ML18037A272
| ML18037A272 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 06/23/1980 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Brunner E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| NMP-2383, NUDOCS 8006300265 | |
| Download: ML18037A272 (4) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8006300?65 DOC ~ DATE; 80/06/23 NOTARIZED:
NO DOCKET 0
FACIL:50 220 Nine Mile Point Nuclear Stationi Unit li Niagara Powe 05000220 AUTH BYNAME AUTHOR AFFILIATION MPGESET,ED Niagara Mohawk Power Corp,
,EC IP, NAME RECIPIENT AFFILIATION BRUNNEREE ~ J ~
Region 1E PhiladelphiaE Reactor operations Nuclear suppo
SUBJECT:
Responds to items of noncompliance noted in IE Insp Rept 50 220/80 04 'orrective actions:Instruction Procedure 01-18 has been written.APN 2 will be revised to describe current maint organization.
DISTRIBUTION CODE:
ASSIS COPIES RECEIVED:LTRi ENCL
+ SIZE:
TITLE: General Distribution for after Issuance of Operiting Lic N
ES I 0 ~
O T E 8 ~
w w
eeet ey w
~ea m~ ~~
eseeeaew ACTION'NTERNAL:
E.
RNAL:
RECIPIENT ID CODE/NAME BC ZNOCLroi7 05 A/D CORE 5
CS21 CHEM ENG BR 17 HANAUERES ~
20 MOOREiV ~
22 OELD 14 QA BR 15 ACRS 20 NSIC 00 COPIES LTTR ENCL 16 1
1 RECIPIENT ID CODE/NAME A/D REACT SY 818 EMERG PREP 16 IEE 12 NRC PDR 02 OR ASSESS BR 19 01 LPDR COPIES LTTR ENCL Jt>L 1 )3M 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 38 ENCL
I 4
II II I
e 0
r>>
I C
~ rI C
I >>
II 4
I I
Ni 0
V NIAGARA U MOHAWK Mh(P-238 3 NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 June 23, 1980 h4..
ELdon J.
RrunnerL, Chic(
Reactor Operations and Nuclem SuppoM Rcanch 0~ed S~es Nuclean. Regulatory Comrsisak on-Region I 631 Parch Avenue Wng o) PIusw~,
Pennsylvania 19406 RE:
Dock& No. 50-220 Inspmti.on 80-04 8~ A.. BrcunnetL:
Inspe~n 50-220/80-04, conducted by you@, o~aru'.zation, ~de~(~ed problems with Che )ailurLe to documeI< SMe Options Review Committee Reviews tSORC j.
As mentioned ~n Che ~pe~n <epos,
.Che gems
<de~(~ed as nok be01g documented by SORC minLtes werLe moak Likely discussed by SORC.
As a result otI She )ailurae Co document these ~-
- cusskoru, M~ne hKLe Point OtIpce Ins~~n Pcocedurce No. OI-18 has been un~en.
Tl~ pmcedme pnov~des apecL Pc ~ruWu~ons (oa no<
only Che IIo~ o( SORC meeting minutes bLLt also Che contexts and degree o( d~ Che Iru.nates should have.
SORC me~ng rrIinutes uuXL be pcepmed ~n accordance ~h Eh'ocument, which ~ based on Che aeq~emeets o$ Technical Specf +cation 6.5.1.8 and Che commitmerLts o( APN-3 and APM-17.
This new pmcedLrLe should avoid (urLtheIL gems o( non-compLiance.
The pmcedLLILe ~ presently available (oa yom cev<elv..
The. ~nspe~on aepoM also pointed oLt Chat Che descru'pWon o( Che re'.rLtenance oagaru.zationL n APM-2 does nok d~ Che cLvLILent mu.n-Cenance orcgam.zation at Che a~on.
APN-2 IIIL be, aevmed and JLe-v~eved by SORC by July 31,,1980, Xo descru.be Che cunrcent rreirLtenance o~am.zatc,on.
Ale pmpose Chat Che ceded pnacedurLe uIQL close oLt unrcesolved a~n Ikem 50-220/04-02.
- Mncmely, original signed by Thomas E.
Lempges jL/
Thomas E.
Lempges V~ce Paes~de&
NuclearL Genera
&on
+o>
5 I
u'D ooooooo gg~
J