Confirms Info Provided to NRC Inspector on 790227 Re Deficiency in Coax Cable.Cable Had Sections Which Exhibited Bubbles in Second Insulation,First Insulation Was Missing
ML18031A111
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/28/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
PLA-328, NUDOCS 7903070267
Download: ML18031A111 (4)


Text

REGULA TOR iVFORIMATION DISTR IBUTIOiV S

i Et<i (RIDS)

ACCESSIOiV ldoR:7903070267 DOC.DATE: 79/02/28 NOTARIZED:

NO FACIL:5 -

SUSQUEHA'DNA STEA~ ELECTRIC ST4TION, UNIT 1, PKNNSYLVA a0 3'

SQUEHANNA STEAM ELECTRIC STATION UNIT 2'ENNSYI VA AU T

~ i)

AUTHOR AFFILIATION CURTIS N.W.

PENNSYI YANIA POAER L LIGHT CO ~

REC LiP.NAY)K REC IP I ENT AFF ILI A T IOiV GRIERF B.H.

REGION 1)

PHILAOELPHIAF OFFICE OF THE DIRECTOR SUB JEC T:

CONF IRIS INFO PROV IOED TO. NRC INSPECTOR ON 790227 RE.

DKF IC IENC Y liV COAX CABLE ~ CABLE HAD SECT IONS

')4HICH EXHIBITED BUBBLES IiV SFCOND INSULATIONFFIRST IiVSULATION tNAS MISSING.

DISTRI8UTION CODE:

80198 COPIES RECEIVED:LTR fE.NCL ~ SIZE:

TITLE: CONSTRUCTION DEFICIE<NCY REPORT (IOCFR50.55E).

NOTES:~~~$ 9 Q 3

CWJ Z

P~~P

~ ~~(

DOCKET 05000387 05000388 RKC IP IENT ID CODE/NAVE ACTION:

14 PN KTH~,

20 LA LvJ~3 IiVTERNAL: 0 G

F 05 I~E 08 HPA 10 GAB 12 JOROANEE/IE 16 AO FOR EiVGR 17 AO REAC SFTY 22 DIR DPM EXTERNAL: 03 LPDR 24 ACRS COP IES LTTR ENCL 1

16 1

REC IP IENT ID CODE/NAME 15 BC C.aR%Z 21 AD VASSALc.o 02 NRC POR 07 EDO 8,

STAFF 09 OEP Y D IR OPIY 11 STANDRDS DEV 13F IELD COOR/IE 17 AD PLANT SYS 19 AO SYS/PROJ 23 OELD 04 NSIC COP IFS LTTR ENCL TOTAL NUt<BER OF COPIES RFQUIRKD: LTTR 39 Ei'!CL

PPB TWO NORTH NINTH

STREET, ALLENTOWN, PA.

18'101 PHONE:

(215) 821.5151 NOR'41AN W, CVRTIS Vice Presrcenr.En8rneerrng C, C nstrucmn 821-5881 February 28, 1979 Mz. Boyce E. Grier Director, Region I U. S. Nuclear Regulatory Commission 621 Park Avenue King of Prussia, Pennsylvania 18406 EUuvo;,>>()ct(ET v<<t= coj ~

SUSQUEPJQPiiA STEAM ELECTRIC STATION INTERIM REPORT OP A DEFICIENCY XN'.

COAX CABLE HAVXNG POTENTIAL POR REPORTABILXTY UNDER 10Cc'R50. 55 (e)

ERs 100450/100508 'ILE840-4 PLA-328

Dear Mr. Grier:

This serves to confirm information provided to NRC Inspector R. Gallo on 2/27/79 and zelates to a deficiency potentially reportable under the provisions of 10CPR50.55(e).

The deficiency concerns coax cable (Raychem Part 10483) purchased to Bechtel Specification 8856-=--131 rom Raychem Corporation.

Reels 1-Q09-3, 1-Q09-4 and 1-Q09-8 were found, during the cable cutting process, to have sections which exhibited bubbles in the second insulation (clear colored, cross linked polyolefin).

The defects were 'arge enough to be clearly disce nable through the outer jacket.

The first insulation (white'olored, polyarylene polymer) was noted to be missing throughout the sections of cable containing said defects.

Xn addition to the cable received thzough direct procurement fzom Raychem, s~ar Raychem coax cable types, which basically utilize the same manu actur-ing process, have been utilized by Westinghouse Elect ic Corporation as par of the Specification 8856-'135 elect. ical penetrations and General Electric Company as part oz the M-1 PGCC/ACR System for SSZS.

Bechtel Nonconformance

Report, NCR 3447 has been applied to the three (3) reels of Raychem coax cable.

The ecuipment suppl'ed by Westinghouse and G.E. will be investigated or defects similar to those ound in the "eels of cable and any additional nonconzorming condons wi'1 be documented and cont oiled by Bechtel Cons"mction Quality Cont ol.

790307024t PENNSYLVANIA POWER 5

LIGHT COMPANY

Mr. Boyce H. Grie February 28, 1979 Since the detai's oz this report provide info~ation relevant to the reporting zecuirements of 1CMR Part. 2', this correspondence is considered to also d'scha ge any

=o mal respcns'bi'i-ies PpaL may nave =or reporti.".g in compliance thereto.

As further information regarding the impact, on safety becomes available and a course of correct've action can be developed and the date by which said corrective action can be accomplished, you will be promptly advised; Very truly youzs, N. W.-Curtis Vice President-Engineering a Construction ARS:mcb cc; Mr. Z. G. Davis (15)

Acting Directoz-Office of Inspection

& Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director (1)

Office of Management Znformation a Program Control U. S. Nuclear Regulatory Ccmmission Washington, D.C.

20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P

0 Box 52 Sh"'ckshinny, Pennsylvania 18655

m) "Lr