Notifies NRC That TVA Implemented Commitment to Install & Make Operational SPDS & Certifies That SPDS Fully Meets Requirements of NUREG-0737,Suppl 1,taking Into Account Info Provided in NUREG-1342,per GL 89-06
ML18037A515
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 10/19/1993
From: Salas P
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-1342, RTR-NUREG-737, TASK-1.D.2, TASK-TM GL-89-06, GL-89-6, TAC-M51225, TAC-M73636, TAC-M74612, NUDOCS 9310260068
Download: ML18037A515 (12)


Text

ACCEI ERAT 9 DOCU1VlENT DISTR UTION.SYSTEM REGULA INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9310260068 DOC.DATE: 93/10/19 NOTARIZED: NO DOCKET FACIL:50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 AUTH.NAMB AUTHOR AFFILIATION SALAS)P.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION

.Document Control Branch (Document Control Desk)

D NOTES:

SUBJECT:

Notifies NRC that TVA implemented commitment to install I

make operational SPDS 6 certifies that SPDS fully meets requirements of NUREG-0737,Suppl l,taking in account info provided in NUREG-1342,per GL 89-06.

DISTRIBUTION CODE:

A004D COPIES RECEIVED:LTR ENCL SIZE:

S TITLE: Safety Parameter Display System (Item 1.D.2) Generic Ltr 89-06 Respon

/

RECIPIENT ID CODE/NAME NRR/PD3-3 TRIMBLE,D INTERNAL: NRR/DORS/OGCB OC/LFDCB'ES/DSIR/EIB EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

0 1

1 1

1 RECIPIENT ID CODE/NAME PD2-4-PD NRR/DRCH/HHFB 01 NSIC COPIES LTTR ENCL 1

1 2

2 1

1 1

1 D

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LINIS FOR DOCUMENTS YOU DON'T NEEDI D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 12 ENCL 11

0 1(

Tennessee Valley Authority. Post Office Box 2000. Decatur. Afabarna 35609 OCT Xg t993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of Tennessee Valley Authority Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN)

COMPLETZON NUREG-0737 (TM1 ACTION PLAN)i ZTEM I'E 2 PLANT SAFETY PARAMETER DISPLAY CONSOLEi AND CERTIFICATION ZN ACCORDANCE WITH GENERIC LETTER 89 06 (MPAS F 009' 072 AND F 075)

(TAC NOS ~ M51225I M73636 AND M74612)

This letter notifies NRC that TVA has implemented its commitment to install and make operational a Safety Parameter Display System (SPDS),

and certifies that the SPDS fully meets the requirements of NUREG-0737, Supplement 1, taking into account the information provided in NUREG-1342.

As requested by Generic Letter 89-06 (Reference 1), photographs are available that show the control room overview and SPDS workspaces, the SPDS hardware and their workspace locations, and the SPDS keyboard.

Color screen prints of the individual SPDS display pages were also made during power operations.

These screen prints provide as accurate a representation of the SPDS display screens as would color photographs.

There are no hard-wired displays associated with the BFN SPDS.

The completed SPDS checklist and the above documentation will be maintained at BFN for three years from the date of this letter.

50I22 9310260068

'sf31019 PDR ADOCK. 05000260 p

PDR

il I

U.

S. Nuclear Regulatory Commission OgT %9 1993 In Reference 2,

TVA committed to implement an SPDS on Unit 2 before Cycle 7 startup.

The final design description for the SPDS was provided by TVA in References 3 and 4.

The initial Safety Evaluation Report (SER) of, the SPDS design description was documented in Reference 5.

TVA responded to the SER open items in Reference 6.

NRC concluded; in a Supplemental SER that TVA's SPDS design description fully met the requirements of NUREG-0737, Supplement 1 (Reference,7).

I Please update the Safety Issues Management System database to show these items being implemented on BFN,Unit 2 as of the date of this letter.

A summary li:st of commitments contained in this letter is provided as an enclosure.

If you have any questions, please telephone

.me at (205) 729-2636.

Sincerely.,

o Salas Manager of Site Licensing cc:

See page 4

4)

~

LL

U.S. Nuclear Regulatory Commission OCT i 9 1993

References:

1)

NRC letter to All Licensees of Operating

Plants, Applicants for Operating Licenses and Holders of Construction Permits, dated April 12,
1989, Task Action Plan Item I.D.2 Safety Parameter Display System 10 CFR

$50.54(f)

(Generic Letter No. 89-06) 2)

TVA letter to NRC, dated April 7, 1987, Safety Parameter Display System (SPDS)

Schedule for

Response

to Request for Additional Information 3)

TVA letter to NRC, dated October 22,

1990, Notification of Implementation of NUREG-.0737 (TMI Action Plan),

Item I.D.2.1, Safety Parameter Display System (SPDS),

Phase I Installation and Final Design Description 4)

TVA letter to NRC, dated December 11'990'I Notification of Implementation of NUREG-0737 (TMI Action Plan),

Item I.D.2.1, Safety Parameter Display System (SPDS), Final Design Description 5)

NRC letter to TVA, dated March 6, 1991, Interim and Final Design of the Safety Parameter Display System at the Browns Ferry Nuclear Plant 6)

TVA letter to NRC, dated December 17,

1991, Safety Parameter Display System (SPDS),

Response to NRC Safety Evaluation Report (SER)

Open Items 7)

NRC letter to TVA, dated February 5,

1992, Safety Parameter Display System Browns Ferry Nuclear Plant,, Un'its 1, 2, and 3)

0 U

)

U.S. Nuclear Regulatory Commission OCT 1 ~

1993 cc (Enclosure):

Mr. R. V. Crlenjak, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW,, Suite 2900

Atlanta, George;a 30323 NRC Resident Inspector Browns Ferry Nuclear Plant-Route 12, Box 637
Athens, Alabama 35611 Mr. J.

F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. D.

C. Trimble, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

i~

0 l

W ~

~a

\\

ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant (BFN)

Summar of Commitments The completed SPDS checklist, color screen prints of the individual SPDS display pages, and photographs showing the control room overview, SPDS workspaces, the SPDS hardware and workspace locations, and the SPDS keyboard will be maintained at, BFN for three years from the date of this letter.

0

'4

~

C~

'I

~ r