MONTHYEARIR 05000341/20245012024-10-0808 October 2024 – Emergency Preparedness Inspection Report 05000341/2024501 ML24276A2032024-10-0303 October 2024 FEMA Level 1 Finding Transmittal Letter ML24268A0992024-10-0101 October 2024 Power Plant – Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk Informed Approach to Address ECCS Strainer Performance IR 05000341/20240132024-09-30030 September 2024 Phase 2 Post Approval License Renewal Report 05000341/2024013 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24257A1652024-09-13013 September 2024 FEMA Region 5 Fermi 2 Nuclear Power Plant Level 1 Finding September 2024 ML24254A3562024-09-0909 September 2024 FEMA Level 1 Finding for Fermi 2024 Biennial Exercise ML24240A3532024-08-27027 August 2024 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval Update IR 05000341/20240052024-08-22022 August 2024 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2024005) IR 05000341/20240022024-08-14014 August 2024 Integrated Inspection Report 05000341/2024002 ML24199A2182024-07-25025 July 2024 Enrico Fermi Atomic Power Plant, Unit 1 - NRC Position on Continuation of Possession-Only License No. DPR-9 Past the Current Expiration Date (Docket No. 50-016) ML24169A4092024-07-18018 July 2024 Relief Request RR-A25, Alternative to Reactor Vessel Circumferential Shell Weld Examination IR 05000341/20243022024-07-0909 July 2024 NRC Initial License Reexamination Report 05000341/2024302 ML24173A1012024-06-14014 June 2024 Retake Exam Post-Exam Cover Letter & Comments ML24155A0852024-06-11011 June 2024 Operator Licensing Reexamination Approval Letter - Fermi Power Plant, June 2024 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000341/20244022024-05-30030 May 2024 Security Baseline Inspection Report 05000341/2024402 ML24143A1852024-05-29029 May 2024 – Regulatory Audit in Support of LAR to Adopt TSTF-505, Rev. 2, TSTF-439, Rev. 2, and TSTF-591, Rev. 0 ML24141A2072024-05-20020 May 2024 Plant—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection 05000341/LER-2024-002, Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications2024-05-16016 May 2024 Primary Containment Isolation Valve Declared Inoperable for a Period Prohibited by Technical Specifications 05000341/LER-2024-001, Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-222024-05-15015 May 2024 Automatic RPS Scram on High RPV Pressure While Attempting to Lower Generator Output During RF-22 IR 05000341/20240102024-05-0606 May 2024 NRC Inspection Report 05000341/2024010 ML24052A2772024-04-30030 April 2024 Issuance of Amendment No. 229 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 IR 05000341/20240012024-04-30030 April 2024 Integrated Inspection Report 05000341/2024001 ML24107B1372024-04-18018 April 2024 Confirmation of Initial License Reexamination June 2024 ML24101A3732024-04-11011 April 2024 Request for Information for NRC Commercial Grade Dedication Inspection: Inspection Report 05000341/2024012 ML24100A8422024-04-0909 April 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection: Inspection Report 05000341/2024013 IR 05000341/20234022024-04-0808 April 2024 Reissue - Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402 (Public) ML24088A2162024-04-0404 April 2024 Change in Estimated Review Schedule and Level of Effort for License Amendment Request for Risk Informed Approach to ECCS Strainer Performance IR 05000341/20243012024-04-0101 April 2024 NRC Initial License Examination Report 05000341/2024301 ML24086A5732024-04-0101 April 2024 Response to Disputed Non-Cited Violation Documents in Fermi Power Plant, Unit 2 - Cyber Security Inspection Report 05000341/2023402-01 Withdrawal of Non-Cited Violation (Public) IR 05000341/20244012024-03-22022 March 2024 – Security Baseline Inspection Report 05000341/2024401 (Public) IR 05000341/20240112024-03-0808 March 2024 Nbsp;Safety Conscious Work Environment Issue of Concern Follow-up Inspection Report 05000341/2024011 ML24002B1812024-03-0404 March 2024 Issuance of Amendment No. 228 Regarding Revision of Non-Conservative Technical Specification 3.4.5, RCS Pressure Isolation Valve (PIV) Leakage IR 05000341/20230062024-02-28028 February 2024 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2023006) ML24019A1842024-02-16016 February 2024 Exemption from Select Requirements of 10 CFR Part 73 Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24045A1602024-02-14014 February 2024 Operator Licensing Examination Approval - Fermi Power Plant, February 2024 IR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-001 January 29, 2018 Malik L Macomb County Juvenile Justice Center 400 North Rose Street Mt. Clemens, MI 48043 Hello Malik:
Thanks for your letter to Chairman Svinicki regarding your thoughts on nuclear power and the proposed new nuclear power plant next to the existing Fermi reactor near Monroe. The NRCs mission is to ensure the publics health and safety and protect the environment during the U.S. civilian use of radioactive materials. Please be aware that the nations nuclear weapons program, including the Rocky Flats facility, lies outside the NRCs authority. Rocky Flats and similar sites are under the control of the Department of Energy.
The NRC reviewed DTEs new reactor application for the Fermi site from September 2008 through February 2015. This thorough review covered both the safety and environmental aspects of building and operating the proposed reactor. The review included examination of how the Fermi I site would be completely cleaned up prior to any construction of the new reactor. In issuing the license for the Fermi new reactor, the NRC has concluded the public will remain safe if the reactor is built and operated.
The available evidence shows U.S. nuclear power plants have operated safely for more than 50 years. The radioactive material from the 1979 partial meltdown at Three Mile Island had no measurable effect on public health. Apart from Three Mile Island, U.S.
nuclear power plants have safely withstood severe events such as tornadoes, floods, and hurricanes including Andrew and Katrina with no impact to the public. In the years following the Fukushima accident, the NRC imposed additional requirements on operating U.S. reactors to enhance their ability to remain safe.
NRC research over the past decade has examined the potential consequences of a U.S. reactor accident. These detailed analyses of accident scenarios show that the post-Fukushima enhancements can stop an accident before it can affect the public.
Even if an accident cannot be stopped, the research shows the effects are much less than earlier thought. The potential radioactive material reaching the environment would only be enough to slightly increase cancer risk in the affected population.
The NRC approved the proposed design for the new Fermi reactor, the Economic Simplified Boiling-Water Reactor, in 2014. The design includes several safety features
that would operate without the need for electricity, meaning the reactor would be able to safely withstand the sort of events that occurred before the Fukushima accident. When the NRC decided to issue the Fermi new reactor license, the agency imposed conditions on the proposed reactor to account for the lessons learned from the Fukushima accident.
Used (or spent) nuclear fuel at U.S. nuclear power plants is currently stored safely and securely in one of two ways. Operating reactors such as the existing Fermi reactor (as well as most permanently shut down reactors) store spent fuel in robust pools made of reinforced concrete several feet thick, with steel liners. The water is typically about 40 feet deep, and serves both to shield the radiation and cool the fuel. The proposed new reactor at the Fermi site would include a pool with enough capacity for decades worth of spent fuel. Some of the NRCs post-Fukushima work considered the effects of a very severe earthquake on a spent fuel pool. That research concluded the pools will continue to protect the public after severe events, and that post-Fukushima enhancements can safely stop scenarios that might damage fuel in the pools.
Once the fuel has cooled off (normally after about five years), plant owners can move this colder spent fuel into "dry cask" storage. As shown in the diagram, the casks are typically steel cylinders that are filed with inert gas (such as helium or nitrogen) and either welded or bolted closed. The steel cylinder provides a leak-tight confinement of the spent fuel. Each cylinder is surrounded by additional steel, concrete, or other material to provide radiation shielding to workers and members of the public.
Casks have safely and securely stored spent fuel for several decades, and can continue doing so for some time.
The casks are monitored and inspected to ensure they continue to meet NRC requirements. The casks are very robust - casks at a plant in Virginia safely withstood a strong earthquake in 2011. Both the existing Fermi site and the proposed new reactor site have enough land for dry cask facilities large enough to store spent fuel from the reactors entire operating life.
The long-term approach to U.S. spent fuel involves storage instead of reprocessing.
The NRC is currently examining how the agency might re-start consideration of the application to license and build a permanent, national spent fuel repository at Yucca Mountain in Nevada. Two private companies have applied for licenses to build very large dry cask facilities in the U.S. Southwest. If those licenses were approved, they would provide consolidated spent fuel storage for the nation until a permanent facility is available.
2
Ive included additional information on the NRCs overall operations, the agencys response to the Fukushima accident, and spent fuel storage/transportation. Please feel free to e-mail me at Scott.Burnell@nrc.gov if you have any other questions.
Scott Burnell
/RA/
Office of Public Affairs Nuclear Regulatory Commission 3