ML18031A159

From kanterella
Jump to navigation Jump to search
Provides Schedule for Responding to NRC Requesting Addl Info
ML18031A159
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/03/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Parr O
Office of Nuclear Reactor Regulation
References
PLA-341, NUDOCS 7904100339
Download: ML18031A159 (3)


Text

REGULATORY INFORi~lATION DISTRIBUTION SYSTEM (RIDS)

ACCKSS ION NBR: 7904100339 OOC

~ DATE: 79/04/03 NOTARIZED L NO DOCKET FACIL:50-387 SUSQUEHANNA STEAM ELECTRIC STATIONS UNIT li PENNSYLVA 05000

'50 388 SUSQUEHANNA STEAM ELECTRIC STATIONS UNIT 2g PENNSYLVA 050 38 AUTHeNAME AUTHOR AFFILIATION CURT 1St N,W ~

PENNSYLVANIA PONER 8

LIGHT CO ~

REC IP, NANK RECIPIENT AFFILIATION PARRgOeD.

'IGHT 'WATER REACTORS BRANCH 3

SUBJECT+

PROVIDES SCHEDULE FOR RESPONDING TO NRC 790124 LTR REQUESTING ADDL, 1NFO, DISTRIBUTION CODE:

B001B COPIES RECEIVED:LTR g ENCL g

SIZE:

TITLE: PSAR/FSAR AMDTS AND RELATED CORRESPONDENCE'ppes S~p

~~F E c~s~ ~ 6(( ~o h REC IP IEiNT ID CODE/NAME ACTION e 05 PM ~aviv~

BC INTERNAL:

0 06 I aE'9 GEOSCIEN BR ll MECH ENG BR 13 MATL'NG BR 16 ANALYSIS BR 18 AUX SYS BR 20 I 8

C SYS BR 22 AD SITE TECH 27 EFFL TRT SYS 29 K IRONWOOD AD PLANT SYS AD SITE ANLYSIS MPA EXTERNAL: 03 LPOR 30 ACRS COPIES LTTR ENCL 1

1 1

0 1

1 2

2 1

1 1

1 2

2 1

1 1

1 1

4 lJ 1

1 1

0 1

0 1

0 1

1 10 10 REC IP IENT IO ABODE/NAME AD VRSSgf(g~

02 NRC POR 08 OPERA LIC BR 10 QAB 12 STRUC ENG BR 15 REAC SYS BR 17 CORE PERF BR 19 'CONTAIN SYS 21 POSER SYS BR 26 ACCDNT ANLYS 28 RAD ASMT BR AD FOR ENG AD REAC SAFETY DIRECTOR NRR OELD 04 NSIC COPIES LTTR ENCL 0

1 0

1 1

1 1

1 1

1 1

1 1

1 1

1 1

~ 1 1

1 1

1 1

1 0

1 0

1 0

1 0

1 1

>i%

~8%2.

Bq 8 A.)~ pc EP54z cR TOTAL NUMBER OF COPIES REQUIRED:

LTTR 49 ENCL 39

~-

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONEc (2IS) 821 ~ 5151 3 1979 Air. Olan D. Parr, Chief Light Water Reactors Branch No.

3 Division of Project Management U. S. Nuclear Regulatory Commission Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION SCHEDULE FOR ADD1TIOiNAL INFORibLILTION REQUEST DATED 1"24"79 ER 100450 FILE 841-2 PLA-341 In response to your le tter of January 24,

1979, attached is a schedule for responding to the requested information.

If you have any questions please contact me.

Very truly yours, N.

W ~ Curtis Vice President - Engineering and Construction v 9O4 >003~

PENNSYLVANIA POWER 8

L IGH T COPhPANY

SUSQUEHANNA SES Schedule for Responses to h'RC Question List of Januar 24, 1979 mfa 31, 1979 032.21 032.24 032.29 032.31 032.32 032.34 032.36 032.44 032.45 032.47 211.26 211.27 211 '8 211.29 211.30 211.31 211.33 211.35 211.36 211.37 211.39 211.56 211.67 June 29, 1979 032.16 032.17 032.18 032. 19 032.20 032.22 032.25 032.26 032.28 032.30 032. 33 032.35 032.37 032.38 032.39 032.40 033.41 032.42 032.43 032.46 032.48 121.8 211.25 211.32 211.34 211.38 211.40 211.41 211 '2 211.54 211.60 211.62 211.63 211..64 211.65 211.66 July 31, 1979 032.23 032.27 211.43 211.44 211.45 211.46 211.47 211.48 211. 49 211. 51 211.57 Au st 31, 1979 211.52 211.53 211.55 211.58 211. 59 211.61 Septemher 28, 1979 211.50