Discusses 781103 Deficiency Rept Re SSE Sys Standby Diesel Generator.Safety Impact to Be Evaluated & Results Transmitted by 790525.W/781103 Rept
ML18031A174
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/11/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
840-4, NUDOCS 7905110300
Download: ML18031A174 (4)


Text

LO REGULATORY DEFORMATION DISTRIBUTION SY ':M (RIDS)

ACCESSION N8R:7905110300 DOC.DATE: 79/05/11 NOTARIlED: NO DOCKET 0- 'QUEHAiVNA STEAM ELECTRIC STATIONS UNIT 1 g PENNSYLVA 05000387i'ACIL 0 388 QUFHANNA S t'EAM ELECTRIC STATION Ui' T 2g PENNSYLVA 05000388 AUT Au THOR A f'F I L I a T I ON CURTIS' ~

'zl ~ PENNSYLVANIA POwER Il, LIGHT CO ~

RECIP ~ NAME RECIPIENT AFFII IATION GRIER p B,H, REGION ll PHILADELPHIAN OFFICE OF THE DIRECTOR

SUBJECT:

DISCUSSES 781103 DEFICIENCY REPT RE SSE SYS STANDBY DIESEL GENERATOR ~ SAFE fY IMPACT TO BE EVALUATED 8 RESULTS TRAiVStilTTED BY 790525 ~ 8/781103 REPT ~

DISTRIBUTION CODE: B019S TITLE:

COPIES RECEIVED:LTR CONSTRUCTION DEFICIENCY g

REPORT ENCL $

(10CFR50 SIZE:

~ 55E) ~

scYs wrnc w IHi &loss . z p [ cy Ev~)<Nw6 Co~~/

0 TE I >><<>>'<<>><<>>>>>>>>>>>><<>>>><<>>>><<>><<<<<<<<>><<<<>>>>>>>>>>>><<>>>>

RECIPIENT COPIES RECIPIENT COPIES ID CODE/iVAME LTTR ENCL ID CODE/NAME LTTR ENCL ACTION: 1 4 PM H<0&Z 1 1 15 BCcra)@ 3 1 20 LA ~g-P 1 1 2 1 A D iIAS5+t.g.o 1 1 INTERNAL: REG FIlE 1 1 02 NRC PDR 1 1 07 EDO 8, STAFF 1 1 08 iv) 1 1 09 DEPY DIR DPN 1 1 10 GAB 1 1 11 STANORDS DEV 1 1 12 JORDAN'/IF 1 1 13F I ELD COOP/ I E 1 1 16 AD FOR ENGR 1 1 17 AD PLANT SYS 1 1 17 AD REAC SFTY 1 1 19 AD SYS/PROJ 1 1 22 DIR OPM 1 1 23 OELD 1 1 AD/SITE TECH 1 1 DIRECTOR DSE 1 1 GEOSC IFiVCES BR 1 1 STRUCT AiVLYS HR 1 1 EXTERNAL: 03 LPDR 1 1 Oii NSIC 1 1 2o ACRS le cM 8 1978 TOTAL NUMBER OF COPIES Hhi4ULRED: LTTR 43 ENCL b$

~> lloyd

~o UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

<<+*++

MEMORANDUM FOR: TERA Corp.

FROM: US NRC/TIDC/Distribution Services Branch

SUBJECT:

Special Document Handling Requirements

l. Please use the following special distribution list for the attached document.

II f9d /f

- $ %'7 9~

5

2. The attached document requires the following special considerations:

Q Do not send oversize enclosure to the NRC PDR.

Q Only one oversize enclosure was received please return for Regulatory File storage.

Q Proprietary information - send sffidaoit only to the NRC PDR Q Other: (specify) cc: DSB Files TEDC/DSB Authori ed S nature

PPa!L TWO NORTH NINTH STREET, ALLENTOWN, PA. 'I SIO'I PHONE: (2 I5) 82 I-S ISI (r(( (

NORMAN W. CURTlS Vice President ErgineerinrI 8 Constructrpn 82I-538I Mr. Boyce H. Grier Director, Region Z U. S. Nuclear Regulatory Commission 612 Park Avenue King of Prussia, Pennsylvania 18406 SUSQUEHANNA STEAM ELECTRZC STATION (SSES)

COOPER-BESSEMER COMPANY REPORT OF A DEFZCZENT PART ZN THE 'SSES STANDBY DZESELWENERATOR ERs 100450/100508. FZLE 840-4 PLA-352

Dear Mr. Grier:

This relates to a deficiency which Cooper<<Bessemer had reported to the Commission on November 3, 1978 under the provisions of 10CFR Part 21. The report stated that Cooper Energy Services, supplier of the emergency standby diesel-generators for SSES, had, during performance testing of engines similar to those or SSES, found that the surface of a roller pin in a crosshead assembly had exhibited abnormal wear. Zt was further stated that, though no engine shutdown nor malfunction had been experienced, it was felt thatr for longer Periods of engine oPeration, the abnormal wear condition could prcgress far enough to cause the engine to malfunction.

Although C.E.S. had reported the condition on November 3, 1978r, it was not until April 25, 1979, when NRC Resident Znspector R. M. Gallo grovided A. R. Sabol, pp&L, a copy of the C.E.S. report, that ppaL Susquehanna project personnel became aware of the eport.

Therefore> since the reporting responsibility under 10CFR Part 21 has already been discharged by C.E.S., PPSL recognizes its remaining responsibility for evaluating the condition under the terms of 10CFR 50.55(e).

Based upon the C.E.S. report, we conclude that the deficiency has potential for reportability and consider the details of the C.E.S. report to serve as an interim report in sati.sfaction of the provisions of 10CFR 50.55(e).

However, we intend to further evaluate the safety impact of the deficiency

/pe 7'0511 0'5~

PENNSYLVANIA POWER iL LIGHT COMPANY

Mr. Boyce H. Grier

/

and will advise the Commission of our final determination within thirty (30) days.

Very truly yours, N. W. Curtis Vice President-Engineering & Construction Attachments ARS:mcb ccrc Mr. J. G. Davis (15)

Acting Director&ffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington> D.C. 20555 Mr. G. McDonald, Director (1)