Docket No.60-268 Mr. Oliver D. Kingsley, Jr.
Senior Vice President, Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37402-2801
Dear Mr. Kingsley:
January 31, 1989 Distribution NRC PDR Local PDR Projects Reading ADSP Reading DCrutchfield BDLiaw SBlack RPierson FMcCoy MSLittle MSivms GGears DMoran JRutberg SVarga BGrimes EJordan ACRS(10)
GPA/CA GPA/PA BFN Rdg.
Fi 1 e DTerao GGeorgiev
SUBJECT:
NRC DESIGN BASELINE AND VERIFICATION PROGRAM (DBVP) TEAM INSPECTION -
BROMNS FERRY NUCLEAR PLANT, UNIT 2 The NRC will perform a team inspection of the Design Baseline and Verifi-cation Progr'am (DBVP) during the period of February 27 - Miarch 10, 1989 at Knoxville.
The objective of this inspection, inspection tasks and inspectors participating on the team are identified in the enclosure.
Members of your staff wi 11 be kept informed of our inspection progress and significant findings.
An exit meeting with you or members of your staff will be conducted on March 10, 1989, in accordance with our normal procedures.
The inspection results of the team inspection wi 11 be transmitted to you through the standard NRC inspection report.
If you have any questions regarding this activity, please contact the NRC Project Manager, G. Gears at (301) 492-0767.
Sincerely, Original signed by
Enclosure:
(
DBVP Inspection Plan Outli,ne cc: w/enclosure See next page Suzanne C. Black, Assistant Director forProjects TVA Projects Division Office of h'uHear Reactor Regulatjon e
l,i iE
- See Previous Concurrence NAME: GGeorgiev:
DTerao DATE : 1/25/89
- 1/25/89
- RPierson 1/26/89
~ A
- SBlack
~
~
~
w
~
~
W&
~ \\
W&
OFFICIAL RECORD COPY S902060ll2 S90l3i PDR ADOCK 05000260 0
'I (&I,
,7
~,
I Ev I
I 4
I>
WW<<
t
&4~...
W(
~
li t'
t
&,I
~I
'(,4,', (, 4 E
~ I 4
4 E(
I
~ 4 I
WI Wu lvv E
<'Il I
1 ~
'I
~
I.)I&
Iuf
~ I
~
Jf I ll
,IE I
EP I
=J t &1 II V
I.Eft
'&I f
4
~ ff Iu I(I EW I>&&4 lf v WW(f I h(
'I I
~"
~
E&'
I I I
IW
~P I
E I
EIJ
~
~I',
4
~
I
'l(J &
4 ~
~,,
"I (J 4'll
\\
,I I
"4 Iu,
~
W E
WW-
~
I Al&I',E IV
~
="
E=f
%W
-'4 I 'I h
~
\\>>
I 4 I'
E
Mr..Olive".- D. Kingsley, Jr. Browns Ferry Nuclear Plant CC:
General Counsel Tennessee Valley Authority 400 West Summit Hill Drive Ell B33 Knoxvi1le, Tennessee 37902 Mr. R. L. Gridley Tennessee Valley Authority 5N 1578 Lookout Place Chattanooga, Tennessee 37402-2801 Mr. C.
Mason Tennessee Valley Authority Browns Ferry Nuclear Plant P.O.
Box 2000
Box 2000
- Decatur, Alabama 35602 Mr. D. L, Williams Tennessee Valley Authority 400 West Summit Hill Drive W10 885 Knoxville, Tennessee 37902
- Chairman, Limestone County Commission P.O.
Box 188
- Athens, Alabama 35611 Claude Earl Fox, M.D.
State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, N.W.
Atlanta, Georgia 30323 Resident Inspector/Browns Ferry NP U.S. Nuclear Regulatory Commission Route 12, Box 637
- Athens, Alabama 35611 Dr. Henry Myers, Science Advisor Committee on Interior and Insular Affairs U. S.
House of Representatives Washington, D.C.
20515 Tennessee Valley Authority Rcckville Office 11921 Rockville Pike Suite 402 Rockville, Maryland 20852
4
~
INSPECTION PLAN BROWNS FERRY Inspection Topic:
Date:
Inspection Report Hos; Inspectors:
Team Inspection of the Design Baseline and Verification Program (DBVP)
February 27 - March 10, 1989 50-259/89-07, 50-260/89-07$
50-296/89-07 1.
G. Georgiev, Team Leader 2.
P. Hearn, Mechanical Systems 3.
S. Traiforos, Nuclear Systems 4.
C. Kimura, Nuclear Systems 5.
R. McFadden, Electrical Systems 6.
N. Rivera, Electrical Systems 7.
L. Stanley, Instrumentation and Control 8.
P.
Chan, Instrumentation and Control 9.
A. DuBouchet, Mechanical Components 10.
M. Partridge, Mechanical Systems 11.
- 0. Mallon, Civil/Structural 12.
T. Tsai, Civil/Structural.
~0b'ective To review and assess the adequacy of the implementation f th 0
Ferry DBVP.
o e
rowns t1 T k:
1.
Review the status of open items from the last HRC Team I DBVP..
earn nspec<ion of 2.
Review a sample of available calculations and supporting documentation an interview cognizant TVA personnel to obtain pertinent information concerning the calculations aspects of the DRVP.
3.
Review a sample of Engineering Change Notices (ECNs).
4.
Review a sample of Configuration Control Drawings (CCDs).