valve retested satisfactorily on 11/14/90.
14 2DFR% MOV140 Valve not stroking fully. Leakage through seat. Reset limit switch and declutch mechanism. Valve retested satisfactorily on 12/21/90.
15 2CPS%AOV108 Leakage through seat. Valve seats flushed with demineralized water and dried. Valve retested satisfactorily on 12/15/90.
P2-ILRT APPENDIX B, PAGE 10 OF 12
F i '
ITEM ¹ VALVE NUMBER DESCRIPTION OF FAILURE 2CPS%AOV109 Leakage through seat. Valve seats cleaned. Valve retested satisfactorily on 12/15/90.
2CMS "SOV26C Leakage through seat. Valve was disassembled. Replaced Pilot disc, piston ring and spring. Valve retested satisfactorily on 12/20/90.
P2-ILRT APPENDIX B, PAGE 11 OF 12
APPENDIX B SECTION VIII:
OF TYPE B AND C FAILURES
'UMMARY FAILURE TO MEET ACCEPTANCE CRITERIA OF 10CFR50 APPENDIX J SECTION III.C.3.a The acceptance criteria specified in 10CFR50 Appendix J, Section III.C.3.a was exceeded during the October 1988 outage and the First Refueling outage. During these outages the "as found" maximum pathway total for Type B and Type C tests exceeded 0.6 La. A description of these events is provided below.
0 ober 1988 Ou a e During this outage valve 2CSH "AOV108 was found to be leaking excessively.
Efforts to quantify the leakage resulted in a determination that the valve leakage was 205.194 SCFH. This was added to the Type B and C total leakage calculated in procedure N2-ISP-CNT-R003. It was discovered that this leakage resulted in the maximum pathway total exceeding the Appendix J Acceptance Criteria of 0.6 La. A review of test results indicates that no other single valve would have caused the 0.6 La limit to have been exceeded. Additionally the results of a minimum pathway analysis yielded values less than La. The subject valve was repaired (see Appendix C,Section III, Item 10). Prior to restarting the plant from the outage it was determined, in accordance with N2-ISP-CNT-R003, that the "as left" maximum pathway leakage was below 0.6 La.
First Refuelin Ou a e On 9/17/90, during routine Type C testing, valve 2CSL"AOV101 was found to be leaking excessively. Efforts to quantify the leakage resulted in a determination that the valve leakage was 856.480 SCFH. This was added to the Type B and C total leakage calculated in procedure N2-ISP-CNT-R003. It was discovered that this leakage resulted in the maximum pathway total exceeding the Appendix J Acceptance Criteria of 0.6 La. Subsequent to this date four valves also exhibited high leakage rates and could not be pressurized to test pressure (Pa). These valves are 2RHS "AOV16A, 2RHS "AOV39B, 2RDS "AOV132 and 2CSH "AOV108. A minimum pathway analysis was performed as each of these valves failed and the results indicated values less than La. The subject valves were repaired and retested.
Prior to restarting the plant from the outage it was determined, in accordance with N2-ISP-CNT-R003, that the "as left" maximum pathway leakage was below 0.6 La.
P2-ILRT APPENDIX B, PAGE 12 OF 12
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 2 ILRT FINAL REPORT APPENDIX C PRE-TEST PENALTY LEAKAGE RESULTS (MINIMUMPATH)
MINIMUMPATH PENETRATION NO. SC H
~RAY'-4A
.109 .000142 Z-4B .188 .000244 Z-33A .021 .000027 Z-33B .006 .000008 Z-34A .009 .000012 Z-34B .005 .000007 Z-46A ~ 014 .000018 Z-47 .196 .000255 Z-89A .026 .000034 Z-89C .005 .000007 HIGHEST ECCS DIVISION 5.434 .007064 SCRAM DISCH.VOL VENT 5. DRAIN VALVES .046 .000060 H2 RECOMBINER 5.450 ~ 007085 CMS ADDITIONALPENALTIES .497 .000646 ADDITIONALPENALTIES FROM VALVE LINEUP CHANGE EVALUATIONS:
Z-19 .742 ~ 000965 Z-23 ~ 006 .000008 Z-53A ~ 055 .000072 Z-53B ~ 073 .000095 Z-80 .014 .000018 Z-92 .006 .000008 Z-96 .007 .000009 TOTAL 12.909 .0168
.0013 % PER DAY / SCFH NMP2-ILRT
NIAGARA MOHAWK POWER CORPORATION GENSYS G100 NINE MILE POINT UNIT 2 VERSION 2.0 INTEGRATED LEAK RATE TEST RESULTS 01/16/91 RUN ID 66480939 PAGE 1 OF 2 APPENDIX D TYPE A TEST LEAKAGE AND ERROR PARAMETERS TIME MASS POINT TOTAL TIME DATA ELAPSED Lam UCL Lam LS FIT UCL SET REAL HRS % DAY I DAY DAY % DAY DAY Al 01/05/91:13:15:00 0.00 0.00000 0.00000 0.00000 0.00000 0.00000 A2 01/05/91:13:30:00 0.25 0.05356 0.00000 0.05356 0.00000 0.00000 A3 Ol/05/91 13:45'00 0.50 0.24573 0.00000 0.24573 0.24573 0.00000 A4 01/05/91:14:00:00 0.75 0.33296 0.54096 0.32130 0.34074 0.80190 A5 01/05/91 14 15'00 1.00 0.31034 0.41124 0.27414 0.33428 0.75928 A6 01/05/91:14:30:00 1.25 0.24265 0.34520 0.19566 0.28060 0.68317 A7 01/05/91 14 45 00 1.50 0 '2589 0.29715 0.21502 0.26114 0.58442 A8 01/05/91:15:00:00 1.75 0.17916 0.25245 0.14844 0.21815 0.51347 A9 01/05/91:15:15:00 2.00 0.20574 0.26826 0.24300 0.23054 0.48462 Alo Ol/05/91:15:30:00 2.25 0.21458 0.26444 0.22931 0.23335 0.45803 All 01/05/91:15:45:00 2.50 0.20606 0.24719 0.19848 0.22447 0.42949 A12 01/05/91'16 00'00 2.75 0.22296 0.26114 0.25074 0.23465 0.42322 A13 01/05/91:16:15:00 3.00 0.22071 0.25277 0.21690 0.23205 0.40736 A14 01/05/91:16:30:00-. 3.25 0.21624 0.24387 0.20900 0.22783 0.39254 A15 01/05/91:16:45'00 3.50 0.21546 0.23924 0.21555 0.22620 0.38151 A16 Ol/05/91:17:00:00 3.75 0.21901 0.24001 0.22788 0.22786 0.37492 A17 01/05/91:17'15 00 4.00 0.21994 0.23840 0.22250 0.22791 0.36789 A18 01/05/91:17:30:00 4". 25 0.21828 0.23470 0.21462 0.22621 0.36018 A19 Ol/05/91:17:45:00 4.50 0.21722 0.23189 0.21525 0.22493 0.35351 A20 01/05/91:18:00:00 4.75 0.21368 0.22731 0.20519 0.22188 0.34597 A21 01/05/91:18:15:00 5.00 0.20981 0.22269 0.20076 0.21850 0.33860 A22 01/05/91:18:30 00 5.25 0.20402 0.21705 0.18965 0.21367 0.33054 A23 01/05/91'18:45 00 5.50 0.20492 0.21681 0.21245 0.21344 0.32661 A24 01/05/91:19:00:00 5.75 0.20391 0.21484 0.20476 0.21199 0.32184 A25 01/05/91'19 15'00 6.00 0.20294 0.21301 0.20386 0.21060 0.31740 A26 Ol/05/91:19:30:00 6.25 0.20039 0.21001 0.19547 0.20814 0.31225 A27 01/05/91:20:00:00 6.75 0.19984 0.20868 0.20287 0.20670 0.30883 A28 01/05/91:20:15:00 7.00 0.19779 0.20614 0.19515 0.20462 0.30420 A29 01/05/91:20:30:00 7.25 0.19571 0.20369 0.19300 0.20252 0.29978 A30 01/05/91:20:45:00 7.50 0.19313 0.20093 0.18834 0.20007 0.29522 A31 01/05/91:21:00:00 7.75 0.19151 0.19893 0.19091 0.19828 0.29138 A32 01/05/91:21:15:00 8.00 0.19030 0.19733 0.19155 0.19680 0.28796 Leakage Criteria .75La = 0.8250 %/DAY
NIAGARA MOHAWK POWER CORPORATION GENSYS G100 NINE MILE POINT UNIT 2 VERSION 2.0 INTEGRATED LEAK RATE TEST RESULTS 01/16/91 RUN ID 66480939 PAGE 2 OF 2 APPENDIX D TYPE A TEST LEAKAGE AND ERROR PARAMETERS TIME PRESSURE TEMPERATURE MASS DATA ELAPSED TOTAL VAPOR DRY BULB DEW POINT AIR SET REAL HRS PSIA PSIA DEG F DEG F LBM Al Ol/05/91:13 15'00 0.00 56.671 .4736 84.626 77.898 138449.1 A2 01/05/91:13:30:00 0.25 56.668 .4726 84.609 77.834 138448.4 A3 01/05/91:13:45:00 0.50 56.663 .4725 84.587 77.827 138442.0 A4 Ol/05/91:14:00:00 0.75 56.660 .4747 84.563 77.974 138435.2 A5 01/05/91:14:15:00 1.00 56.657 .4734 84,554 77.889 138433.3 A6 01/05/91:14:30:00 1.25 56.654 .4724 84.528 77.821 138435.0 A7 Ol/05/91:14:45'00 1.50 56.652 .4737 84.513 77.908 138430.5 A8 01/05/91:15:00:00 1.75 56.649 .4705 84.501 77.693 138434.1 A9 01/05/91:15:15:00 2.00 56.646 .4746 84.483 77.967 138421.1 Alo Ol/05/91:15:30:00 2.25 56.644 .4743 84.474 77.946 138419.4 All 01/05/91'15'45'00 2.50 56.642 .4734 84.459 77.882 138420.5 A12 01/05/91:16:00:00 2.75 56.638 .4746 84.453 77.962 138409.4 A13 01/05/91:16:15:00 3.00 56.637 .4741 84.439 77.931 138411.6 A14 01/05/91:16:30:00 3.25 56.635 .4743 84.423 77.947 138409.9 A15 01/05/91:16:45:00 3.50 56.632 .4737 84.417 77.907 138405.6 A16 Ol/05/91:17:00:00 3.75 56.630 .4756 84.403 78.027 138399.8 A17 01/05/91'17'15'00 4.00 56.628 .4751 84.396 77.996 138397.8 A18 01/05/91:17:30:00 4.25 56.626 .4745 84.387 77.957 138396.5 A19 01/05/91:17:45:00 4.50 56.624 .4744 84.382 77.951 138393.3 A20 01/05/91:18:00:00 4.75 56.622 .4737 84.370 77.908 138392.9 A21 01/05/91:18:15:00 5.00 56.621 .4739 84.365 77.921 138391.2 A22 01/05/91:18:30 00 5.25 56.620 .4735 84.357 77.895 138391.7 A23 01/05/91:18:45:00 5.50 56.618 .4763 84.350 78.076 138381.7 A24 01/05/91:19:00:00 5.75 56.616 .4754 84.342 78.017 138381.2 A25 Ol/05/91:19:15:00 6.00 56.615 .4758 84.338 78.044 138378.6 A26 01/05/91:19:30:00 6.25 56.614 .4756 84.330 78.031 138378.7 A27 01/05/91:20:00:00 6.75 56.610 .4760 84.321 78.058 138370.1 A28 01/05/91:20:15:00 7.00 56.609 .4758 84.312 78.046 138370.3 A29 01/05/91:20:30:00 7.25 56.608 .4754 84.314 78.016 138368.4 A30 01/05/91:20:45:00 7.50 56.606 .4752 84.300 78.006 138367.6 A31 01/05/91 21:00:00 7.75 56.605 .4761 84.296 78.065 138363.8 A32 01/05/91:21:15:00 8.00 56.603 .4761 84.289 78.064 138360.7
NIAGARA MOHAWK POWER CORPORATION 'ENSYS G100 NINE MILE POINT UNIT 2 VERSION 2. 0 INTEGRATED LEAK RATE TEST RESULTS 01/16/91 RUN ID 66480939 PAGE 1 OF 2 APPENDIX E VERIFICATION TEST PARAMETERS MASS POINT TOTAL TIME DATA REAL Lo LIMIT < Lc < LIMIT LIMIT < Lc < LIMIT SET TIME % DAY DAY % DAY % DAY DAY % DAY % DAY V1 01/05/91:22:30:00 1.01322 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 V2 01/05/91:22:45:00 1.01244 0.00000 0.88090 0.00000 0.00000 0.88090 0.00000 V3 01/05/91:23:00:00 1.01322 0.00000 1.00564 0.00000 0.00000 1.00564 0.00000 V4 01/05/91:23:15:00 1.01478 0.93008 0.91783 1.48008 0.93132 0.89421 1.48132 VS 01/05/91:23:30:00 1.01400 0.92930 0.99425 1.47930 0.93054 1.01760 1.48054 V6 01/05/91:23:45:00 1.01400 0.92930 0.96630 1.47930 0.93054 0.94323 1.48054 V7 01/06/91:00:00:00 1.01400 0.92930 0.94380 1.47930 0.93054 0.92760 1.48054 V8 01/06/91:00:15:00 1.01400 0.92930 0.97326 1.47930 0.93054 0.99650 1.48054 V9 01/06/91: 00: 30: 00 1.01400 0.92930 1.00596 1.47930 0.93054 1.02914 1.48054 V10 01/06/91: 00: 45: 00 1.01400 0.92930 1.01716 1.47930 0.93054 1.01547 1.48054 V11 01/06/91:01:00:00 1.01322 0.92852 1.04227 1.47852 0.92977 1.05744 1.47977 V12 01/06/91:01:15:00 1.01400 0.92930 1.03314 1.47930 0.93054 1.00024 1.48054 V13 01/06/91:01:30:00 1.01400 0.92930 1.03678 1.47930 0.93054 1.02614 1.48054 V14 01/06/91:01:45:00 1.01322 0.92852 1.03098 1.47852 0.92977 1.00518 1.47977 V15 01/06/91:02:00:00 1.01244 0.92774 1.02780 1.47774 0.92899 1.00869 1.47899 V16 01/06/91:02:15:00 1.01322 0.92852 1.02640 1.47852 0.92977 1.01218 1.47977 V17. 01/06/91:02:30:00 1.01322 0.92852 1.02649 1.47852 0.92977 1.01642 1.47977
f' NIAGARA MOHAWK POWER CORPORATION GENSYS G100 NINE MILE POINT UNIT 2 VERSION 2,0 INTEGRATED LEAK RATE TEST RESULTS 01/16/91 RUN ID 66480939 PAGE 2 OF 2 APPENDIX E VERIFICATION TEST PARAMETERS TIME PRESSURE TEMPERATURE MASS DATA ELAPSED TOTAL VAPOR DRY BULB DEW POINT AIR SET REAL HRS PSIA PSIA DEG F DEG F LBM Vl 01/05/91:22:30:00 0.00 56.576 .4761 84.267 78.063 138299.8 V2 01/05/91:22:45:00 0.25 56.570 .4762 84.258 78.066 138287,1 V3 01/05/91:23:00:00 0.50 56.564 .4772 84.254 78.133 138270.9 V4 01/05/91:23:15:00 0.75 56.558 .4741 84.263 77.934 138261.2 VS 01/05/91:23:30:00 1.00 56.552 .4769 84.256 78.116 138241.2 V6 01/05/91:23:45:00 1.25 56.546 .4753 84.251 78.008 138231.9 01/06/91'00'00:00 1.50 56.540 .4752 84,241 78.004 138219.7 VB 01/06/91:00:15:00 1.75 56.534 .4773 84.242 78.143 138199.3 V9 01/06/91:00 30 00 2.00 56.527 .4786 84.233 78.225 138181.2 V10 01/06/91:00:45:00 2.25 56.521 .4775 84.237 78.156 138168.2 Vll 01/06/91:01:00:00 2.50 56.515 .4798 84.237 78.306 138147.5 V12 01/06/91:01:15:00 2.75 56.509 .4758 84.242 78.043 138141.3 V13 01/06/91:01:30:00 3.00 56.503 .4785 84.232 78.221 138122.4 01/06/91:01:45:00 3.25 56.497 .4769 84.232 78.116 138111.6 V15 01/06/91:02:00:00 3.50 56.491 .4770 84.233 78.120 138096.4 V16 01/06/91 02 15 00 3.75 56.485 .4777 84.227 78.169 138081.1 V17 01/06/91:02:30:00 4.00 56.479 .4778 84.230 78.174 138065.5