Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9308050030
DOC.DATE: 93/07/13
NOTARIZED: NO
k
FACIL:50-259 Browns Ferry Nuclear
Power Station, Unit 1, Tennessee
50-260
Browns Ferry Nuclear
Power Station, Unit 2, Tennessee
50-296
Browns Ferry Nuclear
Power Station, Unit 3, Tennessee
AUTH.NAME
AUTHOR AFFILIATION
CRLENJAK,R.V.
Region
2 (Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
MEDFORD,M.O.
Valley Authority
DOCKET ¹
05000259
05000260
05000296
SUBJECT:
Forwards
insp repts
50-259/93-23,50-260/93-23
& 50-296/93-23
on 930515-0618
& notices of violation
& deviation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
S
I
F
RECIPIENT"
ID CODE/NAME
PD2-4-PD
WILLIAMS,J.
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
t
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OGC/HDS3
RES/HFB
EXTERNAL: EG&G/BRYCEgJ.H.
COPIES
LTTR ENCL
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
ROSS,T.
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
OE DIR
MMMKI
02
RGN2
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
'1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOh1 P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
i
Docket Nos.
50-259,
50-260,
and 50-296
License
Nos.
and
Valley Authority
ATTN:
Dr. Mark 0." Medford
Vice President,
Technical
Support
3B Lookout Place
1101 Market Street
Chattanooga,
TN
37402-2801
Gentlemen:
SUBJECT:
NOTICE OF VIOLATION AND DEVIATION
(NRC
INSPECTION
REPORT
NOS. 50-259/93-23,
50-260/93-23,
AND
50-296/93-23)
This refers to the inspection
conducted
by C. A. Patterson
of this office on
May 15,
1993 - June
18,
1993.
The inspection
included
a review of activities
authorized for your Browns Ferry facility.
At the conclusion of the inspec-
tion, the findings were discussed
with those
members of your staff identified
in the enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation-of
activities in progress.
Based
on the results of this inspection, certain'of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation concerning failure to follow procedure
fo'r a safety
system valve
lineup checklist.
We are concerned
about the violation because
of the
potential for misalignment of system
components for a system in standby
readiness.
Certain activities appear to deviate
from commitments to the
NRC.
The
deviation
and elements
to be included in your response
'are described
in the
enclosed
Notice of Deviation.
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should document'he
specific actions taken
and any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory 'requirements.
In accordance
with 10
CFR 2.790 of the
NRC's "Rules of Practice",
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
9308050030
930713
ADOCK 05000259
8
Valley Authority
The responses
d>rected
by this letter and its enclosures
are not subject to-
the clearance
procedures
of the Office of Management
and Budget
as required
by
the Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
(Original signed by R; Crlenjak)
R.
V, Crlenjak; Chief
Reactor Projects,
Branch
4
Division of Reactor
Projects
Enclosures:
1.
2.
Notice of Deviation
3.
NRC Inspection
Report
cc w/encls:
(See
page
3)
0
Valley Authority
cc w/encls:
Hr.
W.
H. Kennoy, Director
Valley Authority
ET 12A
400 West Summit Hill Drive
Knoxville, TN
37902
R.
H. Eytchison,
Vice President
Nuclear Operations
Valley Authority
3B Lookout Place
1101 Market Street
Chattanooga,
TN
37402-2801
Hr. Pedro
Salas
Site Licensing
Manager.
Browns Ferry Nuclear Plant
Valley Authority
P. 0.
Box 2000
Decatur,
35602
0. J. Zeringue,
Vice President
Browns Ferry Operations
Valley Authority-
P. '0.
Box 2000
Decatur,
35602
B. S. Schofield,
Manager
Nuclear Licensing
and
Regulatory Affairs
Valley Authority
5B Lookout Place
1101 Market Street
Chattanooga,
TN
37402-2801
TVA Representative
Valley Authority
11921 Rockville Pike
Suite
402
Rockville,
HD
20852
General
Counsel
Valley Authority
ET llH
400 West Summit Hill Drive
Knoxville, TN
37902
Chairman,
Limestone
County
Commission
P. 0.
Box 188
Athens, AL'5611
C.
E.
Fox, H.D.
State
Department of Public Health
State Office Building
434 Monroe Street
Montgomery,
36130
Hr. Raul
R. Baron
Site guality Manager
Browns Ferry Nuclear Plant
Valley Authority
P. 0.
Box 2000
Decatur,
AL 35602
bcc w/encls:
(See
page
4)
UL l 3 /gag
bcc w/encls:
J.
R. Johnson,
RII
G.
C. Lainas,
F. J.
Hebdon,
P. J. Kellogg, RII
L. J.
Watson,
RII
T. H. Ross,
NRC Document Control
Desk
NRC Senior Resident
Inspector
U.S. Nuclear Regulatory
Commission
Route
12,
Box 637
Athens,
35611
RII/O
P
GS
n
i
RII/ RP
J
RII/
P
T
7
/93
RII
P
R
/Q
93
~geo%
RII/
P
gg
/y/93
RII/O P
C
t
son
7
/9
r