January 17, 1986 Docket Nos.
50-259/260/296 Mr. Hugh G. Parris Manager of Power Tennessee Valley Authority 500A Chestnut Street, Tower II Chattanooga, Tennessee 37401
Dear Mr. Parris:
SUBJECT:
10 CFR 50 APPENDIX R SCHEDULES DISTRIBUTION NRC PDR Local PDR PD¹2 Reading
, RBernero OELD EJordan BGrimes JPartlow RClark MGrotenhuis SNorris ACRS (10)
Gray File Re:
Browns Ferry Nuclear Plant, Units 1, 2 and 3
On December 3, 1985 your staff briefed us on the efforts you hav'e underway to achieve compliance with 10 CFR 50.48, and 10 CFR 50 Appendix R at Browns Ferry.
Your staff indicated that efforts are underway to bring Browns Ferry into compliance with the NRC fire protection requirements.
As part of this program, a revised fire protection and fire hazards analysis is being prepared based on the most recent NRC guidance in Generic Letter 85-01 and SECY 85-306.
We understand that the revised analysis will supersede your three previous Appendix R submittals and will be submitted about February 1, 1986.
Your letter of September 23, 1985 committed to complete whatever actions and modifications will be necessary to bring Browns Ferry Units 1 and 3 into compliance with 10 CFR 50.48 and Appendix R
prior to start-up from the current outages and have Unit 2 in compliance prior to startup from the next (Cycle 6) refueling outage.
At the meeting on December 3, 1985, your staff was not prepared to address the intermediate milestones between completion of the analysis and completion of all modifications.
On December 18, 1985, your staff discussed the proposed nuclear performance plan for Browns Ferry to address the NRC concerns outlined in our letter of September 17, 1985, and stated that you are "establishing and using a site master schedule."
We request that you provide a schedule of the various milestones that must be accomplished between completion of the fire hazards analysis and completion and check-out of the modifications, and that this schedule be updated quarterly.
Your response may include; but not be limited to such items as:
SbOi280360 860117 PDR ADGCK 05000259 (f
F PDR
0 t
p
>Ff k
F 1
ll
'C (1)
The start and completion dates of design (2)
The schedules for procurement actions (3)
The delivery schedules for materials (4)
The start and completion dates for work plans (5)
The start and completion dates for initiation of plant modifications, and (6)
The schedules for system testing and check-out.
The purpose of this request is to provide a vehicle with which we may monitor your performance in implementing the Appendix R requirements and to provide some forewarning of potential delays in implementation.
The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Sincerely, Original signed by'ichard J Clark Richard Clark, Project Manager BWR Project Directorate ¹2 Division of BWR Licensing CC:
See next page DB 'PD¹2 SN rris:rc Ol/ l>/86 DBL:PD¹ DClark 01//g/8 DBL:PD¹ DBL:PD¹2 MGrotenhuis D@PVQ Ol/(P/86 OI//&/86
1 l3 I)
Mr. Hugh G. Parris Tennessee Valley Authority Browns Ferry Nuclear.Plant Units 1, 2, and 3
CC:
H. S. Sanger, Jr., Esquire General Counsel Tennessee Valley Authority 400 Commerce Avenue E
11B 330 Knoxville, Tennessee 37902 Mr. Ron Rogers Tennessee Valley Authority 400 Chestnut Street, Tower II Chattanooga, Tennessee 37401 Mr. Charles R. Christopher
- Chairman, Limestone County Commission Post Office Box 188
- Athens, Alabama 35611 Ira L. Meyers, M.D.
State Health Officer State Department of Public Health State Office Building Montgomery, Alabama 36130 Mr. K. W. Whitt E3AB 400 West Summit Hill Drive Tennessee Valley Authority Knoxville, Tennessee 37902 Regional Administrator, Region II U.- S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Mr. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411 James A. Coffey Site Director, BFNP Tennessee Valley Authority Post Office Box 2000
- Decatur, Alabama 35602 Resident Inspector U. S. Nuclear Regulatory Commission Route 2, Box 311
- Athens, Alabama 35611 Mr. Donald L. Williams, Jr.
Tennessee Valley Authority 400 West Summit Hill Drive, W10B85 Knoxville, Tennessee 37902 Robert L. Lewis, Manager, BFNP Tennessee Valley Authority Post Office Box 2000
- Decatur, Alabama 35602'