ML18037A393

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-259/93-25,50-260/93-25 & 50-296/93-25 on 930619-0716 & Notice of Violation
ML18037A393
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 07/29/1993
From: Crlenjak R
NRC Office of Inspection & Enforcement (IE Region II)
To: Medford M
Tennessee Valley Authority
Shared Package
ML18037A394 List:
References
NUDOCS 9308060022
Download: ML18037A393 (5)


See also: IR 05000259/1993025

Text

0

JOL 29 Igcg

Docket Nos. 50-259,

50-260,

and 50-296

License

Nos.

DPR-33,

DPR-52,

and

DPR-68

Tennessee

Valley Authority

ATTN:

Dr. Hark 0. Hedford

Vice President,

Technical

Support

3B Lookout Place

1101 Harket Street

Chattanooga,

TN

37402-2801'entlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NOS. 50-259/93-25,

50-260/93-25,

AND

50-296/93-25)

This refers to the inspection

conducted

by C. A. Patterson

of this office on

June

19,

1993 - July 16,

1993.

The inspection

included

a review of activities

authorized for your Browns Ferry facility.

At the conclusion of the

inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

report.

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

certain of your activities appeared

to be in violation of NRC requirements,

as specified in the enclosed

Notice of

Violation.

We are concerned

about the violation describing the required

action to take within one hour for an inoperable reactor protective

system

trip channel

because

the plant operators'id

not have adequate

information

available to determine

the necessary

and timely actions to take.

In addition,

the enclosed

Inspection

Report identifies activities that violated

NRC

requirements

that will not be subject to enforcement

because

the licensee's

efforts in identifying and/or correcting the violation met the criteria

specified in Section VII.B of the Enforcement Policy.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document the specific actions taken

and any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice",

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

93080b0022

930729

PDR

ADOCK 05000259

Q

PDR

JUL p g

(()~~

Tennessee

Valley Authority

2

The responses

directed

by this letter and its enclosures

are not subject to

the clearance

procedures

of the Office of Management

and Budget

as required

by

the Paperwork Reduction Act of 1980,

Pub.

L. No.96-511.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

(Original signed by J. Crlenjak)

R.

V. Crlenjak, Chief

Reactor Projects,

Branch

4

Division of Reactor Projects

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

(See

page 3)

Tennessee

Valley Authority

cc w/encls:

Hr.

W.

H. Kennoy, Director

Tennessee

Valley Authority

ET 12A

400 West Summit Hill Drive

Knoxville, TN

37902

R.

H. Eytchison,

Vice President

Nuclear Operations

Tennessee

Valley Authority

3B Lookout Place

1101 Market Street

Chattanooga,

TN

37402-2801

Mr. Pedro

Salas

Site Licensing Manager

Browns Ferry Nuclear Plant

Tennessee

Valley Authority

P. 0.

Box 2000

Decatur,

AL

35602

0. J. Zeringue,

Vice President

Browns Ferry Operations

Tennessee

Valley Authority

P. 0.

Box 2000

Decatur,

AL

35602

B. S. Schofield,

Manager

Nuclear Licensing

and

Regulatory Affairs

Tennessee

Valley Authority

5B Lookout Place

1101 Market Street

Chattanooga,

TN

37402-2801

TVA Representative

Tennessee

Valley Authority

11921 Rockville Pike

Suite

402

Rockville,

HD

20852

General

Counsel

Tennessee

Valley Authority

ET 11H

400 West Summit Hill Drive

Knoxville, TN

37902

Chairman,

Limestone

County

Commission

P. 0.

Box 188

Athens,

AL

35611

C.

E.

Fox, H.D.

State

Department of Public Health

State Office Building

434 Monroe Street

Montgomery,

AL

36130

Hr. Raul

R.

Baron

Site guality Manager

Browns Ferry Nuclear Plant

Tennessee

Valley Authority

P. 0.

Box 2000

Decatur,

AL 35602

bcc w/encls:

(See

page

4)

JUl

29

)g@

Tennessee

Valley Authority

bcc w/encls:

J.

R. Johnson,

RII

G.

C. Lainas,

NRR

F. J.

Hebdon,

NRR

P. J. Kellogg, RII

L. J.

Watson,

RII

T. H. Ross,

NRR

NRC Document Control

Desk

NRC Senior Resident

Inspector

U.S. Nuclear Regulatory

Commission

Route

12,

Box 637

Athens,

AL

35611

RII/O

P

RI I/DRP

RII/DRP

RI I/DRP

CP tte

on

7/~ /93

RII/D P

un

7/ g /93

pC~~

S

l

7/

/93

c

ebli

7/

/93

P

ogg

7/

3