Monthly Operating Rept for Nov 1979
ML18037A232
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/10/1979
From: Perkins T
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17053B285 List:
References
NUDOCS 7912260268
Download: ML18037A232 (8)


Text

P OPERATING DATA REPORT DOCKET NO. ~ZQ December 10~ 1979 COiiIPLETED BY TELEPHONE Ex. 1312 OPERATING STATUS I Unit Nance Nine Nile Point Unit //1 Notes

3. Licensed Thermal Power (IIWt):
4. Namephte Rating (Gross illlVe):
5. Design Electrical Rating (Net i~I'lUe):
6. ~Iaximunt Dependable Capacity (Gross illlVe):
7. Mazimunt Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, lfAny (Net i%I')Ve):
10. Reasons For Restrictions, If Any:

This Month Yr.-to.Data Cumuhtive r

Il. Hours ln Reporting Period 720 8 '01

12. Number Of Hours Reactor Was Critical 720 5136.0
13. Reactor Reserve Shutdown Hours 0 0 1 204. 1
14. Hours Generator On. Line 20 5,042. 8 62065.6
15. Unit Reserve Shutdown Hours 0
16. Gross Thermal Energy Generated (MWH) 1 306 622
17. Gross Electrical Energy Generated (ilIWH) 441 767 2 644 453
18. Net Electrical Energy Generated (MWH) 428 089, 2 558 936 32 03 3 2
19. Unit Service Factor 100 62. 9 70. 2
20. Unit Availability Factor 100 62. 9 70. 3
21. Un! t Capacity Factor (Using i%(DC Net) 97. 5 52.3 59.4
22. I:nit Capacity Factor (Using DER Net) 92. 2 51.5 8.4
23. Unit Forced Outage Rate 0 1.2 9.4
24. Shutdowns Scheduled Over Next 6 Months I Type. Date, a<<d Duration of Each):
25. IfSliut Down At End Of Report Period, Estimated Date of Startup:

'6. Units In Test Status (Prior to Conimercial Operation): Forecast Acltlcvcd INITIALCRITICALITY INITIAL ELECTRICITY COADI ERCIA L OPERATION C

I (n 7

)

2

0 g

~

1'-

'I

AVERAG<E DAILYL'4!T )'Oll'ER LE%'EL DOCKETiiO. '

WIT 9 Ilil~t Unit Nl December 10, 1979 DATE co)tPLETQD ny T. J. Perkins TELEPI I ONE 315-343-2110 ~

Ex. 1312 November

<IIONTH DAY AVERAGE DAILYPOI'l'ER LEVEL DAY AVERAGE DAILYPO('iER LEVEL

(%(4'C.Net ) QINc..'iet)

I 589 589 IS 588 600 3

591 598 20 590 601 Zl 591 599 589 596 23 590 ~

589 .

597 596 10 597 599 597 597 II 595 597 12 2S I'3 599 597 597 597 30 596 IS 3l 16 596 I NSTR VCTIO.'kS On this fort>>at. list the uvcraec dail>'nit p<>avr lcicl in Mh~c-Yct for cuch d~y in thc rcp<>>trrry <<l.>>ith. (:iir>>p<<tc to thc ncDlcst lvilolc mcte3lvltt.

s

0 DOCKET NO 50-220 UNIT SHUTDOWNS AND POWER REDUCTIONS 9 Mile Pt. Unit II1 DATE eoera er 979 COMPLETED IIY T.J. Perkins REPORT MONTH No>ember Ex. 1312 Liccnscc (=")~ Cause k. Corrective

(() O o l)atc Event a~> Action to Report = to Prevent Recurrence 11/17/79 S 10 Control Rod Manipulations 11/23/79 10 H Control Rod Manipulations 3

F: Forced Reason: h(cthod: Exhibit G - Instructions S: Scheduled A-I'.(Iuipment Failure (Explain) I -Manual for Preparation of Data B-hlaitttenancc or Test 2-Manual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Sera))). Event Report (LEIO File (NUREG-l).Rcgulat()ry Rcstricttott 4-Other (Explain) OI6I)

I'. Operator Training (('iccnsc Examination F-Admittist tativc 5 G-Opcraliollal Error (Explailt) Exhibit I - Sante Source (I/77) I I.Other (Lrxplain)

NIAGARA MOHAWI< POWER CORPORATION NINE MILE POINT NUCLEAR STATION UNIT /fl NARRATIVE OF OPERATING EXPERIENCE NOVEMBER 1979 The station operated with a monthly availability factor of 100%, and a net design electrical capacity factor of 97.5%. During the entire month 815 Reactor Recirculation Pump was out of service and isolated due to mechanical problems. Capacity factor loss was attributed to required control rod adjustments and recirculation flow limitations.

MAINTENANCE ON CLASS IE UIPMENT November 26 811 Control Rod Drive Replaced shims and gasket on outboard bearing November 26 //11 Inst. Air Compressor Replaced Casing cover gasket November 29 Control Rod Drive Flow Replaced valve stem, Control Valve ball and flange gaskets Completed piping system restraint work per I.E. Bulletin 79-02. As built drawings being compiled by engineering department.

No other station modifications were completed during the month.