ML18030B279

From kanterella
Jump to navigation Jump to search
Forwards Preliminary List of Restart Issues in Anticipation of 860506-07 Meetings to Discuss Issues Which Must Be Resolved Prior to Restart of Plant
ML18030B279
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 04/24/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8604300224
Download: ML18030B279 (5)


Text

Docket Nos.:

50-259,

260, 296 Mr. S. A. White Manager of Nuclear Power Tennessee Valley Authority 6N 38A Lookout Place 1101 Market Street Chattanooga, Tennessee 37401 April 24, 1986 DISTRIBUTION

/~CKE~l PDR/LPDR RClark/MGrotenhuis SNorris EJordan Gray File BGrimes DMuller JPartlow RBernero ACRS (10)

HThompson OELD

Dear Mr. White:

SUBJECT:

BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 and 3

In anticipation of the meeting scheduled for May 6-7, 1986, in which we plan to discuss those issues which must be resolved prior to restart of Browns Ferry, Units 1, 2 and 3, I am enclosing the most recent list of restart issues identified by the NRC staff.

Please note that we continue to consider this list preliminary pending the May 6-7, 1986 meeting and subsequent discussions which may result.

We are providing this list so that your staff can be prepared to discuss the merits 'of each of the issues, and our respective schedules for resolution.

We look forward to a productive meeting on May 6-7, 1986, with your staff.

Sincerely, ptiglnal signed bV Daniel R Mutate~

Daniel R. Muller, Director BWR Project Directorate 82 Division of BWR Licensing

Enclosure:

's Stated cc:

w/enclosure See next page DBL:PD82 S

orris 4/4g/86 DRfpylgr:esp 4'/86 Saooaoomo Seooaa PDR ADOCK 05000259 P

PDR,

U 8

~

I

~-

Mr. S.

A. 1lhite Tennessee Vallev Authority Browns Ferry Nuclear Plant Units 1, 2, and 3

CC:

H. S. Sanqer, Jr., Esouire General Counsel Tennessee Valley Authority 400 Commerce Avenue E 11B 330 Knoxvi11e, Tennessee 37902 Mr. Ron Rogers Tennessee Val 1 ey Authority 5N 130B Lookout Place Chattanooga, Tennessee 37402-2801

Chairman, Limestone County Commission Post Office Box 188
Athens, Alabama 35611 Ira L. Meyers, M.D.

State Health Officer State Deoartment of Public !!ealth State Office Building Montgomery, Alabama 36130 Mr. K. !!. Hhitt E3AB 400 Hest Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37902 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georoia 30303 H. C. Bibb Site Director, BFNP Tennessee Valley Authority Post Office Box 2000

Decatur, Alabama 35602.

Resident Inspector U. S. Nuclear Reaulatory Comniss>on Route 2, Box 311

Athens, Alabama 35611 Mr. Donald L. t",illiams, Jr.

Tennessee Valley Authority 400 Hest Summit!!ill Drive, l!10B85 Knoxville, Tennessee 37902 Robert L. Lewis, Manager, RFNP Tennessee Valley Authority Post Office Box 2000

Decatur, Alabama 35602" Mr. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411

ENCLOSURE I BROWNS FERRY ISSUE

SUMMARY

Management A.

Site Management Organization B.

Employee Concerns C.

Employee Allegations D.

NSRS and NSRB Reports E.

INPO Findings Design Modification A.

Seismic Design B.

Fire Protection C.

Pipe Inspection/Stress Relieving/Repairs D.

Contractor Recommendations E.

Electrical Calculations (NRR)

(NRR)

Design Control A.

Environmental Qualification B.

Quality Assurance C.

Design Control (Configuration Management)

(IE)

IV.

Restart A.

B.

C.

D.

E.

F.

G.

H.

Inspection Regulatory Performance Improvement Program Operational Readiness Program Training Restart Test and Inspection Maintenance Improvement Program Physical Security Program Post Accident Sampling System MSIV Leakage Reduction Program (RI I )

V.

Licensing A.

B.

C.

D.

E.

F.

G.

H.I.

J.

K.

L.

Review Integrated Schedule Shift Staffing Unit 2 Reload Modification Amendment Appendix R Exemption Appendix J Exemption Organizational Change Amendment Independent Safety Engineering Group Evaluation Water Level Return Legs Cable Environmental Qualification Program Inservice Pumps and Valve Test Program Technical Specification Clarification Sechedule For ATWS Rule Implementation (NRR)