ML18037A375
| ML18037A375 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 04/29/1982 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Eisenburg D Office of Nuclear Reactor Regulation |
| References | |
| TASK-A-36, TASK-OR NUDOCS 8205040529 | |
| Download: ML18037A375 (6) | |
Text
n REGUL RY INFORMATION DISTRIBUT SYSTEM (RIDS)
ACCESSIOP NBR:8205040529 DOC ~ DATE: 82/04/29 NOTARIZED:
NO DOCKET FACIL.:50-220 Nine Mile Point Nuclear Stationi Unitt ii Niagara Powe 05000220 "AUTH,NAME, AUTHOR 'AFFILIATION LEMPGESiT ~ E, Niagara Mohawk Power Corp'ECIP
~ NAME,,
RECIPIENT AFFILIATION EISENBURGPD ~ G ~
Division of Licensing
SUBJECT:
Requests addi time to complete analysis of control of heavy loads due ito outage at facility.Info addressing Section 2;2 8 2.3 of NRC 801222 ltr will be delayed until 820801
'ISTRIBUTION CODE':
A001S,,COPIES
~RECEIVED:.LTR. ENCL,. SIZE:,
TITLE: General Distribution for after Issuance of Operating License NOTES:
RECIPIENT ID CODE/NAME ORB 02 BC 01 INTERNAL ELD NRR/DL D IR NRR/DS I/RAB RGN1 COPIES LTTR ENCL 7
REC IP IENT ID CODE/NAME NRR/DHFS DEPY08 N
ORAB REG F
E 00 COPIES LTiTR ENCL EXTERNAL: ACRS NRC PDR NTIS 09 10 1.
02 1
1 1
LPDR NSIC 03 05 TOTAL NUMBER OF COPIES REQUIRES:
LTTR EB ENCL 2@!>
C W tf) f$ )
fA t
(IF '>>
'4
~ ~>> I 4 F 4
,'H I "
II f WWg 1
Ft ll
+ I Q
I
< t' I
e
,qf
') 0 II Pt
~ it j4 f>> f' rf-(I I
p WI r>>
i ~
F>>
4
~ k'~
t
) 'lt"4 ) 4' if)F, 1<
ll l<I, I
~jl>>
7<
I Ik t
~ 'I 1
I
'IF' t
4 t
I 1
I
>>I I
W ii, 4FI
NIAGARAMOHAWKPOWER CORPORATION/300 ERIE, BOULEVARDWEST, SYRACUSE, N,Y. 13202/TELEPHONE (315) 474-1511 April 29, 1982 g
P~B %bi=@
8 MAY Stgsa~
~
@~~pumm
~ QF~'~~'gg g TQC Mr. D. G. Eisenhut, Director Division of Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555 Re:
Nine Mile Point Unit 1
Docket'No.
50-220 DPR-63
Dear Mr. Eisenhut:
Niagara Mohawk's letter of March 16, 1982 regarding the control of heavy loads indicated that information required in Section 2.2 and Section 2.3 of enclosure 3 to your December 22, 1980 letter would be submitted by May 1, 1982.
Due to the current outage at Nine Mile Point Unit 1 and the associated manpower requirements, additional time will be needed to complete our heavy loads analysis.
Therefore, submittal of information addressing Sections 2.2 and 2.3 of your December 22, 1980 letter will be delayed until August 1, 1982.
Sincere ly, NIAGARA MOHAWK POWER CORPORATION
~c T. E.
Lempges Vice President Nuclear Generation BDW:ja
r y)IhP 0
4
NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 1
DOCKET 50-220 LICENSE DPR-63 RECIRCULATION SAFE END REPLACEMENT May - June
'82 Late '82 First quarter
'83 Begin work, (temporary facilities, safe end prep, initial cutting)
Complete replacement Demobilization and startup 820504052'P 820429 PDR ADOCK 05000220 P
t
. '~J
+1 P
l