ML18030A548

From kanterella
Jump to navigation Jump to search
Provides Response to IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls. Valves That Do Not Remain in Emergency Mode Are Listed in Two Categories.Logic for Valves to Be Modified Will Be Completed Prior to Fuel Load
ML18030A548
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/27/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18030A297 List:
References
IEB-80-06, IEB-80-6, NUDOCS 8106050316
Download: ML18030A548 (1)


Text

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18 IOI PHONE: (215) 821-5151 NORMAN W. CURTIS Vice Presioent Engineering 8 Coretruction 821-5381 MAY 2'7 198l Mr. Boyce H. Grier, Director Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION IE BULLETIN 80-06 ER 100450 FILE 842-3 DOCKET NOS. 50-387 PLA"778 AND 50-388

Dear Mr. Grier:

The following information is provided in response to IE Bulletin 80-06, "Engineered Safety Fe'ature (ESF) Reset Controls".

IE Bulletin actions to be taken:

1. The drawings for all safety-related systems have been reviewed at the schematic level. The following two groups of valves do not remain in their emergency mode upon reset of an ESF a'ctuation signal.

. GROUP,I, ~ ~

Unit 1 Unit 2 HV-E41-1F002 HV-E41-2F002 HV-E41-1F003 HV-E41-2F003 HV-E51-1F007 HV-E51-2F007 HV-E51-1F008 HV-E51-2F008 HV-E51-1F088 HV-E51-2F088 HV-E41-1F100 HV-E41-2F100 HV-Ell-1F016 A&B HV-E11-2F016 A&B HV-Ell-1F028 A&B HV-Ell-2F028 A&B 8106050 Di~ PENNSYLVANIA POWER IL LIGHT COMPANY