Requests Addl Time to Complete Analysis of Control of Heavy Loads Due to Outage at Facility.Info Addressing Sections 2.2 & 2.3 of NRC 801222 Ltr Will Be Delayed Until 820801
ML18037A375
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 04/29/1982
From: Lempges T
NIAGARA MOHAWK POWER CORP.
To: Eisenburg D
Office of Nuclear Reactor Regulation
References
TASK-A-36, TASK-OR NUDOCS 8205040529
Download: ML18037A375 (6)


Text

n REGUL RY INFORMATION DISTRIBUT SYSTEM (RIDS)

ACCESSIOP NBR:8205040529 DOC ~ DATE: 82/04/29 NOTARIZED: NO DOCKET FACIL.:50-220 Nine Mile Point Nuclear Stationi Unitt "AUTH, NAME, AUTHOR 'AFFILIATION ii Niagara Powe 05000220 LEMPGESiT ~ E, Niagara Mohawk Power

~ NAME,, RECIPIENT AFFILIATION Corp'ECIP EISENBURGPD ~ G ~ Division of Licensing

SUBJECT:

Requests addi time to complete analysis of control of heavy loads due ito outage at facility.Info addressing Section 2;2 8 2.3 of NRC 801222 ltr will be delayed until 820801 TITLE: General CODE':

'ISTRIBUTION A001S,,COPIES ~RECEIVED:.LTR. ENCL, Distribution for after Issuance of Operating License

. SIZE:,

NOTES:

RECIPIENT COPIES REC IP IENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTiTR ENCL ORB 02 BC 01 7 INTERNAL ELD NRR/DHFS DEPY08 NRR/DL D IR N ORAB NRR/DS I/RAB REG F E 00 RGN1 EXTERNAL: ACRS 09 10 1. LPDR 03 NRC PDR 02 1 NSIC 05 NTIS 1 1 TOTAL NUMBER OF COPIES REQUIRES: LTTR EB ENCL 2@!>

C t

W tf) f$

)

fA (IF '>>

'4

~

~>> I 4

F 4 'H

, I" II f WWg Ft I ll 1 +I Q I <

t' e

,qf I (I p r>> t

') 0 II Pt ~ it f>>

j4 f' rf- " WI i ~ F>> 4

~ k'~

1< ll

) 'lt"4 ) 4' if)F, l<I, I

~jl>> Ik t

7< I ~ 'I

'IF' 1

t t I 1 4

I I

>>', >>I I

ii, 4FI W

NIAGARA MOHAWK POWER CORPORATION/300 ERIE, BOULEVARD WEST, SYRACUSE, N,Y. 13202/TELEPHONE (315) 474-1511 g P~B %bi=@

April 29, 1982 8 MAY Stgsa~ ~

~

@~~pummQF~'~~'gg TQC g

Mr. D. G. Eisenhut, Director Division of Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555 Re: Nine Mile Point Unit 1 Docket'No. 50-220 DPR-63

Dear Mr. Eisenhut:

Niagara Mohawk's letter of March 16, 1982 regarding the control of heavy loads indicated that information required in Section 2.2 and Section 2.3 of enclosure 3 to your December 22, 1980 letter would be submitted by May 1, 1982. Due to the current outage at Nine Mile Point Unit 1 and the associated manpower requirements, additional time will be needed to complete our heavy loads analysis. Therefore, submittal of information addressing Sections 2.2 and 2.3 of your December 22, 1980 letter will be delayed until August 1, 1982.

Sincere ly, NIAGARA MOHAWK POWER CORPORATION

~c T. E. Lempges Vice President Nuclear Generation BDW:ja

y)IhP r

0 4

NIAGARA MOHAWK POWER CORPORATION NINE MILE POINT UNIT 1 DOCKET 50-220 LICENSE DPR-63 RECIRCULATION SAFE END REPLACEMENT May - June '82 Begin work, (temporary facilities, safe end prep, initial cutting)

Late '82 Complete replacement First quarter '83 Demobilization and startup 820504052'P 820429 PDR ADOCK 05000220 P PDR