ML18037A118

From kanterella
Jump to navigation Jump to search
Amend 17 to OL Application,Consisting of Amend 17 to FSAR (Filed in PDR Category K) & Suppl 8 to Environ Rept - OL Stage (Filed in PDR Category C)
ML18037A118
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/08/1985
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML18037A120 List:
References
(NMP2L-0334), (NMP2L-334), NUDOCS 8502130184
Download: ML18037A118 (54)


Text

M V IM)wSA,IRA

'" (Q g QCoOIg+Q'g NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST, SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 February 8, 1985 (NMP2L 0334)

Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Eisenhut:

Re:

Amendment 17 to Application to Operating License Nine Mile Point Unit 2 Docket No. 50-410 In accordance with 10CFR50.30 (c)( 1),

10CFR51.24 and your March 29, 1983

letter, enclosed are three originals and 60 copies of Amendment 17 to the Final Safety Analysis Report and 41 copies of Supplement 8 to the Environmental Report.

These changes incorporate certain responses into the text of the Final Safety Analysis Report or Environmental

Report, as appropriate.

Also included are changes which have resulted from our continuing review of these documents.

As you are

aware, the New 'York Power Authority (NYPA) was previously known as the Power Authority of the State of New'ork (PASNY).

Since this is a

change of name only and has no other effects, we have not revised the references to PASNY in either our Final Safety Analysis Report or Environmental Report.

Starting with this amendment and supplement,

however, we wi 11 incorporate this name change in those portions being revised for other reasons.

Very truly yours, 8502f30184 850208 PDR ADOCK 05000410 A

PDR JM:ja Enclosure xc: Project File (2)

C.

V. Mangan Vice President Nuclear Engineering 8 Licensing

,gs

a 0~

~

4

,p IP

~)!I', < "ill,*~"<k q '

l'l n

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

Niagara Mohawk Power Corporation

)

)

(Nine Mile Point Unit 2)

)

Docket No. 50-410 AFFIDAVIT C. V. Man an

, being duly sworn, states that he is Vice President o

N>agara o

aw ower orporation; that he is authorized on the part of said Corporation to sign and file with the Nuclear Regulatory Commission the documents attached hereto; and that all such documents are true'nd correct to the best of his knowledge, information and belief.

Subscribed and swo

, to b fore me, a Notary Public i an for the State of New York and County of

, this~ day of

, 1985.

tary Pub ic in and for

County, New York My Commission expires:

JANIS M. MACRO Notary Public ln tho State of New York Quail!led ln Onondaga County No. 47845 5

~P k

a

~

p 4

s I

C h

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS The following instructions are for the insertion of the current amendment into the Nine Mile Point Unit 2 FSAR.

Remove

pages, tables, and/or figures listed in the REMOVE column and re-place them with the
pages, tables, and/or figures listed in the
INSERT, column.

Dashes

(---) in either column indicate no action required.

Vertical bars have been placed in the margins of inserted pages and ta-bles to indicate revision locations.

Amendment 17 C2/1217718/65/2R FII-1 January 1985

+e

NINE MILE POINT NUCLEAR STATION UNIT 2 NIAGARA MOHAWK POWER CORPORATION FSAR AMENDMENT RECEIPT ACKNOWLEDGEMENT I acknowledge receipt of:

Amendment 17 My copy has been

updated, and superseded pages have been removed and destroyed.

Set Reassi nment and/or Set Holder Chan e of Address (if necessary)

Please reassign this manual to, and/or change my address as follows:

Please furnish all requested information and return to:

A. L. Monahan Stone 6 Webster Engineering Corporation 3 Executive Campus P.O.

Box 5200 Cherry Hill, NJ 08034 Name of set holder Set No.

Company Signature Date C2/1217718/53/2RH

r

1

'Q Nine Mile Point Unit 2 FSAR I.C.2 SHIFT AND REJ IEF TURNOVER PROCEDURES FSAR Cross Reference Section 13.5.1 NUREG-0737 Position The licensees shall review and revise as necessary the plant procedure for shift and relief turnover to assure the following:

A checklist shall be provided for the oncoming and offgoing Control Room Operators and 'he oncoming Shift Supervisor to complete and sign.

The following items, as a minimum, shall be included in the checklist:

a.

Assurance that critical plant parameters are within allowable limits (parameters and allowable limits shall be listed on the checklist).

b.

Assurance of the availability and proper alignment of all systems essential, to the prevention and mitigation of operational transients and accidents by a

check of the control console (what to check and criteria for acceptable status shall be included in the checklist).

C.

Identification of systems and components that are in a degraded mode of operation permitted by the Technical Specifications.

For such systems and components, the length of time in the degraded mode shall be compared with the Technical Specifications action statement (this shall be recorded as a separate entry on the checklist).

2

~

Checklists or logs shall be provided for completion by the offgoing and ongoing auxiliary operators and technicians.

Such checklists or logs shall include any equipment under maintenance or test that by itself could degrade a

system critical to the prevention and mitigation of operational transients and accidents or initiate an operational transient (what to check and criteria for acceptable status shall be included on the checklist).

1.10-25

Nine Mile Point Unit 2 FSAR 3.

A system shall be established to evaluate the effectiveness of the shift and relief turnover procedure.

Nine Mile Point Unit 2 Position The Unit 2 shift relief turnover procedures will include:

A checklist for incoming and outgoing control room operators and incoming Shift Supervisor to complete and sign.

The following items, as a minimum, shall be included in the checklist:

a.

Assurance that critical plant parameters are within allowable limits.

(Parameters and allowable limits shall be listed on the checklist.

)

b.

Assurance of the availability and proper alignment of all systems essential to the prevention and mitigation of operational transients and accidents by a

check of the control console.

(What to check and criteria for acceptable status shall be included in the checklist.)

c.

Identification of systems and components that are in an off-normal or out-of-service mode of operation permitted by the technical specifications.

For such systems and components, the length of time in the off-normal and out-of-service mode shall be compared with the technical specifications action statement, if any.

(This shall be recorded as a

separate entry on the checklist.

)

2.

Checklists or logs shall be provided for completion by outgoing and incoming operators.

Such checklists or logs shall include any equipment under maintenance or test that by itself could degrade a

system critical to the prevention and mitigation of operational transients and accidents or initiate an operational transient.

(What to check and criteria for acceptable status shall be included on the checklist. )

3.

A system shall effectiveness of procedure.

be established to evaluate the the shift and relief turnover Amendment 14 1.10-26 October 1984

4 Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 1 Remove T 1.3-3 (2 of 3)

Insert T 1.3-3 (2 of 3)

Amendment 17 C2/1217718/65/2R FII-2 January 1985

1

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 2 Remove T 1.8-1 (89 and 89a of 169)

T 1.8-1 (148 of 169)

T 1.8-1 (155 of 169)

T 1.8-2 (7 of 14) 1.10-5/6 1.10-9/9a 1.10-9b/10 1.10-19/19a 1.10-25/26 1.10-33/33a 1.10-73jb/k Insert T 1.8-1 (89 and 89a of 169)

T 1.8-1 (148 of 169)

T 1.8-1 (155 and 155a of 169)

T 1.8-2 (7 of 14) 1.10"5/6 1.10-9/9a 1.10-9b/10 1.10-19/19a 1.10-25/26 1.10-33/33a 1.10-73jb/k Amendment 17 C2/1217718/65/2R FII-3 January 1985

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOIUME 3 Remove 2.3-7/8 2.3-8a/8b 2.3-61/62 2.5-194a/194b T 2.5-46B T 2.5-46C T 2.5-48C T 2.5-49 Insert 2.3"7/8 2.3-8a/8b 2.3-61/62 2.5-194a/194b T 2.5-46B T 2.5-46C T 2.5-48C T 2.5-49 Amendment 17 C2/1217718/65/2R FII-4 January 1985

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 8 Remove 3-xv/xvi Insert 3-xv/xvi Amendment 17 C2/1217718/65/2R January 1985

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 10 Remove 3.8-73/73a Insert 3.8-73/73a Amendment 17 C2/1217718/65/2R January 1985

0

/p

Nine Mile Point Unit 2 FSAR'NSERTION INSTRUCTIONS VOLUME ll Remove 3.9A-2a/2b T 3.9B-2o Insert 3.9A-2a/2b T 3.9B-2o Amendment 17 C2/1217718/65/2R January 1985

0

Nine Mile Point. Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 12 Remove 4.4-9b/9c 4.4-9d/10 Insert 4.4-9b/9c 4.4-9d/10 Amendment 17 C2/1217718/65/2R FII-8 January 1985

P

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 13 Remove Insert T 5.2-1 (6b of 8) 6-xiii/xiv T 5.2-1 (6b of 8)

T 5.2-1 (8a of 8) 6-xiii/xiv 6-xiva/xivb Amendment 17 C2/1217718/65/2R FII-9 January 1985

/

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 14 Remove 6.2-23/24 6.2-24a/24b 6.2-59/60 6.2-60a/60b 6.2-65/66 6.2-85/86 6.2-87/88 T 6.2"3 (2 of 2)

T 6.2-52 T 6.2-56 (1 through 8 of 24b)

T 6.2-56 (10 through 16 of 24b)

T 6.2-56 (18 through 24b)

T 6.2-60 F 6.2-70 (4 of 43)

F 6.2-70 (5 of 43)

F 6.2-70 (8 of 43)

F 6.2-70 (12 of 43)

F 6.2-70 (15 of 43)

F 6.2-70 (36 of 43)

Insert 6.2<<23/24 6.2-24a/24b 6.2-24c/24d 6.2-59/60 6.2-60a/60b 6.2-65/65a 6.2-65b/66 6.2-85/85a 6.2"85b/86 6.2-86a/86b 6.2-87/87a 6.2-87b/88 T 6.2-3 (2 of 2)

T 6.2-52 T 6.2-56 (1 through 8 of 24b)

T 6.2-56 (10 through 16 of 24b)

T 6.2-56 (18, 19,

19a, 20, 21, 22, 23, 24, 24a, and 24b of 24)

T 6.2-60 F 6.2-28B F 6.2-28C F 6.2"70 (4 of 43)

F 6.2-70 (5 of 43)

F 6.2-70 (8 of 43)

F 6 '-70 (12 of 43)

F 6.2-70 (15 of 43)

F 6.2-70 (36 of 43)

Amendment 17 C2/1217718/65/2R FII-10 January 1985

I'~

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 16 Remove 8.2-24c/24d Insert 8.2-24c/24d Amendment 17 C2/1217718/65/2R FII-ll January 1985

r.

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 17 Remove 9-ix/x Insert 9-ix/x Amendment 17 C2/1217718/65/2R FII-12 January 1985

(

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 21 Remove Insert 9.5-21/22 9.5-22a/22b 9.5-23/23a 9.5-23b/24 9.5-25/25a 9.5-25b/26 9.5-39/40 9.5-40a/40b 9.5-41b/42 9/5-42a/42b 9.5-21/22 9.5-22a/22b 9.5-22c/22d 9.5-22e/22'.5-23/23a 9.5-23b/24 9.5-25/25a 9 '-25b/26 9.5-39/40 9.5-40a/40b 9.5-4lb/42 9.5-42a/42b Amendment 17 C2/1217718/65/2R FII-13 January 1985

r.

S

Nine Mile Point. Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 23 Remove 9A-iii/iv 9A.3-57/57a Insert 9A-iii/iv 9A.3-57/57a Amendment 17 C2/1217718/65/2R FII-14 January 1985

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 26 Remove 12.4-1/la T 13.1-3 (2 of 7) 13A-14a/14b 13A-129/130 T 14.2-43 (1 of 2/2 of 2)

T 14.2-43A (1 of 2/2 of 2)

T 14.2-57 (1 of 2/2 of 2)

T 14.2-72 (1 of 2/2 of 2)

T 14.2-77 (1 of 2/2 of 2)

T 14.2-87 (1 of 2/2 of 2)

T 14.2-101 (1 of 2/2 of 2)

T 14.2-110 (1 of 2/2 of 2)

T 14.2-111 (1 of 2/2 of 2)

Insert 12.4-1/la T 13.1-3 (2 of c7) 13A-14a/14b 13A"14c/14d 13A-14e/14f 13A-14g/14h 13A-14i/14j

~

13A-14k/141 13A-14m/14n 13A-14o/14p 13A-14'/14r 13A-14s/14t 13A-14u/14v 13A-68c/68d 13A-72a/72b 13A-72c/72d 13A-72e/72f 13A-72g/72h 13A-72i/72j 13A-72k/721 13A-72m/72n 13A-72o/72p 13A-129/129a 13A-129b/129c 13A-129d/129e 13A-129f/129g 13A-129h/129i 13A"129j/129k 13A-1291/130 T 14.2-43 (1 of 2/2 of 2)

T 14.2-43A (1 of 3/2 of 3)

T 14.2-43A (3 of 3/-)

T 14.2-57 (1 of 2/2 of 2)

T 14.2-72 (1 of 2/2 of 2)

T 14.2-77 (1 of 2/2 of 2)

T 14.2-87 (1 of 2/2 of 2)

T 14.2-101 (1 of 2/2 of 2)

T 14.2-110 (1 of 2/2 of 2)

T 14.2-111 (1 of 2/2 of 2)

Amendment 17 C2/1217718/65/2R FII-15 January 1985

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS VOLUME 27 Remove T 14.2-124 (1 of 2/2 of 2)

T 14.2"125 (1 of 3/2 of 3)

T 14.2-130 (1 of 2/2 of 2)

T 14.2-225 (1 of 3/2 of 3)

T 14.2-225 (3 of 3/-)

Insert T 14.2-124 (1 of 2/2 of, 2)

T 14.2-125 (1 of 3/2 of 3)

T 14.2-130 (1 of 2/2 of 2)

T 14.2-225 (1 of 3/2 of 3)

T 14.2-225 (3 of 3/-)

Amendment 17 C2/1217718/65/2R FII-16 January 1985

r

Nine Mile Point Unit 2 FSAR Remove 6A-ix/x F 6A.l-l.

T 6A.4-1 T 6A.4-10 T 6A.4-10 T 6A.4"14 T 6A.4-14 T 6A.4-15 T 6A.4-15 T 6A.4-16 F 6A.4-13 F 6A.4-39 (1 of 2)

(2 of 2)

(1 of 2)

(2 of 2)

(1 of 2)

(2 of 2)

INSERTION INSTRUCTIONS APPENDIX 6A (DAR)

Insert 6A-ix/ixa 6A-ixb/x F 6A.l-l T 6A.4"1 (1 of 2)

T 6A.4-1 (2 of 2)

T 6A.4-10 (1 of 3)

T 6A.4-10 (2 of 3)

T 6A.4-10 (3 of 3)

T 6A.4-14 T 6A.4-15 (1 of 2)

T 6A.4-15 (2 of 2)

T 6A.4-16 F 6A.4-13 F 6A.4-39 Amendment 17 C2/1217718/65/2R FII-17 January 1985

Nine Mile Point Unit 2 FSAR Remove T 9B.8-2 (29c of 38)

INSERTION INSTRUCTIONS APPENDIX 9B (SSA)

Insert T 9B.8-2 (29c of 38)

Amendment 17 C2/1217718/65/2R January 1985

tg

Nine Mile Point Unit 2 FSAR INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 1 Remove Insert FQR-i through FQR-xix Q&R F210.62-3/-

T 210.62-1 (1 of 2)

Q&R F240.10-1/2 Q&R F240.17-1/-

Q&R F251.5"1/"

FQR-i through FQR-xx Q&R F210.62-3/-

T 210.62-1 (1 of 2)

Q&R F240.10-1/2 T 240.10-1 (1 and 2 of"2)

Q&R F240.17-1/-

Q&R F251.5-1/2 Q&R F251.5-3/-

Amendment 17 C2/1217718/65/2R FII-19 January 1985

~ g

Nine Hile Point Unit 2 FSAR INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUHE 2 Remove FQR-i through FQR-xix Q&R F271.1-1/-

QM F271.2-1/-

Q&R F271.10-1/2 Insert FQR-i through FQR-xx Q&R F271.1-1/-

Q&R F271.2-1/-

Q&R F271.10-1/2 Q&R F421.15-1/-

T 421.15-1 (1 of 2)

Q&R F421.27-3/4 Q&R F421.27-9/10 T 421.36-1 (1 of 18)

T 421.36-1 (18 of 18)

QM F421.37-1/2 T 421.47-1 (1,

2) 5, 12) 13, and 17 of 17)

Q&R F430.10-1/-

T 430.16-1 (1 and 2 of 2)

Q&R F430.23-3/4 QM F430.55-1/-

Q&R F430.74-1/-

Q&R F430.80-1/2 Q&R F430.86-1/-

Q&R 421.15-1/-

T 421.15-1 (1 of 2)

Q&R F421.27-3/4 Q&R F421.27-9/10 T 421.36-1 (1 of 18)

T 421.36-1 (18 of 18)

T 421.36-1 (18a of 18)

T 421.36-1 (18b of 18)

QM F42'1.37-1/2 T 421 47 1(l)25)12'3 and 17 of 17)

Q&R F430.10-1/-

T 430.16-1 (1 and 2 of 2)

Q&R F430.23-3/4 Q&R F430.55-1/-

Q&R F430.74-1/2 Q&R F430.80-1/2 QM F430.86-1/-

Amendment 17 C2/1217718/65/2R FII-20 January 1985

~ ~

0

Nine Mile Point Unit 2 FSAR Remove Q&R F640.08-1/2 Q&R F640.10"1/-

Q&R F640.13-1/"

Q&R F640.34-3/4 Attach 640.34-1 (1 of 3)

Attach 640.34-1 (2 of 3)

GI-1/2 GI-3/4 GI-5/6 GI-9/10 GI-19/20 T GI-1 INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 3 Insert F 620.01-37 F 620.01-38 F 620.01-39 F 620.01-40 F 620.01-41 F 620.01-42 Q&R F620.02-1/-

Exhibit 620.02-1 (1 and 2 of 2)

Q&R F620.03-1/2 Exhibit 620.03-1 (1 through 8 of 8)

Q&R F620.04-1/-

Q&R F620.05-1/-

Q&R F640.01-1/-

Exhibit 640.01-1 (1 through 4 of 4)

Exhibit 640.01-2 Exhibit 640.01-3 Exhibit 640.01-4 Q&R F640.08-1/2 Q&R F640.10-1/2'&RF640.13-1/-

Q&R F640.34-3/4 Attach 640.34-1 (1 of 3)

Attach 640.34-1 (2 of 3)

Attach 640.34-1 (2a of 3)

Attach 640.34-1 (2b of 3)

GI-1/2 GI-3/4 GI-5/6 GI-9/10 GI-19/20 T GI-1 Tab - Heavy Loads Title page i/ii iii/-

1-1/-

2-1/-

3-1/2 3-3/4 3-5/6 3-7/8 Amendment 17 C2/1217718/65/2R FII-22 January 1985

"E

Nine Mile Point Unit 2 FSAR Remove 3-9/10 3-11/12 Table 3-1 Table 3-2 Table 3-2 Table 3-2 Table 3-2 Table 3"3 Table 3-4 Table 3-5 4-1/-

Table 4-1 5-1/-

F 5-1 F 5-2 F 5-3 F 5-4 (1

6-1/-

7-1/"

8-1/2 8-3/4 8-5/-

9-1/"

10"1/2 10-3/4 (1 of 4)

(2 of 4)

(3 of 4)

(4 of 4)

(1 -through 3 of 3)

(1 through 10 of 10) and 2 of 2)

INSERTION INSTRUCTIONS QUESTIONS AND RESPONSES VOLUME 3 Insert Amendment 17 C2/1217718/65/2R FII-23 January 1985

/

I t

Nine Mile Point Unit 2 FSAR Remove INSERTION INSTRUCTIONS LIST OF EFFECTIVE PAGES Insert EP l-l through EP 1-7 EP 2-1 through EP 2-19 EP 3-1 through EP 3-13 EP 4-1 through EP 4-2 EP 5-1 through EP 5-3 EP 6-1 through EP 6-6" EP 8-1 through EP 8-3 EP 9-1 through EP 9-9 EP 12-1 through EP 12-3 EP 13-1 through EP 13-3 EP 14-1 through EP 14-5 EQD"1 DAR-1 through DAR-4 SSA-1 through SSA-2 QM-1 through QR-ll EP l-l through EP 1-7 EP 2-1 through EP 2-19 EP 3-1 through EP 3-13 EP 4-1 through EP 4-2 EP 5-1 through EP 5-3 EP 6-1 through EP 6-6 EP 8-1 through EP 8-3 EP 9-1 through EP 9-9 EP 12-1 through EP 12-3 EP 13-1 through EP 13-4 EP 14-1 through EP 14-5 EQD-1 EQD-2 DAR-1 through DAR-4 SSA-1 through SSA-2 QSR-1 through QSR-13 Amendment 17 C2/1217718/65/2R F1I-24 January 1985

0