ML18030A449

From kanterella
Jump to navigation Jump to search
Forwards RHR Drawings 8856-E-153 Sheets 2,4,6,8,47,49,51 & 53 Re RHR LPCI Pump Interlocks.Also Forwards GE Drawings 791E419WJ,Sheets 3 & 4 Re CS Interlocks.W/O Drawings
ML18030A449
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/27/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PLA-697, NUDOCS 8103310454
Download: ML18030A449 (2)


Text

REGULATORY NFOR'~ATION DISTHIB)jTION S""TEil (PIDS)

ACCESSION NBR.8103310454 DOC DATE. 81/03/27 NOTARl ED.

NO DOCKET FACIL:5 -

Susquehanna Steam Electric Station~

Unit 1~ Pennsylva 05000387 50 388 usquehanna Steam Electric Stationp Unit 2i Pennsylva 05000388 AUT AUTHOR AFFILIATIO>)

CURTI p9 ~ el, Pennsylvania Power 8, Light Co ~

REC IP ~ MAHE RECIPIENT AFFILIATION YOUNGBLOODrB.J.

Licensing Branch 1

SUBJECT:

Forwards RHR Orawings 885o E"153 Sheets 214rbi8r~)7i49r51 53 re RHR LPCI pump interlocks'lso forwards GE Drawinqs 791E419r~JiSheets 3

  • 4 re CS interlocks.h/o drawings

~

Or S TRI BUTIO~) CODE:

B0O > S COPIES RECEI VEO: LTR ENCL S I ZE:

TITLE: PSAR/FSAR a~)DTS and Related Correspondence NOTES:Send IE,E 3 copies FSAR 8 all amends'end I)l,E 3 copies FSAR L all amends'5000387 05000388 REC IP IENT ID CODE/NA~E ACTION:

A/0 LICE.')SNG RUSHBROOK r )~i ~

I<<TERNA): Ace [0 EvAL RR2e CHEH ENG BR 08 CORE PERF BR 10 E~ERG PREP 22 GEOSCIENCE S

14 HYO/GEO 8R 15 I R"-

ne LIC QUAL RR

)1FCH ENG BR NRC POR 02 OP LIC BR PROClTST RFV 20 RR22 FILE 01 T

CT ENG BR25 COPIES L.TTR ENCL REC IP IENT IO CODE/NA)')E YOUNGBLOODgB STARK~A 04 AUX SYS RR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUi) FACT ENG BR I)K,C SYS BR 16 LIC GUIO BR "ATL ENG BR 17

,MP A OELO POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BR COPIES LTTR E,'!CL 1

EXTER))AL: ACRS NSIC 27 05 1e 1

1 LPDR 03 APE TOTA)

<<u')BER OF COPIES

~F.QUIRED:

LTTR 57 Ei~iCL

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr {215) 770-5151 NORMAN W. CURTIS Vice President-Engineering rL Construction-Nuclear 770-5381 A

MT. B.J.

Youngblood Licensing Branch 1

U.S. Nuclear Regulatory Commission Washington, D.C.

20555 March 27, 1981

/

I m Susquehanna Steam Electric Station

'PCI and CS interlocks ER100450 Fi 1 e 841-2 PLA-697 Docket Nos.

50-387 and 50-388

Dear Mr. Youngblood:

Refer'o PLA-672.

Attached are RHR drawings 8856-E-153 sheets 2,4, 6,8,47,49,51;and 53 showing the RHR (LPCI) pump interlocks for Unit 1

and 2 pumps.

Also attached are GE drawings 791E419WJ sheets 3 and 4

showing the CS interlocks for Unit 1.

The CS Unit 2 interlocks are similar and are shown in phantom on the Unit 1 drawings.

Very truly yours,

/v - <<'. Pr,vv+/,

/5 N.W. Curtis Vice president-Engineering and construction-Nuclear cc:

R.M. Stark bcc:

N.W.

W.E.

B.A.

C.T.

R.J.

Curtis Barberich Snapp Coddington Shovlin S 1 0 S 3 I O /H:.

PENNSYLVANIA POWER' LIGHT COrrtPANY