ML18037A348

From kanterella
Jump to navigation Jump to search
Advises That Util Response to NRC 801222 Ltr Re Control of Heavy Loads Will Be Delayed Until 810715,due to Large Work Load Associated W/Current Refueling Outage
ML18037A348
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 06/22/1981
From: Dise D
NIAGARA MOHAWK POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
GL-81-07, GL-81-7, NUDOCS 8106290185
Download: ML18037A348 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

AC@.ESSION NBR: 8106290185 C ~ DATE: 81/06/22 NOTARIZ ! NO DOCKET ¹ FACILs50 220 Nine Mile Point Nuclear Station< Unit- iE Niagara Powe" 05000220 AUTH ~ NAME 'UTHOR AFF ILIATION DISEUR D P

~ ~ Ni agar a Mohawk Power Cor p, RECIP ~ NAMEr RECIPIENT AFFILIATION EISENHUT~DBG, Division of Licensing

SUBJECT:

Advises that util response to NRC 801?22 ltr re control of heavy loads will be delayed until 810715rdue to l ar ge'or k.

load associated w/current refueling outage, DISTRIBUTION CODE: A033S, COPIES RECEIVED:LTR 'NCL Q SIZE::

TITLEi Conrtol of Heavy Loads Near Spent Fuel (USI. A 36) 'perating ReactorI NOTES; RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAMEI LTTR ENCLI ID CODE/NAME LTTR> EN ACTION; IPPOLITOE T ~ CLEMENSONrF ~ 04 07 L'NTERNAL:

A/D CORE 8 CS11 I8E'R NRC PDR 02t"'AD BR 12 ASSESS BR10 01 REQUAEG ~ 09 EXTERNAL: ACRS 13 16 1 LPDR 03 NSIC 06 1 0

TOTAL NUMBER'F COPIES REQUIRED: LiTTR 37 ENCL

~, ,0

  • y 1

' v w

p

~ ~

ri r~ V r 'I

'v

) I r tv, rq

'k

%IS v <<% w &gal II r p gwq

.,r) ,vv '4 0 vi" 'g V',r v r ~

l1 '

v k

I e I a l

\I I

NIAGARA MOHAWK POWER CORPORATION/300 ERIE BOULEVARD WEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 June 22, 1981 Mr. Darrell G. Eisenhut, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Re: Nine Mile Point Unit 1 Docket No. 50-220 DPR-63

Dear Mr. Ei senhut:

Your letter of December 22, 1980 regarding control of heavy loads, required a partial response by June 22, 1981. This letter is to inform you that Niagara Mohawk's response will be delayed until July 15, 1981, due to the large work load associated with the current refueling outage.

Very truly yours, NIAGARA MOHAWK POWER CORPORATION

~P.8 P. Disc 'onald Vice President - Engineering GJG: bd

'a