fQ AUG X 3 f885 Docket Nos. 50-387 and 50-388 l1r. Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101
Dear Ilr. Curtis:
Subject:
Long Term Operability of Deep Draft Pumps
'g<.J t +
r IE Bulletin 79-15, dated July 11, 1979, was issued to all licensees and holders of construction permits as a result of deep draft pump deficiencies that were identified at, facilities both operating and under construction.
In your response to the bulletin you identified deep draft pumps as being utilized at your facility.
However, your response to the bulletin did not include enough information to demonstrate and assure the long term operability of these pumps.
Enclosed is a document entitled, "Guidelines for Demonstration of Operability of Deep Draft Pumps."
Within 60 days from the issuance date of this leter, you should, provide information on all the deep draft pumps identified in your bulletin response and describe the extent to which your deep draft pump long term operability assurance program conforms. to the various por tions of these Guidelines.
Emphasis should be placed on (1) the establishment of installation procedures that are followed each time these pumps are disassembled and reinstalled, and (2) the testing requirements and bearing wear criteria.
The instrumentation called for in the. Guidelines should not be considered a
requirement.
These Guidelines establish an acceptable method of assuring long term operability of deep draft pumps.
They do not, necessarily constitute the only method for demonstrating long term operability.
The staff will review the information you submit to determine whether your long term operability assurance program for deep draft pumps is in sufficient conformance with these Guidelines to assure long term operability. If not, the staff <<ill determine whether you have established and utilized other methods and procedures, preferably with the assistance of the pump manufacturer, that also demonstrate and"assure that these pumps will perform their intended function for the length of time required.
OFFICEIN SURNAMEP DATE$
8109030304 810813 PDR ADOCK 05000387 r',---'-"'G PDR i'
~ 0 ~
~ ~
~
0 ~
~
I1~ 0
~ 0 ~ 0 ~ 0 ~ 0 ~ 0 ~ OOH@0
~
~ ~
~ ~ Ott00 ~
~ ~ ~ ~ ~ 0 ~ ~
~ 0 ~ ~ ~ 0 ~ ~ ~ ~ 0 ~ 0 ~
~ 0 ~ Ott 0 ~ 0 ~ OOttO ~ 0 ~ 0 ~ ~ ~ ~
/
~ 0 ~ OOO ~I~ ~ OI ~ 0 ~ OO ~ 0 ~I ~ OO NRC FORM 318 u0-80) NRCM 0240 OFFICIAL RECORD COPY USGFO: 1984~960
S
re ~
r
~
1 r, I'
If you liave any questions regarding this matter, please contact the Licensing Project thanager.
Sincerely,
Enclosure:
Guidelines for Demonstration of Operability of Deep Draft Pumps cc w/enclosure:
See next page Robert L. Tedesco, Assistant Director for Licensing Division of Licensing Office of Nuclear Reactor Regulation Distribution Docket File NRC PDR Local PDR LBg2 Project Manager, RStark ASchwencer t5ervice RLTedesco/LBerry DGEisenhut/RPuple TERA NSIC TIC AYERS(16)
OI &E(3)
RHVollmer'lJohnston JSniezek ZRosztoczy RBosnak OFFICEI SURNAME)
DATEP DI:
~ ~ ~ ~ ~ 'r
~ ~
~ ~
~ ~
.P.Star.k.;n....
8/~@81
..... BL P....
.....ASc 8/<
81
~
~ ~ ~
~ $
~
~ ~ ~ ~ ~ ~ ~ ~
~"R s
8/I
~
~ ~ ~ rf ~
~ ~ ~ ~ ~
~ ~ ~ ~
~
~ ~
~ ~ ~ ~ ~ ~ ~
NRC FORM 318 UO/80) NRCM 0240 OFFICIAL RECORD COPY
'.1 USGPO:1980 329 824
~I 0E
~
S
Mr.'Norman W. Curtis Vice President - Engineering and Construction Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 CC:
Mr. Earle M. Mead Project Engineering Manager Pennsylvania Power and L'ight.Company North Ninth Street Allentown, Pennsylvania 18101 Jay Si.lberg, Esq.
Shaw, Pittman, Potts8 Trobridge 1800 M Street, NW Washington, D.C.
20036 Mr. William E. Barberich Nuclear Licensing Group Supervisor Pennsylvania Power
'8 Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Edward M. Nagel, Esquire General Counsel and Secretary Pennsylvania Power 8 Light Company 2 North Ninth'treet Allentown, Pennsylvania 18101 G.
Rhodes Redisent Inspector P.O.
Box 52 Shickshinny,.Pennsylvania 18655 "John L. Anderson Oak Ridge National Laboratory.
Union'arbide Corporation Bldg. 3500,, P;0.
Box X
Oak Ridge, Tennessee '7830 Gerald R. Schultz, Esq.
.,"Susquehanna Environmental Advocates
'. 0.'ox "l560 Mikes-'ane, Pennsylvania 18703 Mr. E.
B. Poser Project Engineer Bechtel Power Corporation P.O.
Box 3965'an"Francisco, California 94119
Susquehanna Servi ce List (cant.)
'r.
Judith H. Johnsrud Co-Director Environmental Coalition on Nuclear Power 433 Orlando Avenue State College, PA 16801 Mr. Thomas M. Gerusky,'irector Bureau of Radiation Protection Department of Environmental Resources Commonwealth of Pennsylvania P.O.
Box 2063 Ha'rrisburg, PA 17120 Ms. Colleen March Box 538A, RD84 Mountain Top, PA 18707 Mr. Thomas J. Halligan Correspondent The Citizens Against Nuclear Dangers P.O.
Box 5
- Scranton, Pennsylvania 18501 Mr. J.
W. Millard Project Manager Mail Code 394 General Electric Company 175 Curtner Avenue San Jose, California 95125 Robert W. Adler Dept. of Environmental Resources 505 Executive House P.O.
Box 2357 Harrisburg, Pennsylvania 15120
0