Responds to Requesting Extension to 791021 for Commenting on Des.Closing Date Extended to 790905,but Since 2 Months Required to Complete Fes,Comments Can Be Included If Received by 791021
ML18031A268
Person / Time
Site: Susquehanna  
Issue date: 08/27/1979
From: Regan W
Office of Nuclear Reactor Regulation
To: Robinson D
SEDA-COG, LEWISTOWN, PA
References
NUDOCS 7909270856
Download: ML18031A268 (4)


Text

.Docket Nos; QLZiZ and 50-388 Hr. Dennis E. Robinson-Executive Director SEDA - Council of Governments Timberhaven RD 1

Lewisburg, Pennsylvania 17837 F

Dear Hr. Robinson:

NG 27 1979-c DISTRIBUTION:

~

Mocket Files (ENVIRON)

NRR Reading EP-2 Reading NRC PDR'PDR DNuller WRegan DSells PLeech b1Duncan JtRCutchin SNiner TERA This, is in response to your letter dated August 10, 1979, regarding the 45-day period for'oomenting on our'raft Environmental Statement (DES) relative to operation of the Susquehanna Steam Electric Station, Units 1 and 2.

You requested an extension beyond the August 21 closing date to October 21.

r Your letter indicates that SEDA is an A-95 clearinghouse.

However, we find that the Luzerne County Planning Comnission'nd the Economic Development Council of Northeastern Pennsylvania are designated in OMB Circular A-95 as

'the appropriate clearinghouses for Luzerne County, in which the plant site is located.

Both of.those organizations, as well as the State Clearinghouse,

. received copies of the DES.

Nevertheless, we recognize that your organization serves.one or more counties near the site w'hich may have an interest in the project.

Our regulations pro- 'q vide for a 15-day extension upon request. and we will therefore extend the closing date to,September 5.

However, the preparation of our Final Environmental Statement (FES) is expected to require about two months and we can include your comments if they are received by October 21'. If the FES does not include re-sponses to the comments, we will endeavor to have them available at subsequent

.hearings by the Atomic Safety and Licensing Board.

I hope you will find the above arrangement satisfactory.

=

Sincere1y, 18'999 r.fogg Wm. H. Regan, Jr., Acting Assistant

  • See previous yellow for concurrences Director for.Environmental Projects and Technology Division of Site Safety and Environmental Analysis orrioIIW OO IIIIA IllW OATIIW Eng.iJmexing..

Pennsylvania 2'1TN't'ai'N'iWt Al.1entown -P

4. Cans.txuat.i Power 8 Light

~Qgrgggo

~ ~ ~ ~ ~ 0 ~ ~ 0 ~ ~

~ ~a18101e

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~

~ ~ 0 ~ ~ ~ 0 ~ 0 ~ ~ 0 ~ ~ ~ ~ 0 ~ ~

Company

~ ~ ~

~

~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~

DSE:EP-2

~je'ecn

"(1lJunqan, 8/23/79 DSE:EP-2

.".Qke.Uz...........,.l) t;g.

8/23/79 8/LP/

~ 0 ~t ~ 0 ~ 0 9

ICE PGQR St0 (976) MXChf 0248 4 O 0 OOVIEOIIeICIItPIIIIITIIIOOrrICIIII ~t ~

ee ~

te ~

v

DISTRIBUTION:

tEIIVIROn Central Files NRR Rdg. File EPT Rdg. File LPDR NRCPDR DRMuller WHRegan

,JMCutchin Mr, Dennis E. R6binson SMiner Executive Director DESells SEDA

-'. Council, of Government's PHLeech g

'imberhaven RD'1, MDuncan'ewisburg, Pennsylvania

'17837 TERA

Dear Mr. Robinson:

/

k This is in response to your letter dated August 10, 1979, regarding the 45-day period for commenting on our Draft Environmental Statement (DES) relative to operation of the Susquehanna Steam Electric Station, Units 1

and 2.

You requested an extension beyond the August 21 closing date to'ctober 21.

DOCKET~NOS.: 387 50-388

.Your letter indicates that SEDA is an A-95 clearinghouse.

However, we find.

that the Luzerne County Planning gommission and the Economic Development Council of Northeastern Pennsylvania are designated in OMB Circular A-95 as the appropriate clearinghouses for Luzerne County, in which the plant site is located.'oth of those organizations, as well as the State Clearing-

house, received copies of the DES.

Nevertheless,

'lie recognize that your organization serves one or more counties

'ear the site which may have an interest in the project.

- Our regulations provide for a 15-day extension upon request and we will therefore extend the closing-date, to September 5.

However, the pr'eparation of our Final Environ-mental Statement (FES) is expected to require about two.months and we can include your comments if they are received by October 21. If the FES does.

not include responses to the comments, we will,endeavor to have them avail-able at'ubsequent hearings by the Atomic Safety and Licensing Board.

V I hope you will'find the above arrangement satisfactory.

/

Sincerely;

'cc:

Norman W..Curtis, Vice President Daniel R. Muller', Ac ing Director

. Di"',vssion of Site Safety,and Environmental At@lysis DSE.EPT EP-NDungan X"Hnegan 08 79 OfflCC~

OUIINAMC~

CATCHY Penns>lv

-"-- 2-tlorth-

...,.....A1leniavn nia Power E

L inth-St1 M'f

..P3....18lQl.

'ght'ompany P Leech:

r 08/g,P/?9, DS

-2 X DE s

OSL)$ I'ID DSE DRMuller 08/

/79 NRC PORN 518 (9.76) NRCH 0240

/

6 v 4 OovcANMANTI'AINTINOoffIcCI leT ~

a ~ ~

1 ~ e

"rll I

~

~

r

~ q ~

1 rr

'I II

'r I