ENCLOSURE 2
NOTICE OF DEVIATION Tennessee Valley 'Authority Browns Ferry 3 Docket No. 50-296 License No.
DPR-68 During an NRC inspection conducted on November 16 -
December 15,
- 1991, a
deviation from your reply to Notice of Violation 91-26-02 for your actions taken to control contractor activities was identified.
In accordance with the "General Statement of Policy and Procedure for NRC Enforcement Action", 10 CFR Part 2, Appendix C, 1991, the deviation is listed below:
TVA in reply to Notice of Violation 91-26-02 dated October 9, 1991, stated that action taken to improve the control of inspection requests of contractor walkdown activities would be resumption of these activities using a phased approach.
Contrary to the
- above, on November 4,
- 1991, construction contractor walkdown activities were not resumed using a phased approach.
Contractor personnel performed safety related work.during a walkdown inspection involving partial removal of a secondary containment boot under work order 91-422447-00.
The contractor involved had only been released for non quality activities such as scaffold erection.
Performance of safety related work activities was not scheduled to be released until December 9,
1991.
This deviation is applicable to Unit 3.
Please provide U.S.
Nuclear Regulatory Commission, ATTN:
Document Control
- Desk, Washington, DC
- 20555, with a
copy to the Regional Administrator, Region II, and a copy to the NRC Resident Inspector, Browns Ferry, in writing within 30 days of the date of this Notice, the reasons for the deviation, the corrective steps which have been taken and the results
- achieved, the corrective steps which will be taken to avoid further deviations, and the date when your corrective action will be completed.
Where good cause is shown, consideration will be given to extending the response time.
FOR TME NUCLEAR REGULATORY COMMISSION Dated at Atlanta, Georgia this
$4i day of January 1992 Reactor Projects Branch 4
Division of Reactor Projects 920l270l79 920109 PDR ADOCK 05000259 0