ML18030A488
| ML18030A488 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 04/16/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| PLA-733, NUDOCS 8104210238 | |
| Download: ML18030A488 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8100210238 DOC ~ DATE: 81/00/16 NOTARIZED:
NO DOCKET FACIL:5 W.
usquehanna Steam Electric Stationi Unit ii Pennsylva 05000387 squehanna Steam Electric Stationi Unit 2g Pennsylva 05000388 AUT 4ME AUTHOR AtF CLI,ATION CURTISI V ~ ~ ~
Pennsylvania Power 8, Light Co ~
RECIPE VAuE REC IP Ic.N1 AFFILIATION YOUNGBLOODi8 ~ J ~
Licensf ng 8r anch 1
SUBJECT:
Confirms that loose parts monitoring sys will be installeo operational at time of fuel loao ~ Statement to this effect wi11 be added to FSAR in future revision.
DISTRIBUTION CODE! 8001S COPIES RECEIVED:LTR g ENCL
'IZE:
o TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Send ILE 3 copies FSAR 8 all amends'end ISE 3 copies FSAR 8 all amends'5000'387 05000388 RECIPIENT IO CODE/NAME, ACTION:
A/D I.ICENSNG RUSHBPOOKgM ~
INTERNALS ACCID EVAL BR26 CHEM ENG BR 08 CORE PERF BR 10 EMERG PREP 22 GEUSCIENCES 14 rlYD/GEO BR 15 iaE 06 LIC ulUAL BR MECH ENG BR 18 NRC PDR 02 OP LIC BR PROC/TST REV 20
~RR22 E~GI LE~
0 1 ST UCT ENG'BR25 COPIES LTTR ENC 1
1 REC IP IENT ID CODE/NAME YOUNGBLOOD,B STARKpR ~
00 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12'(QUIP QUAL BR13 HU'". FACT ENG 8R IltC SYS BR 16 LIC GUIO BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT'NAL BR 20 SYS INTERAC BR COPIES LTTR ENCL 1
EXTERNAL: ACRS NSIC 27 05 16 1
LPDR 03 APR 34 y98II TOTAL NUMBER OF COPIES REQUIRED:
LTTR 57 ENCL
TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr (215) 770 5151 NORMAN W. CURTIS Vice President
~ Engineering 5 Construction-Nuctear 770 5381 Mr. B. J.
Youngblood, Chief Licensing Branch 81 U. S. Nuclear Regulatory Commission Washington, D.
C. 20555 Susquehanna Steam Electric Station Loose Parts Monitoring ER100450 Fi 1 e 841-2 PLA-733 April 16, 1981 Docket Nos.
50-387 and 50-388
Dear Mr. Youngblood:
PP8L confirms that the Loose Parts Monitoring system will be installed and operational at time of fuel load.
This statement will be added to Subsection 7.7 of the FSAR in a future revision.
Very truly yours, N.
W. Curtis Vice-President-Engineering and Construction-Nuclear cc:
R.
M. Stark bcc:
N.
W.
W.
E.
B. A.
C. T.
R. J.
Curtis Barberich Snapp Coddington Shovlin ot
+0 I
8 1 0 4 2 1 0yQ8'ENNSYLVANIAPOWER IL LIGHT COMPANY