~8 RtaII, fp.0~i 0
C O
l C
0l0 r+
o~
Cy
+**++
t UNITEDSTATES t NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 February 16, 1990 P
Docket File 50-260 LICENSEE:
Tennessee Valley Authority FACILITY:
Browns Ferry Nuclear Plant, Unit 2
SUBJECT:
SUMMARY
OF MEETING MITH TENNESSEE VALLEY AUTHORITY HELD ON FEBRUARY 13, 1990 TO DISCUSS THE BROMN FERRY NUCLEAR PLANT UNIT 2 CABLE INSTALLATION PROGRAM (TAC 00421)
On February 13, 1990, the staff met with the Tennessee Valley Authority (TVA or the licensee) at the NRC offices in Rockville, Maryland to continue discussions and to reach agreement for resolution of the Browns Ferry cable installation issues.
A list of attendees is attached as Enclosure 1.
Enclosure 2 provides TVA's handouts used in its discussions with the staff.
This meeting was a follow-up of previous meetings between NRC and TVA held on Decembr 18, 1989 (Meeting SuIIIIary dated December 22, 1989),
and January 18,,
1990 (Meeting Summary dated January 29, 1990).
At the meeting, TVA presented a revised test program incorporating the staff comments resulting from the January 18, 1990 meeting.
TVA provided a review of the ranking procedure by which conduits are selected for-testing and a
review of the confirmatory test program.
TVA stated that the conduit walkdown will note the actual conduit installation details and these details will be reflected in the calculation of the sidewall bearing pressure.
The staff concurred, with the test program proposed in Enclosure 2, subject to the following conditions:
1.
TVA will obtain NRC approval for any test which cannot be conducted on a flooded conduit.
NRC will reserve the right to substitute or require additional conduits to be tested if a wet test cannot be conducted on all conduits in the initial sample.
'7002260227 9002ih PDR ADOCK 05000260 P
PNU DFoI I fg
~
~
2.
During the test, the conduit will be maintained in a flooded condition to the extent practical.
No attempt will be made to drain the conduit prior to taking measurements.
TVA will review the test procedures to assure conformance with the above.
3.
TVA will notify the NRC as to when the conduit walkdown will be done.
TVA agreed to comply with the above staff requests.
Enclosures:
1.
Attendees List 2.
TVA Handout Original signed by Suzanne C. Black
" A. S. Masciantonio TVA Projects Division Office of Nuclear Reactor Regulation cc w/enclosures See next page
~ N
~
~O NAME :AMasci n Pio:TR DATE '2/l ~ /90
'2/l~/90
~
~
D
- SBl a 2//@90 W>>
~
~
~
~
~
Document Name:
MEETING
SUMMARY
2/13
I 0
CC:
General Counsel Tennessee Valley Authority 400 West Summit Hill Drive ET llB 33H Knoxville, Tennessee 37902 Mr. F. L. Moreadi th Vice President, Nuclear Eng ineer ing Tennessee Valley Authority 400 West Summit Hill Drive WT 12A 12A Knoxvi1le, Tennessee 37902 Dr. Mark 0. Medford Vice President and Nuclear Technical Director Tennessee Valley Authority 6N 38A Lookout Place Chattanooga, Tennessee 37402-2801
- Manager, Nuclear Licensing and Regulatory Affairs Tennessee Valley Authority 5N 157B Lookout Place Chattanooga, Tennessee 37402-2801 Mr. 0. J. Zeringue Site Director Browns Ferry Nuclear Plant Tennessee Valley Authority P. 0.
Box 2000
- Decatur, Alabama 35602 Mr. P. Carier Site Licensing Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. 0.
Box 2000
- Decatur, Alabama 35602 Mr. G.
Campbell Plant Manager Browns Ferry Nuclear Plant Tennessee Valley Authority P. 0.
Box 2000
- Decatur, Alabama 35602
- Chairman, Limestone County Commission P.
0.
Box 188
- Athens, Alabama 35611 Claude Earl Fox, M.D.
State Health Officer State Department of Public Heal.th State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Atlanta, Georgia 30323 Mr. Danny Carpenter Senior'esident Inspector Browns Ferry Nuclear Plant U.S. Nuclear Regulatory Comnission Route 12, Box 637
- Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U.S.
House of Representatives Washington, D.C.
20515 Tennessee Valley Authority Rockvi lie Office.
11921 Rockville Pike Suite 402 Rockville, Maryland 20852 Mr. Oliver D. Kingsley, Jr.
Senior Vice President, NucIear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
ENCLOSURE 1
ATTENDANCE LIST Browns Ferry -
NRC Meeting February 13, 1990 Cable Installation Concerns Name Bob Pierson Hukam Garg Angelo Marinos D. Crutchfield P. Carier
- 0. J.
Zeringue H.
H. Weber Jim Hutson Joe McCarthy Armand Masciantonio Suzanne Black B.
D. Liaw R.
M. Borchardt K. H. Brown J.
A. Fries T. A. Ippolito C. A. Patterson D.
R. Carpenter M. 0. Medford J.
R.
Bynum Or anization NRC NRC NRC NRC TVA TVA TYA TVA TVA NRC NRC NRC NRC TVA TVA TVA NRC NRC TVA TVA Phone No.
301-492-0757 301-492-0789 301-492-0768 301-492-0722 205-729-3570 205-729-3675 205-729-2476 615-632-2441 205-729-3604 301-492-1330 301-492-0796 301-492-3288 301-492-1727 615-632-8690 205-729-5169 301-770-6790 205-729-6196 205-729-6196 615-751-4776 615-751-4773
ENCLPSURE 2
BFN CABLE PULLBYS NEETING OBJECTIVES l.
Rt"VIEN RANKING PRCCESS 2.
REVIEH CONFIRMATORY TEST PROGRAM 3.
REVIEH TVA SUBNITI'AL AND CLARIFY AS BEQUIRED 4.
OBTAIN STAFF APPROVAL FOR BFN UNIT 2
0 0
BFN CABLE PULLBY RESOLUTION PLAN BANKING PROCEDURE IDENTIFY SAFETY BELATED CONDUITS N/NORE THAN ONE CABLE (APV. 1330)
IDENTIFY CONDUITS CONTAINING 8 OR MOBE CABLES Vl V3 OR 4 OR GABE CASLES V4 (APP.
230)
IDEN'ZIFY CONDUITS NITH LENGTH GBEATER THAN '20 'FEET (APP.
120) o PROVIDES LABGE GROUP CCNPARED TO POPULATION OF CONCERN
BFN CABLE PULLBY RESOLUTION PLAN CONFIRMATORY TEST PROGRAM 240 VOLTS PER MIL TIMES THE MINIMUMQUALIFIED THICKNESS NCrr ZQ EXCEED 7200 VOC NOZ TO EXCEED 80 o OF INDUSTRY STANDABD VALUES NRC NOTIFICATION REQUIRED IF NOT 240* MIN EQ THICKNESS.
o 5 MINUTE WITHSTAND o
NEZ %KRE POSSIBLE-CONSIDER PLANT SAFEZY CONSIDER MATER BEi410VAL NRC NOI'IFICATION REQUIRED TO 'DRY TEST-'
MINIMUMPOLARIZATION INDEX OF 1.0 OPTION TO RETEST ON LCM P.I.
BFN CABLE PULLBYS MEETING
SUMMARY
o RANKING PBOCEDURE WILL IDENTIFY FAMILY OF CONCERN o
CONFIBNATORY TEST PROGREH SCOPE IS SIGNIFICANZ o
SUCCESSFUL TESTS NILI RECONFIRM CABLE ISSUES REPORT lWHICH CONCLUDED PULCBY DAMAGE DOES NVZ EXIST AT BFN BHCAUSE OF:
NO EVIDENCE OF BRAIDED PULL HOPES FREQUEMI'ULL POINTS GOOD LUBRICATION PRACTICES SHORT CONDUIT RUNS NININM. OVERFILL CONDITIONS BULK RATHER THAN SYSTEM PULLS NO PULL BY FAILURE HISTORY PREVIOUS XVSTING RESULTS o
SUCCESSFUL CONFIRMATORY TESTS WILL RESOLVE BFN PULLBY ISSUE
BFN CABLE PULLBY RESOLUTION PLAN RANKING PROCEDURE (CONTINUED) o PERFORM INITIALRANKING USING:
L*FILL/RACEWAYRADIUS NEl'HOD TO BE CONFIRMED AFZER COMPLETION OF SWBP CALCULATIONS o
CONFIRM PRESENCE OF PULLBYS o
WALKDOWN 'lOP 30 o
CMCULATE PUKLBY SIDEWALL BEARING PRESSURES o
I RANK BY PEBCEÃZAGE OF AUXMABLHSIDEWALL BEARING PRESSURE o
I PERFORM CONFIRMATORY TEST OF CABLES IN 10 WORST CASE CONDUITS l00 200 CABLES 400 700 CONDUClQRS j) Denotes change from the j./18/90 meeting.
Meetin
- Summar, Memorandum for Tri Re orts or Site Vfsfts c Docket File NRC PDR Local PDR BFN Readfng ADSP Reading J.
Sniezek D. Crutchfield T.
Quay B.
D. Lfaw S. Black R. Pierson LA G.
Gears T.
Ross D. Moran B. Wilson, Region II W. S. Little, Region II D. Carpenter, Region II OGC A. Marfnos H. Garg M. Branch E.
Goodwin A. Masciantonio
, ACRS (10)
GPA/
CA (M. Callahan)
(3)
E. Jordan B. Grimes J.
Scarborough G. Marcus L. Norrholm C. Ader J.
Gray R. Borchardt 17-A-3 MNBB-3302 9-A-2 16-H-3 16-H-3 16-G-15 16-H-3 16-H-3 17-G-21 cc: Licensee/Applicant 8 Service List