ML18031A194

From kanterella
Jump to navigation Jump to search
Updates 780623 Deficiency Rept Re Unsatisfactory Field Welding & Insp of Shear Studs.Required Shear Stud Repairs Completed
ML18031A194
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/23/1979
From: Curtis N, Curtis R
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
PLA-385, NUDOCS 7907270258
Download: ML18031A194 (2)


Text

REGULATORNFORMATION OISTRISUTION SQPEM (RIOR)

ACCESSION NSRi-7907270258 DOC,OATEN'9/07/23 NOTARIZED'O FACIL:50 387 Susquehanna Steam Electric Station~

Unit ig Pennsylva 50-388 Susquehanna.

Steam Electric Station~

Unit 2E Pennsylva

'UTH'AHE AUTHOR AFFILIATION CURTIS'

~ IH ~

Pennsylvania Power fL Light Co ~

REC IP ~ NAME RECIPIENT AFFILIATION GRIEREB ~ Hs Region 1E Philadelphiai Office of the 0{rector

SUBJECT:

Updates util 790623 deficiency reptiltr re unsatisfactory field welding 8 insp of shear studs'equired shear stud repairs have oeen completed, DOCKET 0500038?

08~8 DISTRIBUTION CODE; B019S COPIES RECEIVED ~ LTR + ENCL ~

SIZE:

J T ITI K 2 CONSTRUCTION DEFICIENCY REPORT (10CFR50

~ 55E)

~

NOTES'~M ~~

YS 5 l93L'H~J Q"t L $.

QttMkd RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAi4tE LTTR ENCL ID CODE/NARK LTTR ENCL ACTION:

14 P~ WW6F.

20 LA ~g.3 15 BC ~~~

1 21 AD VQ5gp~gg) 1 INTKRNAL: 01 05 IRE 08 MPA 10 QAB 12 JORDAN'/IE 16 AD FOR ENGR 17 AD REAC SFTY 22 DIR DPM AD/SITE'ECH GEOSCIENCKS BR EXTERNAL: 03 LPDR 20 ACRS 1

16 1

02 NRC POR 07 EDO L STAFF 09 OEPY OIR OP~

11 STANDRDS DEV 13F IELD COOR/IE'7 AD PLANT SYS 19 AD SYS/PROJ 23 OKI D DIRKCTOR DSE STRUCT ANLYS BR 04 NSIC JUL-3 c 879 e

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ~

ENCL A

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18 IOI PHONE:

(215) 821.5151 r

NCRMANW. CURTIS Vice President Engrneering 6 Constructren 821-5381 July 23, 1979 RE@gpoyy g EJ f/QN'p)

Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 17406 SUSQUEHANNA STEAM ELECTRIC STATION REPORTABLE DEFICIENCY REGARDING UNSATISFACTORY FIELD WELDING AND INSPECTION OF SHEAR STUDS ERs 100450/100508 PLA-385

Dear Mr. Grier:

This letter is in reference to PP&Lts letter PLA-265, dated June 23, 1978, which transmitted a Definitive Report on the subject deficiency at Susquehanna Steam Electric Station.

The required shear stud repairs as described in the Definitive Report have been completed.

Please advise should you require further information.

Very truly yours, N.

W. Curtis Vice President-Engineering

& Construction JDV:mcb cc:

Mr. Victor Stello (15)

DirectorOffice of Inspection

& Enforcement U.

S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director (1)

Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. R.

M. Gallo, Reactor Inspector (1)

Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 go'~

PENNSYLVANIA POWER 6

LIGHT COPAPANY g gc 7>70>W