ML18030A463

From kanterella
Jump to navigation Jump to search
Advises That Util Will Install Interlock Between Inboard Main Steamline Isolation Value & MSIV-LCS Prior to Startup Following First Refueling Outage,Per SER Outstanding Issue 36
ML18030A463
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 06/10/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
PLA-803, NUDOCS 8106150265
Download: ML18030A463 (2)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTE:"I (RIOS)

ACCESS I 0 "I NBR, 81 061 50265 OOC ~ DATE 8 I/06/1 0 NOTARIZED NO FACIL:50-,387 Susquehanna Steam El ectr ic Stationt Uni t 1~

Pennsyl va 50-388 Susouehanna Steam Electric Station>

Unit 2~ Pennsylva AUTLi~ NAi4lE AUTHOR AFFILIATION CURTI S I'I0'8 ~

Pennsylvania Power 8 Liqht Co ~

RECIP ~ NA'~E REC TP TENT AFF TLIATTON

, SCHAENCERiA ~

Licensing Branch 2

SUBJECT:

Advises that util will install inter'lock between inbaard main steaml inc isolation value 8

NSIV LCS pr d'or to star tup following first r efuelinq outagegper SER Outstanding Issue36 DOCKET ¹ 0500 00038 DISTRIBUTION CODE:

80018 COPIES RECEIVED:

TR ENCL TITLE.'pSAR/FSAR AHDTS and Related Correspondence SIZE:

NOTES: Send TIt E 3 copies FSAR it a

1 1

amends

~ 1. cy.'BKiR LRG Pil(L ~ RIB)

Send T8E 3 conies FSAP.

Il all amends F 1 cy:BAR LRG PR(L ~ RTB) 05000387 05000388 RECIPIENT ID CODE/NA~E CTION:

4/D L I CE.'1SNG LIC BR ¹2 LA NTERNAL: ACC10 EVAL BRZo CHEH.Ei)G BR 11 CORE PERF 8R 10 E4lERG PRFP 22 E'4RG PRP L I C 36 FE'IA REP OIV 39 HU"I FACT ENG 40 IKC SYS BR 16 LIC Curn flR NATL E%G RR 17

+PA OELD POi'lER SYS BR 19 QA BR 21 REAC SYS BR 23 S1T ANAL BR 24 COPIES LTTR ENC 1

1 RECIPIENT L

I O CODE/N 4l" E LIC RR ¹2 RC STARK~RE 04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12 EHRG PRP DEV 35 EQUIP QUAL BR13 GEOSC IENCES 28 HYO/GEO BR 30 ICE nb LIC QUAL BR 32

'4ECH ENG BR 18 NRC PDR 02 OP LTC BR 34 PROC/TST REV 20 S

BR22 G

F 01 STRUCT ENG BR25 COPTER LTTR ENC 1

1

=XTERNAL: ACRR NSIC 41 n5 ib i

1 LPOR 03

PpaL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEs (215) 770-5151 NORMAN W. CURTIS Vice President-Engineering 8 Construction-Nuclear 770 5381 June 10, 1981 Mr. A. Schwencer, Chief Licensing Branch No.

2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, C.C.

20555 SUS(UEHANNA STEAM ELECTRIC STATION SER OUTSTANDING ISSUE ¹ 36 ER100450

, FILE 841-2 PLA-803

Dear Mr. Schwencer:

Pennsylvania Power

& Light Company will install an intet.lock between the inboard main steamline isolation valve and the MSIV-LCS.

This interlock will prevent the operation of the MSIV-LCS when the inboard main steamline isolation valve is open.

this interlock will be installed prior to the startup following the first refueling outage.

This letter completes our action of SER Outstanding Issue ¹36.

Very truly yours, N.W. Curtis Vice President-Engineering and Construction-Nuclear cc:

R.M. Stark 6ool 5

>/0

-'-:0"= >=-';:265 PENNSYLVANIA POWER 8

LIGHT COMPANY