ML18037A336
| ML18037A336 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/01/1981 |
| From: | Dise D NIAGARA MOHAWK POWER CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8106050324 | |
| Download: ML18037A336 (4) | |
Text
PiEGLK ATONY'gtPORNATION DISTRISUTION SYN (RIDE)
ACCESSION NBR:8106050324 DOC ~ DATE: 81/06/01 NOTARIZED:
NO DOCKET FACIL:50 220 Nine Mile Point Nuclear Station> Unit ir Niagara Powe 05
'0-rl10 Nine Mi 1 e Point Nucl ear Station<
Uni t 2r Niagar a
%oh ~65M AUTH ~ NAME, AUTHOR AFFILIATION DISErD ~ PE Niagara Mohawk Power Corp'EC IP RAMIE RECIPIENT AFF ILIATION EISENHUTr DG Division of Licensing
SUBJECT:
Notifies that mods to scram discharge sys will be completed by end of current refueling outage,Mods establish comoli ance w/criteria developed by BisR owners group.
I
- , DISTRISVTION CDDE:
00210 COPIES RECEIVED:LTR 1 ENCL SIZE' TITLE: Corr'espondence for Operating II, Non Operating Facility (e,g.
Nor th 4nn NOTES:
ACTION:
05 RKC IP IENT l3 CODE/NAME IPPOL I TO r T ~
0 rl NORRIS,S.
POLKEP ~
COPIES LTTR ENC 1
1 1
RECIP IKNT IO COOK/NAME L IC BR ¹2 BC Orl LIC BR ¹2 LA LYNCHEOG 05 COPIES LTTR ENCL 1
1 1
INTERNAI: 4/D CORE 8
CS AUX SYS BR 08 CO'IT SYS BR 10 0 IR r HU'lI F AC S12 EFF TR SYS BR13 E'lIRG PRP L IC FE "IA <KP DIV HU'4 FACT ENG 1.6 HYD/GEO BR 17 ICE 07 LIC QUAL BR lECH ENG BR 20
'YIRC PDR 02 OP LIC BR POh'ER SYS BR 21 QA BR 23 RKAC SYS BR 25 SIT ANAL BR 26 4CCIO EVAL BR28 CXENI ERG BR 09 CORK PKRF BR 11 D IR r LICENSING EMRG PRP DKV EQUIP QUAI BR irI GEOSC IKN BR 15 HUM FACT ENG BR ITIC SYS BR 18 LIC QUID BR NATL ENG BR 19 AAIP 4 OKLD OR ASSESS BR PROC/TST REV 22 S
BR20 G FILE 01 NG BR27
=XTERNAI: ACRS NSIC 29 06 16 1
1 LPDR 03
~~'<8 kepi TOTAL NVRBKR OF COPIES REQUIRED:
LTTR 67 ENCL 6
C ks
"7 IAGA A
~ va~~wx NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST. SYRACUSE. N.Y. 13202/TELEPHONE (315) 474-1511 June 1, 1981 Director of Licensing Attention:
Mr. Darrell Eisenhut, Director United States Huclear Regulatory Commission Washington, D. C.
20555
Dear hlr. Eisenhut:
+r ~
/oz
<b /P)
As outlined in our October 27, 1980 letter, modifications to the scram discharge system will be completed by the end of the current refueling outage.
These will establish compliance with the criteria developed by the BWR Owners subgroup.
Exceptions to this are presented in our January 30, 1981 letter.
The staff's Generic Safety Evaluation Report on BWP. Scram Discharge System indicated that these criteria provided an acceptable basis for resolution of problems associated with the scram discharge system.
It is Hiagara Mohawk's understanding that compliance with these criteria eliminates the need for interim actions.
Therefore, the equipment for continuous monitoring of the scram discharge system headers (i.e.,
UT equipment) will not be reinstalled.
Sincerely, NIAGARA MOHAWK POWER CORPORATIOH BDW:ja D. P. Disc Vice President Engineering
,/o 8106050/2 t
. 0