Text
March 22, 1990 Docket Nos. 50-259, 50-260, and 50-296 Licerse Nos.
DPR-33, DPR-52, and DPR-68 Hr. Oliver D. Kingsley, Jr.
Senior Yice President, "Nuclear Power Tennessee Valley Authority 1101 Market Street 6N "8A Lookout Place Chattanooga, TN 37402-2801
Dear Mr. Kingsley:
SUBJECT:
BROVNS FERRY RE(UALIFICATION EXAMINATION REPORl 260/OL-90-01 The NRC administered examinations durirg the weeks of January 22 and February 5,
- 1990, to employees of your company who currently hold licenses to operate the Browns Ferry Nuclear Plant.
At the conclusion of the site visits, preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure
'1.
A table summarizing the examination results for each examined individual is provided in Enclosure 2.
Copies of the written examinations and answer keys adiriinistered during both weeks are included in this report as Enclosure 3.
A Rcqualification Program Evaluation Report is included as Enclosure 4.
This Evaluation Report finds that the Browns Ferry Program satisfies the criteria of NUREG-1021, ES-601 and is assigned an overall'ating of Satisfactory.
Accordingly, all commitments specified in the Confirmation of Action Letter (CAL-50-259,260,296/86-01) dated January 2,
- 1986, are considered to have been satisfied.
Your attention is invited to information in the Requalification Evaluation Report which describes the NRC concerns over examination development and administration.
These concerns have been discussed with your training staff both during the development and administration of the examination.
A Simulation Facility Fidelity Report is provided in, this report as Enclosure 5.
In accordance with 10 CFR 2.790(a),
a copy of this letter and Enclosures 1,
3, 4, and 5 will be placed i.n th'e NRC's Public Document Room.
Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.
t~
X I ~~
l
i n
I I
)
Mr. Oliver D. Kingsley, Jr.
~
~
~
0 March 22, 1990 Should you have any questions concernino this report, please contact us.
Sincerely, (original signed by B. A. Wilson)
Bruce A. Wilson, Assistant Director for Inspection Programs TVA Projects Division Office of Nuclear Reactor Regulation
Enclosures:
1.
Examination Report No. 50-260/OL-90-01 2.
Requalificaticn Pesults Summary Sheet (Official Use Only - Privacy Act Information) 3.
RO/SRG Examination and Answer Keys 4.
Reaualificat'.on Program Evaluation Report 5.
Simulation Facility Fidelity Report cc w/encls 1, 2, 4, and 5:
C.
H. Noe, Nuclear Training Branch
- 0. J. Zeringue, Site Director, Brcwns Ferry Nuclear Plant cc w/encls 1, 2, 3, 4, and 5:
A. R. Champion, Operations Training Supervisor cc w/encl 1:
State of Alabama bcc w/encls 1, 4, and 5:
W. S. Little, OSP E.
W. Merschoff, DRS G. T. Hopper, DRS D.
C.
- Payne, DRS Browns Ferry Senior Resident Inspector Operator Licensing Branch, NPR bcc w/encl 1, 3, 4, and 5:
(SEE PREVIOUS CONCURRENCE*)
RII*
RII*
CHopper:btm CCasto 3/
/90 3/
/90 RII
- WLittle 3/
/90 Tleebles 3@~/90
'ilson 3/~+/90
J I
Il
March 22, 1990
Enclosures:
l.
Examination Report No. 50-260/OL-90-01 2.
Recualification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.
RO/SRO Examination and Answer Keys 4.
Requalification Prooram Evaluation Report 5.
Simulation Facility Fidelity Report cc w/encls 1, 2, 4, and 5:
C.
H. Noe, Nuclear Training Branch
- 0. J. Zeringue, Site Director, Browns Ferry Nuclear Plant cc w/encls 1, 2, 3, 4, and 5:
A. R. Champion, Operations Training Supervisor cc w/encl 1:
State of Alabama bcc w/encls 1, 4, and 5:
W. S. Little, OSP G. T. Hopper, DRS D.
C. Payne, DRS Browns Ferry
$enior Resident Inspector Operator Licensing Branch, NRR bcc w/encl 1, 3, 4, and 5:
Document Control Desk RII GHopper:btm 3/y+90 RII C asto 3/g(/90 Rl 1 gg WL>ttle 3/phd/90 RII TPeebles 3/
/90 RI I BWilson 3/
/90
II.