Forwards Review Assignments for Vol III of Util Nuclear Performance Plan.Preliminary Assessments Re Adequacy of Submittal Requested by 860910 as Meetings Scheduled W/Util for 860915-17 on Licensing & Startup Issues
ML18031A756
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/02/1986
From: Muller D
Office of Nuclear Reactor Regulation
To:
NRC
References
NUDOCS 8609080031
Download: ML18031A756 (5)


Text

Dockets Nos. 50-259/260/296 MEMORANDUM FOR:

See Attachment FROM:

SUBJECT:

Daniel R. Muller, Director BWR Project Directorate 82 Division of BWR Licensing STAFF REVIEW OF VOLUME III OF TVA'S NUCLEAR PERFORMANCE PLAN FOR BROWNS FERRY By letter dated August 28,

1986, TVA submitted Volume III of the Nuclear Performance Plan discussing actions taken or proposed to correct problems in the management and operation of the Browns Ferry Nuclear Plant.

The submittal also responds to information requested by the EDO's letter of September 17, 1985.

A copy of the submittal has been forwarded to you.

The attachment of this memorandum lists you as the lead reviewer responsible for preparing a safety evaluation on certain sections of Volume III.

In some cases, input will be needed from other offices or organizations within NRC; it is the lead reviewer's responsibility to obtain and integrate any necessary input from other offices into your evaluation.

Preliminary assessments regarding the adequacy of the submittal are requested by September 10,

1986, inasmuch as meetings are schedules with TVA for September 15-17,
1986, on licensing and startup issues.

Specific schedules for preparation of your safety evaluations will be developed in conjunction with each of you in the next several weeks.

As a target, we are working towards having draft SERs by October 31,

1986, and final SERs near the end of 1986.

Attachment:

See next page DISTRIBUTION:

iVil6k'1I~ IBiu"ar Daniel R. Muller, Di.rector BWR 'Project Directorate k'2 Division of BWR Licensing Doc et File NRC PDR Local PDR PD82 Reading RClark MGrotenhuis SNorris RBernero GLainas BGrimes HDenton HThompson SRichardson, IE

JTaylor, IE
BHayes, OI NGrace, RII LSpessard, DI SWeise, 'RII, SRConnelly, OIA GZech, RII BJYoungblood JHolonich CStahle TKenyon WLong

,TAlexion RWessman DMuller OFFICIAL RECORD COPY DBL:PD DBL:PDP@

DQQ+2 RCl ar MGrotenhuis D5I'1'ter P/o>/8 i/y/86

.g/~/86 860908003i 860'702 PDR hDOCK 05000259l P

PDR

4

NOTE:

This is draft "Strawman" - For Discussion Purposed Only At This Time Review Assignments for Browns Ferry Nuclear Performance Plan (Volume III)

Item I.

Executive Summary 1.0 Introduction II.

Conduct of Browns Ferry Activities 1.0 Strenghtening BFN Management and Organization 2.0 Management Control and Involvement 3.0 Plant Operations 4.0 Maintenance Program 5.0 Plant Surveillance Program 6.0 Radiological Controls and Chemistry Improvement 7.0 Plant Security 8.0 Emergency Preparedness 9.0 Site Scheduling III. Special Programs 1.0 Environmental gualification 2.0 Configuration Management 3.0 Seismic Design Program 4.0 Electrical Design Review 5.0 Fire Protection Improvement 6.0 Plant Welding Program 7.0 Intergranular Stress Corrosion Cracking 8.0 Restart Test Program Primar Res onsibilit All Designated Reviewers NRR/Vassallo -

FOB RII/Cantrell, Ignatonis-Projects RII/Julian - OB RII/Julian -

OB RII/Herdt, Julian - EB, OB RII/Collins -

EP 5 RPB r

RII/McGuire -

NMSS B

RII/Collins -

EPRPB J

NRR/Clark - PM,,

IE/Heishman - VPB IE/Embro - gAVT NRR/Liaw -

EB NRR/Srinivasan/EICB NRR/Hulman -

PSB NRR/Liaw -

EB NRR/Liaw -

EB RII/Jape -

EB

Item 9.0 Operational Readiness Primar Res onsibilit RII/Cantrell, Ignatonis-Projects IV.

Summary of Browns Ferry Commitments 1.0 Description of Commitment List 2.0 Methodology Used to Identify Restart Items 3.0 BFN Commitment Listing NRR/Clark, RII/Cantrell, Ignatonis - Projects RII/Cantrell, Ignatonis-Projects NRR/Clark, RII/Cantrell, Ignatonis - Projects