Provides Revised Schedule for Completion of Vendor Manuals Control Program Discussed in Util .Schedule for Completion of HPCI Vendor Manual Will Be Completed on 881025
ML18033A302
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/03/1988
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8808110156
Download: ML18033A302 (6)


Text

ACCRLERATED IHPIRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8808110156 DOC.DATE: 88/08/03 NOTARIZED: NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION GRIDLEY,R.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Provides revised schedule for completion of vendor manual control program discussed in util 880129 ltr.

D1STRIBDTION CODE:

IE01D COPIES RECEIVED:LTR Q ENCL 0 SIZE: k TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:1 Copy each to: F.McCoy,J.G.Partlow, S.Richardson,S.Black, B.D.Llaw.

1 Copy each to: S.Black, J.G.Partlow, S.Richardson B.D.Llaw,F.McCoy.

1 Copy each to:

S. Black, J.G.Partlow,S.Richardson B.D.Liaw,F.McCoy.

DOCKET 05000259 05000260 05000296 05000259

05000260 j 05000296 A

D RECIPIENT ID CODE/NAME PD RNAL: ACRS DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/IXRB12 OE ERMAN,J E

F 02 S

DSR DEPY EXTERNAL: LPDR NSIC NOTES'OPIES LTTR ENCL 2

1 1

1 2

1 1

1 1

RECIPIENT ID CODE/NAME PM AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR DEPY RGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

I 9'

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 31 ENCL

TENNESSEE VALLEYAUTHORITY CHATTANOOGA. TENNESSEE 8740$

5H 157B Lookout Place AU8 03 1%ii U.S. Huclear Regulatory Commission ATTN:

Document. Control Desk washington, D.C.

20555 Gentlemen:

In the Hatter of Tennessee Valley Authority Docket. Nos. 50-259 50-260 50-296 BROGANS FERRY NUCLEAR PLANT (BFH) UNITS 1, 2, AND 3 HRC INSPECTION REPORT HOS. 50-259/84-23, 50-260/84-23, AND 50-296/84-23, VENDOR MANUAL CONTROL PROGRAH The purpose of thi-letter is to provide a revised schedule for the complet.ion of the vendor manuals discussed in TVA's letter dated January 29, 1988.

The update on the phase II Vendor Hanual Program involves 290 manuals, and to date 289 of these manuals have been completed.

Because of t.ecent changes to the startup configuration of the HPCI turbine, the schedule for completion of the HPCI vendor manual will be completed on October 25, 1988.

The. current date for completion of the phase II project will meet unit. 2 restart..

If you have any questions, please telephone Clare Hsieh, Licensing Browns Ferry Nuclear Plant,,

205-729-2635.

Very truly yours, TENHESSEE VALLEY AUTHORITY R. Gridley, Manager Nuclear Licensing and Regulatory Affairs cc:

See page 2

8808')Dig~

a

~DDC<<><002-s PQC An Equai Opportunity Employer

U.S. nuclear Regulatory Commission

<"8 88 888 Hs.

S.

C. Black, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One Mhite Flint, Horth 11555 Rockville Pike Rockville, Haryland 20852 Hz.. F. HcCoy, Acting Assistant Director Eor Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Harietta Street, HM, Suite 2900 Atlanta, Georgia 30323 Browns Ferry Resident Inspector Brogans Ferry Huclear Plant Route 12, Box 637