Proposed TS Bases 4.2 Re Functional Testing Frequencies for Channel Functional Test & High Voltage Power Supply Functional Test,Based on PRA & Sys Drift Characteristics of Reactor Bldg Ventilation Radiation Monitors
ML18036B234
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/06/1993
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18036B233 List:
References
NUDOCS 9304150066
Download: ML18036B234 (8)


Text

ENCLOSURE TVA BFN TS-316 RESPONSE TO NRC REQUEST FOR ADDZTZONAL ZNFORMATZON BASES 4.2 UNZTS 1g 2g AND 3 9304i50066 930406 PDR ADOCK 05000259 P PDR

'I t

4.2 g~ (Cont'd The conclusions to be drawn are these:

1. A 1-out-of-n system may be treated the same as a single channel in terms of choosing a test interval; and
2. more than one channel should not be bypassed for testing at any one time.

The radiation monitors in the reactor and refueling zones which initiate building isolation and standby gas treatment operation are arranged such that two sensors high (above the high level setpoint) in a single channel or one sensor downscale (below low level setpoint) or inoperable in two channels in the same zone will initiate a trip function. The functional testing frequencies for both the channel functional test and the high voltage power supply functional test are based on a Probabilistic Risk Assessment and system drift characteristics of the Reactor Building Ventilation Radiation Monitors. The calibration frequency is based upon the drift characteristics of the radiation monitors.

The off-gas post treatment monitors are connected in a 2-out-of-2 logic arrangement. Based on experience with instruments of similar design, a testing interval of once every three months has been found adequate.

The automatic pressure relief instrumentation can be considered to be a 1-out-of-2 logic system and the discussion above applies also.

The criteria for ensuring the reliability and accuracy of the radioactive gaseous effluent instrumentation is listed in Table 4.2.K.

The criteria for ensuring the reliability and accuracy of the radioactive liquid effluent instrumentation is listed in Table 4.2.D.

The RCIC and HPCI system logic tests required by Table 4.2.B contain provisions to demonstrate that these systems will automatically restart on a RPV low water level signal received subsequent to a RPV high water level trip.

BFN 3.2/4.2-73 Unit 1

H 4.2 ~

The (Cont'dj best test procedure of all those examined is to perfectly stagger the tests. That is, if the test interval is four months, test one or the other channel every two months. This is shown in Curve No. 5. The difference between Cases 4 and 5 is negligible. There may be other arguments, however, that more strongly support the perfectly staggered tests, including reductions in human error.

The conclusions to be drawn are these:

1. A 1-out-of-n system may be treated the same as a single channel in terms of choosing a test interval; and
2. more than one channel should not be bypassed for testing at any one time.

The radiation monitors in the reactor and refueling zones which initiate building isolation and standby gas treatment operation are arranged such that two sensors high (above the high level setpoint) in a single channel or one sensor downscale (below low level setpoint) or inoperable in two channels in the same zone will initiate a trip function. The functional testing frequencies for both the channel functional test and the high voltage power supply functional test are based on a Probabilistic Risk Assessment and system drift characteristics of the Reactor Building Ventilation Radiation Monitors. The calibration frequency is based upon the drift characteristics of the radiation monitors.

The off-gas post treatment monitors are connected in a 2-out-of-2 logic arrangement. Based on experience with instruments of similar design, a testing interval of once every three months has been found adequate.

The automatic pressure relief instrumentation can be considered to be a 1-out-of-2 logic system and the discussion above applies also.

The criteria for ensuring the reliability and accuracy of the radioactive gaseous effluent instrumentation is listed in Table 4.2.K.

The criteria for ensuring the reliability and accuracy of the radioactive liquid effluent instrumentation is listed in Table 4.2.D.

The RCIC and HPCI system logic tests required by Table 4.2.B contain provisions to demonstrate that these systems will automatically restart on a RPV low water level signal received subsequent to a RPV high water level trip.

BFN 3.2/4.2-73a Unit 2

I 4.2 3~ (Cont'd The conclusions to be drawn are these:

1. A 1-out-of-n system may be treated the same as a single channel in terms of choosing a test interval; and
2. more than one channel should not be bypassed for testing at any one time.

The radiation monitors in the reactor and refueling zones which initiate building isolation and standby gas treatment operation are arranged such that two sensors high (above the high level setpoint) in a single channel or one sensor downscale (below low level setpoint) or inoperable in two channels in the same zone will initiate a trip function. The functional testing frequencies for both the channel functional test and the high voltage power supply functional test are based on a Probabilistic Risk Assessment and system drift characteristics of the Reactor Building Ventilation Radiation Monitors. The calibration frequency is based upon the drift characteristics of the radiation monitors.

The off-gas post treatment monitors are connected in a 2-out-of-2 logic arrangement. Based on experience with instruments of similar design, a testing interval of once every three months has been found adequate.

The automatic pressure relief instrumentation can be considered to be a 1-out-of-2 logic system and the discussion above applies also.

The criteria for ensuring the reliability and accuracy of the radioactive gaseous effluent instrumentation is listed in Table 4.2.K.

The criteria for ensuring the reliability and accuracy of the radioactive liquid effluent instrumentation is listed in Table 4.2.D.

The RCIC and HPCI system logic tests required by Table 4.2.B contain provisions to demonstrate that these systems will automatically restart on a RPV low water level signal received subsequent to a RPV high water level trip.

BFN 3.2/4.2-72 Unit 3

~ t ~

I'