ML18030A426
| ML18030A426 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/17/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| PLA-850, NUDOCS 8106190250 | |
| Download: ML18030A426 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION'YSTEM'RIDS)
ACCESSION NBR:8106190250.
DOC ~ DATE.: 81/06/17 NOTARIZED NO DOCKET' FACIL!50<<387 SUSquehannaE Steam-El eotr f C Statf Oni Unf t 1E PennSyl Ve 050003 50<<388 Susquehanna'team Electrfc Statfong Unit" 2'P Pennsylva 0~
AUTH',NAME'UTHOR AFFILIATION C UR TIS't N' W ~
Pennsylvania Power 8, Light Co ~
RECIP ~ NAMKr RECIPIENT. AFFILIATION SCHWENCEREA ~
LfcensingBr anch 2
SUBJECT'.. Revf sea>> schedule>
commf tment r e. SER Outstandfng, Issue>>
36 ~
Inter lock ~f1 1
be installed pr for to Unf t 1 fuel loads contf nugent upon del iver'y of qual ftfed. equipment; DISTRIBUTION CODE'. 80018'OPIES RECEIVED:LTR ERCL
'IZE'ITLE::
PSAR'/FSAR AMDTS and Re.lated Cbrrespondence NOTES:Send ILE 3 copfes-FSAR' all
- amends, 1
cyhBWR LRG PM(L,RIB)
Send IS,E' copies FSAR tl all amends,i cy!BWR'RG P9(CRIB) 05000387 05000388 R EC I P I EN T<
.IO COOK/NAMEi ACTION:
A/D LI CKNSNG, LIC BR ¹2'A INTERNAL: ACCID EVAL BR26'HEM ENG~ BR 11 CORE PERF BR'0 KMERG PREP 22'MRG.
PRP LIC 36 FKMA RKP DIV 39 HUM FACT'NG 40 IaC. SYS BR 16 LIC>> GUID BR'3-MATL ENG BR 17 MPA OELD POWER-SYS'R 19 QA BR 21 REAC SYS'R'3>>
SIT'NAL'R'4 COPIES'ECIPIENT'TTR EN L:,
ID'ODE/NAME' LIC" BR 42'C 1
STARKERS 04 AUX SYS BR 27 CONT'YS BR 09 EFF TR SYS BR12 EMRG PRP DKV 35 EQUIP QUAL BR13 GEOSCIENCE 8 28 HYD/GEO BR 30 I8E 06 LIC QUAL. BR 32 MECH ENG BR 18 NRC PDR'2'P LIC BR'4 PROC/TST REV 20 A'
BR22'TRUCT'NG BR25 COPIES'TTR EN 1
1 1
1 1
2 2
3 1
1 1
-1 1
1 L
EXTERNAL! ACRS'SIC'5r 16 1
1 LPDR'3 y@Rr %l H
o TOTAL NUMBER'F COPIES'EQUIRED:
LTTR' ENCL
TiiVO NORTH NINTH STREET, ALLENTOV/N, PA. 18101 PHONEr (215) 770-51 5 I ttQRLIANV/. CURTIS Vice Presiuent-Engineering C Construction-Nuctesr 720 5381 June 17, 1981 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAH ELECTRIC STATION SER OUTSTANDING ISSUE ¹36 ER 100450 FILE 841-2 PLA-850 Docket Nos.
50-387 50-388
Dear Mr. Schwencer:
This letter changes Pennsylvania Power' Light Company's schedule commitment stated in letter PLA-803, June 10, 1981.
The interlock, which will prevent operation of the MSIV-LCS when the inboard main steamline isolation valve is open, will be installed prior to Unit ¹1 fuel load, contingent upon delivery of qualified equipment.
This letter completes our action on SER Outstanding Issue ¹36.
Very truly yours,
,cm <
N. B. Curtis Vice President-Engineering and Construction-Nuclear cc:
R.M. Stark 8 106190g50
~y(
~Jr sr