ML18031A100

From kanterella
Jump to navigation Jump to search
Forwards Final Rept Re Deficiency Concerning spot-welded Strut Matl
ML18031A100
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 02/26/1979
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18031A103 List:
References
NUDOCS 7903010284
Download: ML18031A100 (3)


Text

REGULA Y

INFORMATION OISTRIBUTIO YSTEM (BIDS)

ACCESSION NBR: 7903010284 OOC ~ DATE: 79/02/26 NOTARIZFD:

NO FACI SQUEHANNA STEAM ELECTRIC STATIONS UNIT li PENNSYLVA

-388 S

QUEHANNA STEAM ELECTRIC STATIOiV UNIT 2z 'PENNSYLVA A

AUTHOR CURTIS'

~ Hi ~

ACIFIC GAS 5

ELECTRIC CO REC IP NAME P IENT AFF IL GRIERg8 ~H.,

REGION li PHILADELPHIAN OFFICE OF THE DIRECTOR

SUBJECT:

FORWARDS FINAL REPT RE OEF ICIENCY CONCERNING SPOT

'hELDED STRUTS'OCKET 05000387 05000388 DISTRIBUTION CODE:

8019S COPIES RECEIVED:LTR l ENCL

~

SIZE: +l~

TITLE: CONSTRUCTION OEF IC IENC Y REPOR T (10CFR50

~ 55E)

~

NOTES'~'AO F

~

FS l

07 REC IP IEN T ID CODE/NAME

, ACTION:

14 PM Q;~Br 20 La L.~r&3 COP IES LTTR ENCL 1

1 1

1 RECIPIENT IO CODE/NAWE 15 BC 4usl 4=/

21 AO VflSS~~

COPIES LTTR ENCL 1

1 1

1 INTERNAL:

05 IEE 08 MPA 10 QAB 12 JORDANtE/IE le AD FOR ENGR 17 AO REAC SFTY 22 D IR OPM 1

1 2.

2 1

1 1

1 1

1 1

1 1

1 1

02 NRC PDR 07 EDO 8

STAFF 09 OEP Y 0 IR DPM 11 STANDROS DEV 13F'IELO COOR/IE 17 AO PLANT SYS 19 AD SYS/PROJ 23 OELO 1

1 1

1 1

1 1

1 1

1 1

1 1

EXTERNAL: 03 LPOR 24 ACRS 1

1 le le 00 NSIC 1

1 MAR

~ ts79 Ap t TOTAL NUMBER OF COPIES REQUIRED'-

LTTR 39 ENCL 39

TWO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONE> (215) 821-5'151 NORMANW. CURTIS Vice >tres>cent Engiineer>ng 8 Constrvction 821.5381 February 26, 1979 Mr. Boyce H. Grier Director, Region I U. S. Nuclear Regulatory Commission 621 Park Avenue King of Prussia, Pennsylvania 18406 SUSQUEHANNA STEAM ELECTRIC STATION REVISED FINAL REPORT OF A DEFICIENCy IN SPOT WELDED STRUT MATERIAL DOCKET NOS: 50-387r 50-388 LICENSE NOS:

CPPR-101, CPPR-102 ERs 100450/100508 FILE 840-4 PLA-325

Dear Mr. Grier:

This supplements our letters PLA-249 dated April 26, 1978 and PLA-267 dated July 5, 1978 and transmits Revision 1 dated December 29, 1978, to the final report, which was previously forwarded via PLA-295 dated October 9, 1978 relative to the subject deficiency reported under 10CFR50.55(e).

The final report transmitted via PLA-295 identified items which required further evaluation in terms of actual loading conditions.

The revised report, transmitted herewith, utilizes actual design shears computed in individual members for all support types used in various buildings and at various elevations.

The results of the evaluations are summarized in paragraph 7.4 of the revised report.

NOTE:

As a result of the evaluationsr Powerstrut member PS-3080, which was previously identified as being acceptable, is now in a category which requires repair.

The items affected by this reassessment are heing maintained under the controls imposed by NCRs-3047 and -2501.

Very truly yours, N. W. Curtis Vice President-Engineering a Construction JRB:mch Attachment 0

P 9 0 3 O PENNSYLVANIA POWER

>L LIGHT COMPANY

$ 0 pic

Mr. B. H. Grier February 26, 1979 cc:

Mr. J.

G. Davis (15)

Acting Director-Office of Inspection a Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. G. McDonald, Director (1)

Office of Management Information

& Program Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.

O. Box 52 Shickshinny, Pennsylvania 18655