MONTHYEARML24311A2242024-11-0606 November 2024 NRR E-mail Capture - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24290A1572024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds (L-2024-LLR-0047) ML24290A1552024-10-16016 October 2024 NRR E-mail Capture - for Your Action - RAI - Farley, Hatch, and Vogtle 1 and 2 - Proposed Alternative Request for Code Case N-572 ML24289A2002024-10-15015 October 2024 NRR E-mail Capture - for Your Action - RAI - Proposed License Amendment Request (LAR) for Vogtle Electric Generating Plant, Units 3 and 4 TS 3.7.6 Action E and SR 3.7.6.5 (L-2024-LLA-0083) ML24261B9282024-09-17017 September 2024 NRR E-mail Capture - for Your Action Discussion Points - Steam Generator Tube Inspection Call with SNC Regarding Vogtle, Unit 3 ML24250A1132024-09-0303 September 2024 Inspection Report 2024004 Radiation Safety Baseline Inspection Information Request ML24247A0092024-09-0303 September 2024 NRR E-mail Capture - Fyi - Revised Estimated Completion Date - Vogtle 3 and 4 - UFSAR Scheduler Exemption Request ML24250A1922024-08-29029 August 2024 Amendment Nos. 223/206 (1) - Email ML24232A0052024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - LAR and Exemption Request to Remove Tier 1 and Tier 2 Requirements for Vogtle 3 and 4 ML24253A0722024-08-15015 August 2024 Perspectives on Proposed Removal of Tier 1 and Tier 2 Requirements ML24225A0062024-08-0909 August 2024 NRR E-mail Capture - Acceptance Review - Vogtle 3 and 4 - LAR Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves), Action a and SR 3.7.6.6 (L-2024-LLA-0101) ML24206A0252024-07-20020 July 2024 NRR E-mail Capture - for Your Comments - State of Georgia - Vogtle Unit 1 - Emergency License Amendment Request for Technical Specification 3.7.9 ML24199A1592024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information - Vogtle 3 and 4 - Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Report ML24198A1672024-07-16016 July 2024 NRR E-mail Capture - Acceptance Review Vogtle 3 and 4 - License Amendment Request Changes to Technical Specification 3.7.6, Main Control Room Emergency Habitability System (Ves) Surveillance Requirement L-2024-LLA-0083 ML24197A1572024-07-15015 July 2024 NRR E-mail Capture - Acceptance Review - Farley and Vogtle 1 and 2, LAR - TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown ML24197A0172024-07-12012 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley and Vogtle 1 and 2 - Alternative Request for Pressurizer Welds ML24194A0032024-07-11011 July 2024 NRR E-mail Capture - Fyi - Acceptance Review - Farley, Hatch, and Vogtle 1 and 2 - Alternative Request for Code Case N-572 ML24180A0012024-06-26026 June 2024 NRR E-mail Capture - Acceptance Review Farley 1 and 2 and Vogtle 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2024-002 for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) (L-2024-LLR-0041) ML24170A9362024-06-18018 June 2024 NRR E-mail Capture - Fyi - Change to Estimated Completion Date for the SNC Fleet Physical Barrier Exemptions (L-2023-LLE-0018 and L-2023-LLE-0021) ML24178A3422024-05-16016 May 2024 NRR E-mail Capture - Request for Call - Proposed Vogtle 3 & 4 Tier 1 and Tier 2 Exemptions and LAR ML24120A0262024-04-29029 April 2024 COL Docs - FW Vogtle Electric Generating Plant, Unit 4 - Project Manager Reassignment ML24120A0462024-04-29029 April 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24119A0012024-04-28028 April 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Power Ascension Tests ML24108A0132024-04-16016 April 2024 NRR E-mail Capture - (External_Sender) Responses from Wednesday 4/10/2024 Call with Southern Nuclear Operating Co. Vogtle 3&4 Licensing Actions ML24107A7292024-04-15015 April 2024 Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection - Inspection Report 2024-02 ML24107A9322024-04-15015 April 2024 Document Request for Vogtle Electric Generating Plant Units 1 & 2 - Radiation Protection Inspection Report 2024-02 ML24106A0522024-04-12012 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle 1 and 2 - Emergency Diesel Generator (EDG) Voltage and Frequency License Amendment Request (LAR) (L-2024-LLA-0031) ML24100A7842024-04-0909 April 2024 NRR E-mail Capture - for Your Action - Request for Additional Information (RAI) - Vogtle, Units 3 and 4 - Alternative Request for Explosively Actuated Valves (L-2023-LLR-0016) ML24099A0372024-04-0505 April 2024 NRR E-mail Capture - Acceptance Review - Vogtle Unit 3, License Amendment Request (LAR) Technical Specification (TS) 5.5.13, Ventilation Filter Testing Program (VFTP) - L-2024-LLA-0043 ML24095A2412024-04-0404 April 2024 NRR E-mail Capture - Acceptance Review for the Exemption Request Regarding the Final Safety Analysis Report Update Schedule at Vogtle, Units 3 and 4 ML24072A3982024-03-12012 March 2024 NRR E-mail Capture - for Your Action - Second Round Request for Additional Information (RAI) - Vogtle, Unit 1 - SG Tube Inspection Report - 1R24 (L-2023-LRO-0067) ML24061A2372024-03-0101 March 2024 SNC Email Dated March 1, 2024, Regarding SNC Response to NRC Letter for Vogtle 3 & 4 RES Info ML24057A0872024-02-23023 February 2024 NRR E-mail Capture - Acceptance Review - Alternative Request for Explosively Actuated Valves at Vogtle, Units 3 and 4 ML24046A1352024-02-15015 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 - Completion of Initial Criticality and Low-Power Testing ML24039A1122024-02-0808 February 2024 COL Docs - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A0882024-02-0808 February 2024 COL Docs - Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24039A1922024-02-0808 February 2024 COL Docs - Correction - Re Fyi - SNC Notification Received of Vogtle Unit 4 Completion of Pre-Critical Tests ML24031A0502024-01-31031 January 2024 COL Docs - FW Erroneous Description of Tier 2 Change Process in Construction Lessons-Learned Report ML24017A1122024-01-17017 January 2024 NRR E-mail Capture - Request for Access to Cyber Security Data - Vogtle, Units 3 and 4 ML23360A0042023-12-23023 December 2023 NRR E-mail Capture - Fyi - Office of Nuclear Regulatory Research (RES) Requests for Vogtle 3 & 4 ML23348A0782023-12-13013 December 2023 NRR E-mail Capture - Voluntary Request for Closed Meeting Regarding Cyber Security Assessments at Vogtle, Units 3 and 4 ML23342A0802023-12-0808 December 2023 NRR E-mail Capture - Request for Additional Information (RAI) - Vogtle, Unit 1 - Review of SG Tube Inspection Report for Refueling Outage 24 (L-2023-LRO-0067) ML23331A9992023-11-27027 November 2023 COL Docs - Re Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23331A9492023-11-26026 November 2023 Email Dated November 26, 2023, from Bo Pham to SNC and NRC - Vogtle Seismic Hazard Report ML23331A9622023-11-22022 November 2023 Email Dated November 22, 2023, from SNC to NRC - Vogtle Seismic Hazard Report ML23326A2802023-11-22022 November 2023 COL Docs - Re Re ML23079A125 - Vogtle Electric Generating Station, Unit 3, NRC Response Letter to P. Durand, Regarding Comment on Federal Register Notice License Amendment No. 189 ML23320A0342023-11-16016 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) ML23312A2632023-11-0808 November 2023 COL Docs - Action Request for State of Georgia Comment by 5pm Monday, November 13, 2023 - Vogtle Units 3&4, LAR-22-002, TS 3.8.3, Inverters - Operating Completion Time Extension ML23320A2372023-11-0808 November 2023 NRR E-mail Capture - (External_Sender) Proposed LAR Regarding the Ultimate Heat Sink at Vogtle, Units 1 and 2 ML23311A1512023-11-0707 November 2023 COL Docs - Re Acceptance Review of Southern Nuclear Operating Company’S License Amendment Request to Remove Combined License Appendix C (EPID No. 2023-LLA-0123) 2024-09-03
[Table view] |
Text
Vogtle PEmails From: Kallan, Paul Sent: Tuesday, January 30, 2018 11:03 AM To: Vogtle PEmails
Subject:
VOG-RAI-Letter for LAR 17-033.docx Attachments: VOG-RAI-Letter for LAR 17-033.docx 1
Hearing Identifier: Vogtle_COL_Docs_Public Email Number: 211 Mail Envelope Properties (CY1PR09MB09877397D367743A628CF11EF6E40)
Subject:
VOG-RAI-Letter for LAR 17-033.docx Sent Date: 1/30/2018 11:02:55 AM Received Date: 1/30/2018 11:02:58 AM From: Kallan, Paul Created By: Paul.Kallan@nrc.gov Recipients:
"Vogtle PEmails" <Vogtle.PEmails@nrc.gov>
Tracking Status: None Post Office: CY1PR09MB0987.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3 1/30/2018 11:02:58 AM VOG-RAI-Letter for LAR 17-033.docx 36892 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
January 30, 2018 Mr. B.H. Whitley, Director Regulatory Affairs Southern Nuclear Operating Company, Inc.
42 Inverness Center Parkway, B237 Birmingham, AL 35242
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION LETTER NO. 1 RELATED TO PASSIVE RESIDUAL HEAT REMOVAL HEAT TRANSFER AND IN-CONTAINMENT REFUELING WATER STORAGE TANK HEAT UP TEST ACCEPTANCE CRITERIA CHANGE FOR THE VOGTLE ELECTRIC GENERATING PLANT UNITS 3 AND 4 COMBINED LICENSES (TAC NO. RP9705)
Dear Mr. Whitley:
By letter dated October 6, 2017 (ADAMS Accession NO. ML17279B017), Southern Nuclear Operating Company (SNC) requested an amendment to Combined License Numbers NPF-91 and NPF-92 for Vogtle Electric Generating Plant Units 3 and 4 respectively. The proposed license amendment request requires changes to the Updated Final Safety Analysis Report (UFSAR) in the form of departures from the incorporated plant-specific Design Control Document (DCD) Tier 2 information and a COL License Condition which references a UFSAR Section impacted by one of the proposed changes. Specifically, the proposed changes would revise the license basis documents to change the methodology and acceptance criteria for the in-containment refueling water storage tank (IRWST) heatup preoperational test described in UFSAR Subsection 14.2.9.1.3, item h and the passive residual heat removal (PRHR) heat exchanger preoperational test described in UFSAR Subsection 14.2.9.1.3, item g. These changes involve material which is specifically referenced in Section 2.D.(2) of the COLs for VEGP Units 3 and 4.
In the course of reviewing your request the NRC staff has identified the need for additional information. The request for additional information (RAI) is enclosed. Please respond to this RAI within 30 days of receipt of this letter.
If you have any questions or comments concerning this matter, you may contact me at
301-415-2809 or Paul.Kallan@nrc.gov.
Sincerely,
/RA/
Paul Kallan, Senior Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Docket Nos.52-025 52-026
Enclosure:
Request for Additional Information 1 CC: see next page
If you have any questions or comments concerning this matter, you may contact me at 301-415-2809 or Paul.Kallan@nrc.gov.
Sincerely,
/RA/
Paul Kallan, Senior Project Manager Licensing Branch 4 Division of New Reactor Licensing Office of New Reactors Docket Nos.52-025 52-026
Enclosure:
Request for Additional Information 1 CC: see next page Distribution:
Public RKaras BTravis RidsNroDnrlLb4 CPatel RButler RidsOgcMailCenter RidsRgn2MailCenter RidsAcrsAcnwMailCenter PKallan JDixon-Herrity NRO-002 OFFICE NRO/DEIA:BC DNRL/LB4:BC DNRL/LB4:PM NAME RKaras* JDixon-Herrity* PKallan
- DATE 01/30/18 1/30/18 1/30/18
- Approval captured electronically in the electronic RAI system.
Request for Additional Information 1
Issue Date: 01/30/2018 Application
Title:
VEGP Units 3 and 4 - LARs Operating Company: Southern Nuclear Operating Co.
Docket No.52-025 and 52-026 Review Section: 14.02 - Initial Plant Test Program - Design Certification and New License Applicants Application Section: 14.2.9.1.3 QUESTIONS 14.02-1 10 CFR Part 50, Appendix A, General Design Criterion 37, Testing of emergency core cooling system, requires in part that the emergency core cooling system shall be designed to permit appropriate periodic pressure and functional testing to assure the operability of the system as a whole and, under conditions as close to design as practical, the performance of the full operational sequence that brings the system into operation. The IRWST and PRHR heat exchanger make up part of the emergency core cooling system for this design.
One of the proposed changes in the LAR changes the acceptance criterion in UFSAR Subsection 14.2.9.1.3 from supporting the safe shutdown temperature criteria in Chapter 19 to demonstrating that the average IRWST heatup is consistent with the PRHR heat transfer modeling in Chapter 15. It is not clear to the staff how this acceptance criteria will be satisfied -
unlike the previous acceptance criteria, which had a clear numerical basis (420F in 36 hours1.5 days <br />0.214 weeks <br />0.0493 months <br />),
the revised acceptance criteria cites consistency with a modeling approach. The technical evaluation section of the LAR states that data from the test will still be used to support the overall PPRHR heat transfer assumptions, and that the use of LOFTRAN allows for a one-to-one comparison between the as-built plant and the safety analysis presented in Chapter 15.
Staff recognizes that testing at conditions akin to those in Chapter 15 and/or Chapter 19 may not be practical. However, the staff needs additional description of how the proposed test will demonstrate system performance under the expected conditions. Accordingly, staff requests that the applicant provide additional detail regarding the new acceptance criteria for a satisfactory test, and how the test data will be used to demonstrate consistency with the analysis documented in Chapter 15.