ML18031A326

From kanterella
Jump to navigation Jump to search
Forwards Revision 13 to Fsar,Submitted as Amend 18 to OL Application
ML18031A326
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 12/12/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
Shared Package
ML18031A327 List:
References
ER-100450, NUDOCS 7912120384
Download: ML18031A326 (12)


Text

RESUL'ATOReINFORMATION DISTRIBUTION TEM (RIBS)

ACCESSION NBRe7912120384 DOC ~ DATE: 79/12/12 NOTARIZEDS YKS FACIL;50 387 Susquehanna Steam Electric Stationr Unit 1E Pennsylva 50 388 Susquehanna.

Steam Electric Stationi Onit-2r Pennsylva AUTH ~ NAME AUTHOR AFFILIATION CURTIS'

~ N, Pennsylva'nia Power 8 Light Co<-

REC'IP,NAME RECIPIENT AFFILIATION'ARR'gO AD, Li'ght Hater Reactors Branch 3

DOCKET ggoooaSS SUBJECT; Forwards Revision 13 to FSARgsubmitted as Amend 18 to OL appl ication.

g~

7-j~

DISTRIBUTION CODE:

BOOTS COPIES RECEIVED:LTR Qi ENCL + SIZE:

+P TITLE: PSAR/FSAR AHDTS and Related Cor.respondence

~0~~0: SCOITD ZfK Buys P&hrLK t~

REC IP IKNT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION!

05 PH ~gggP 1

1 AD L,~t, WQ 1

0 BC L.~

1 0

LAg~g j

o INTERNAL:

RKG F

09 GKOSCIEN BR 11 MECH ENG BR i3 MATL,'NG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8

C SYS BR 22 AD SITE TECH 27 EFFLT'TRT SYS 29 KIAKlhOOD AD PLANT SYS AD SI TE ANLYSIS HYDRO~METEOR BA GELD EXTERNAL: 03 LPDR 30 ACRS 1

1 2

2 4

1 1

2 2

1 1

ii o

1 1

1 1

1 0

i o

?

2 1.

0 1

1 10 10 02 NRC PDR 08 OPERA LIG BR 10 GAB'?

STRUC ENG BR 15 REAC

'SYS BR 17 CORK PERF BR 19 CONTAIN SYS 2i POKER SY8>>8R 26 ACGDNT AAL~YS 28 RAD ASMT HR AD FOR ENG AD REAC SAFETY:

DIRECTOR NAB MPA 04 NSIC 1

1 1

1 1

i 1

1 1

1 1

i 1

ii 0

1 0

1

'; 0 i

0 Q.KC gp l9N

~ooRE Ep&+ yp~

7. L e's'c H TOTAL NUMBER OF COPIES REQUIRED:

LTTR ZS ENCL 40

~

~

tI i

41

PPa,lL TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONEs (215) 821-5151 December 12, 1979 Mr. Olan D. Parr, Chief Light Water Reactors Branch No.

3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION AMENDMENT Ijl6 TO OPERATING LICENSE APPLICATION ER 100450 FILE 841-1 PLA-422 DOCKET NOS ~ 50-387 50-388

Dear Mr. Parr:

Attached are sixty (60) copies of Amendment No.

18 to the operating license application.

This amendment contains Revision No.

13 to Susquehanna SES Final Safety Analysis Report.

Very trul

yours, lAA N.

W. Curtis Vice President-Engineering 8 Construction CTC:mg 9766 Copy to:

Mr. Thomas M. Gerusky Director, Bureau of Radiation Protection Fulton Building P. 0.

Box 2063 Harrisburg, PA 17120 Attorney General Department of Justice Capitol Annex Harrisburg, PA 17120 Governor's Office of State Planning S< Development ATTN:

Coordinator, Pennsylvania State Clearinghouse P. 0. Box 1323 Harrisburg, PA

" 17120 I

Mr. Bruce Thomas President, Board of Supervisors R. D. 81

Berwick, PA Mr. George Pence U.S. Environmental Protection Agency Region III Office Curtis Building (Sixth Floor) 6th 6 Walnut Streets Philadelphia, PA 19106

'r.

J.E.

Carson Argonne National Laboratory 9700 South Cass Avenue Argonne, IL 60439 PENN SYLVAN I A POWER 8

L I GH T COMPANY

//s',O.

~ piss' fgygs gss

. ~

III II Jy C

BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION In the Matter of PENNSYLVANIA POWER 8 LIGHT COMPANY Docket Nos. 50-387 and 50-388 AMENDMENT NO. 18 APPLICATION FOR CLASS 103 OPERATING LICENSES FOR THE SUSQUEHANNA STEAM ELECTRIC STATION UNITS NO.

1 AND NO.

2 Applicant, Pennsylvania Power 6.Light Company, hereby files Amendment No.

18 to its Operating License Application dated July 31, 1979.

This amendment contains Revision No.

13 to the Susquehanna SES Final Safety Analysis Report which provides responses to NRC requests for additional information.

This amendment also contains corrections and revisions to the Final Safety Analysis Report.

PENNSYLVANIA POWER 8 LIGHT COMPANY BY:

Sworn to and subscribed before me this"",'8 a4 of November, 1979.

"A< '"" wz"'

q~~

~c mes e

I N.

W. Curtis Vice President-Engineering 6 Construction Notary,'Public

,~., c'--

My,,Comm mesio'riroExpoires:P~/~~lgpQ

FSAR REVISIONS The attached Revision 12 pages, tables,.and Figures revise the Susquehanna Steam Electric Station Final Safety Analysis Report.

Remove VOLUME 4 Insert N'13-25 PrI3-26

~13-6c

-26d 62-W2-51

~2-52 VOLUME 7

-W3

~6-28 T 6e 3.6-3(2ad page)

~

~

figure 3.7b-8 VOLUME 6 P. 9~77

~-77a d-5

10c-6

~K 27 Table 3.6-3(2nd page)

~

~

igure 3.7b-8

3. ~977 R9-77a c-5

&able 3.10c-17 (Pages 1, 2, 6 3)

~ 13-25 W13-26 26c

.13"26d M2-47

5. 2-48 M2-51

~2-52

~ 2-53 v5. 2-53a

~2-53b

~-54 5 ~ 3 3 REV. 13, ll/79

Remove W-4 Insert

~W-5 A.3"7-8

~3-9

~3"10

~3-10a

~

COb

~le 5.3-1a (Pages 1 8 2)

Sable 5.3-1b (Pages 1

Sr 2) addable 5.3-2a (Pages 1,

2 6 3)

Mable 5.3-2b gure 5.3-4a

., figure 5.3-4b

+gare 5.3-4e Pi'gure 5.4-13 figure figure

~Figure figure 5.3-4a 5.3-4b 5.3-4c 5.4-13a VOLUME 8 gable 6.1-1a(Pages 1 8 2) 3

.2-23a re 5.4-13b

~le 6.1-1a (Pages 1 6 2)

-9a

~~-23

~ 2 23a

-23c REV. 13, ll/79

Remove 6

-35

.2-36 6

-36a

.2-36b able 6.2-15 (Page 1) 34fle 6.2-15a (Pages 1 6 2)

ZCSle 6.2-19

~a le 6.2-20

~e 6.2-21

~KCe 6.2-22 Pigure 6,2-61 Pfgare 6.2-62 Yi~gure 6.2-63 figure 6.2-64 igure 6.2-65 Insert

.2-23d

.2 23e

.2-23f 6.2-23g 6

-35 6.2-36a

.2-36b gable 6.2-15 (Page 1)

~C.e 6.2-15a (Pages 1 8 2)

-Table 6.2-19 le 6.2-20 b1e 6.2-21

~e 6.2-22

$kgure 6.2-61 figure 6.2-62 figure 6.2-63 figure 6.2-64 J

igure 6.2-65 9,

/3-29

-30

~3 Oa

-30b REV. 13, ll/79

Remove

-21 W4-23

~24 VOLUME 10 Insert P4-22 P551e 7.4-3 (Pages 1-8) re 7.7-13 PQ-3

~able 8.1-1 Page 2

able 8.1-1 Page '3 VOLUME ll W. 3-23 3 23a

~3-23b

-23c 4.3-35 P&36 e 8.3-16 Figure 8.3-9 Figure 8.3-12 VOLUME 12

~. 2-3

~2-3a 10

-5 gZ -24a

.4-24b CI gable 7.4-3 (Pages 1-8)

~

~

figure 7.7-13 A".1-3

-4

., ale 8.1-1 Page 2

T e 8.1-1 Page 3

~ 3-23

~ 3 23a

-23b PrB-23c 8%-3~5 tw3 36 ble 8.3-16 Figure 8.3-9 Figure 8.3-12 1<2-3

~2-a REV. 13, ll/79

Remove 10.4-6 XO 4-6a g6. 4-6b

~aure 10.4-9 1.4-7 1

-8 VOLUME 13 VOLUME 16 Insert A.4-6 gO. 4-6a P4. 4-6b F

ure 10.4-9 1"13 4"7 "8

~Tbl~. 4-8 1.25-1

~1.40-1

.54-1'21.55-1

%21.64-1 21.65-1

~I.71"1 2f.73-1

~1.74-1 OK. 74-2 Kf.74-3 figure 021.74-1 thru 021.74-33

~0. 75"1 02I,. 76-1 1.77"1 REV, 13, ll/79

Remove Insert 1.79-1 0

.16-1 32.16-2

&3.16-3

/$2.40-1 0 0.30-1 40.30-2 23.1-1 figures 032.16-1 thru 032.16-29

.17-1 492. 40"1 0 0.30-1 40.30-2 PI1. 3-1 Pf1. 33-1

/1.35-1

.58-1 11.58-2

1. 7-1 1.129-1 1.130-1 11.131-1

.6-1 321 '-2 1.10-1 2.15-1 4

.1-1 2 ~

2 23.1-1 REV. 13, ll/79

Remove

~. 1-2 Insert 23.1-2

+3.5-1 REV. 13, ll/79