ML18033A343
| ML18033A343 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 08/23/1988 |
| From: | Julian C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML18033A344 | List: |
| References | |
| NUDOCS 8809070280 | |
| Download: ML18033A343 (4) | |
Text
ACCELZRATED DISCI'RIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8809070280 DOC.DATE: 88/08/23 NOTARIZED-NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION WHITE,S.A.
Tennessee Valley Authority
SUBJECT:
Forwards Exam Rept 50-259/OL-88-01 administered on 880323 880502-12.
DISTRIBUTION CODE:
IE42D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Operator Licensing Examination Reports DOCKET 05000259 05000260 05000296 R
7' NOTES:1 B.
1 B.
1 B.
Copy each to: F.McCoy,J.G.Partlow, S.Richardson,S.Black, D.Llaw.
Copy each to: S.Black, J.G.Partlow, S.Richardson D.Liaw,F.McCoy.
Copy each to:
S. Black, J.G.Partlow,S.Richardson D.Liaw,F.McCoy.
05000259 05000260 05000296 A
RECIPIENT ID CODE/NAME PD INTERNAL: ACRS NRR MORISSEAU,D N
DLPQ/OLB 10 02 EXTERNAL: LPDR NSIC NOTES:
COPIES LTTR ENCL 1
1 2
2 1
1 2
2 1
1 1
1 1
1 5
5 RECIPIENT ID CODE/NAME PM AEOD/DSP/TPAB NRR/DLPQ/HFB 10 NUDOCS-ABSTRACT RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 A
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 20, ENCL 20
August 23, 1988 Tennessee Valley Authority ATTN:
Mr. S.
A. White Senior Vice President, Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen;
SUBJECT:
BROWNS FERRY NUCLEAR PLANT EXAMINATION REPORT 259/OL-88-01 The NRC administered examinations on March 23 and May 2-12, 1988 to employees of your company who had applied for licenses to operate the Browns Ferry Nuclear Plant.
At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
Copies of the written examination questions and answer key are included in this report as Enclosure 2.
Facility comments regarding the written examination are included in this report as Enclosure 3.
Enclosure 4 summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.
In accordance with 10 CFR 2.790(a),
a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any auestions concerning this letter, please contact us.,
Sincerely, (ORIGINAL SIGNED BY G. A. BELISLE FOR)
Caudle A. Julian, Chief Operations Branch Division of Reactor Safety
Enclosures:
l.
Exam Report 50-259/OL-88-01 2.-
RO/SRO Exam guestions 5 Answer Key 3.
Facility Comments 4.
Simulation Facility Fidelity Report cc w/encls 1
5 3:
R. J.
- Johnson, Corporate Training Dir.
'J.
G. Walker, Plant Manager cc w/encls 1, 2, 3
Il 4:
R.
G. Jones, Site Training Director bcc:
(See Page 2)
SS090702SO SSOS23 PDR ADOCK 05000259 V
Tennessee Valley Authority August 23, 1988 bcc w/encl 1:
G. Gears, Project Nanager, NRR W. S. Little, Section Chief, DRP
& 4:
Senior Resident Inspector Operator Licensing Branch, DLPg:NRR document Control Desk N. Daniels, Contractor, Sonalysts, Inc.
N. Sullivan, Contracto>,
Sonalysts, Inc.
R. Nilier, Contractor, Sonalysts, Inc.
W. Cliff, Contractor, Battelle PNL N. Parrish, Contractor, EG&G Idaho RII otal(W PRShaw:obw 07/07/88
. RI I, JA ildsen
'~8i< /sa c4Ai ~
RII J unro 02/'il(88 0 ]Wl~~
RIIpig KBrockman OX/a+88 "I,)hIl CAJulihn 0$/,)/88