@RANRf 9KKD"8(II SEP ~8 SB oc,ets NRC PDR LPDR DESells PHLeech f<Dunc>>
~Car son,
~Cutchin ViF,1 iegel Otf)
Docf;et ffos." 50-387 50-308
/
P Pentlsylvania Power 5 Light Company ATTf.
ffr, floorman W. Curtis Vice President-Engineering and Construction 2 ft'orth Hinth Street Allentown, Pennsylvania 10101 Gentlemen:
SUBJECT:
If>FORf1ATION REqUEST RELATIffE TG POHD HILL RESERVOIR Additional information is needl.d for our environmental review of the proposed low-flow augmentation reservoir for the Susquehanna Steam Electric Station; f;nc]osure 1 lists the items for which adequate responses are necessary.
As you will note'from -the quehtions, we intend to t'.onducg'..4he review on the baiis.
of a 900-ft maximum pool level ratfler than 940-ft as discussed iri your Environmental Report Appendix,'f.
As discussed with f!illiam Barberich of*your staff, this recognizes the lik)ihood that the higher pool level will be agreed upon by your company and the Susquehanna River Basin Commission. If a different level is agreed upon or bthep significant design changes
- occur, pie'ase advise us promptly so that timely changes ih our assessment can be made..
The purpose of this effort is to pub'fish a supplement to our Draft Environmental
-.Statement (f~URE6-0564) relative to operation of the Susquehanna Steam Electric Station, >>hich will consider the.construction and operation of the Pond Hill Reservoir and alternative means of providing river flow augmentation.
Our present schedule is to publish the supplement by t!ovember
'fG, complete the public comment period by the end of December, an(l publish the Final Environmental Statement for the'tation and the reservoir early in February.
In order to meet the above schedule,. the information requested in this letter will 'be needed by October
- 15. If you find that some of the information cannot be provided by that date, please inform"Paul H. Leech by telephone (301-492-8444) as to when it may be expected, Sincerely, Qri<iml sined b).
H. Leech Donald E. Sells,
~p(o(w<
apl YiR~2-Acting Brancf =Chief n',
orrIcc~
OUANAMCW Encl(
OfiTC>
..DSE'EP. 2...."
PHLQQch~clc" sure:
z:ed-9/28/79
..DSE'EPM2..
.!.Su~~--
a--/-"P kl
.DSF EP..a.,
D.".
.DFSQWs-"-'"
~ '-"/ -/79- '
~
~I
~
ision of Site Safety and tl'v'ir'oniYeiiX'af"n5$
yÃ5'-I-'."'RC FORM Sl8 (9-76) NRCM 0240 4 U t, OOVORNMNNT PNINTINO OrrICAI ITT~ ttt Ttt
I
~
't
~
~
e
fIr. Ragnar Johnson SEP 18 fgg Thus; our assessment in the DES indicates that the Susquehanna Station should have no'>, significant eNects on the Danville water supply.
Coments recently received ori the t)ES are presently being reviewed during the preparation of,our Final Env Environmental Statement
{FES).
7 hope this response and,the enclosed envirenmental statement will be helpful to 'you.
A copy of the* FES will be sent when it is published several months from now.
Sincerely, P<>gF001 ggjlC4 yg Q.E~~
Hm. H; Reqan, Jr., Acting Assistant Director for Environmental Projects 5 Technology Division of Site Safety and Environmental Analysis Enclosure; As stated oar<ca~
OURHAI4a9D OATa&
~"DQE.EPuu"""
- PHLeech-.ckc
...9l.lGl.7.9......:.
DSE".EP 2-"-'hmmarr---"
9l..../79........-.
"DSE".EPuB"" " "'DSE".EP&T.
- DESeH s-'---
""NHRegan'.:9J....
J79........."....9l....:(79..
(,NRC PORM 518 (976) NRCM 0240 4'.a. oovarrrruarn s aiNrirro ornoa:
r ~ r ~
are rrr
I
> 'i()
IP P/
sl