ML18030A334
| ML18030A334 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 08/03/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-REGGD-01.058, RTR-REGGD-01.146, RTR-REGGD-1.058, RTR-REGGD-1.146 GL-81-01, GL-81-1, PLA-895, NUDOCS 8108100259 | |
| Download: ML18030A334 (4) | |
Text
ACCESSIOV V SR FAC IL:50 337 50~358 AUTRE NAME CURTIS'
~ H ~
RECIP ~ VAMK KISEVHUTg D ~ G REGULATJ.
INFORMATION DISTR IBU TION
~ E'I (RIOS) 1 0 8 1 0 0 25 9 OUC ~ DATE 8 1 /0 8/03 NOTARI ZEO NO DOCKET Susquehanna Steam Electric Station~
Unit l~ Pennsylva 05000367 SJsquehanna Steam Electric Stations Unit 2< Pennsylva 05 AU THt) R AFF ILI ATION Pennsylvania Power 8, l.ight Co ~
RECIPIEN I'FFILIATION Division of Licensing
SUBJECT:
-Responds to Gener>c Ltr 81 01 re 8 testing 8 audit per>onnel,Util positions of Reg vu>des 1.58iRev OISTRIrB JT I JN CQDE:
A045S COr'IKS RECEIVED TITL=: Equ>pment Qualification (OR.
8, PRE NOTES:Send 18E 5 copies FSAR 8, all a~ends LPOR:2 cys.
Send ICE 3 copies FSAR 8 all arrenas LpDR:2 cyst qual i fication of inso exa~
commits to regulator y
ision 1
- LTR ENCL ~
SIZE:
OL)
~ 1 cy:S'nR-LRG PM(L ~ RI9) 05000367
~ 1 cy:8'htR LRG P9(L ~ RI8) 05000368 RKC Ip IKNT I J CODE/NAME.
ACTION:
LIC BR rr2 BC 10 COPIES
RES Flr ll la 24 01 EQUIP QUAL BROS VRC POR 02 OGC 21
'WILLIAMSg M, H ~ 22 EXTERNAL:
ACHS Nsic 25 0 "0 lo 1
LPOR VTIS 03 TOTAL,VU~BER OF Cur IKS HE<urRcD; LTTR Kr CL
TWO NORTH NINTH 5'TREET, ALLENTOWN, PA. 18101 PHONEr t21 5) 770-5151 NORMAN W. CURTIS Vice President-Engineering tL Construction-Nuclear 770.5381 August 3, 1981 Mr. Darrell G. Eisenhut Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555
=;HLt (g a
G07 l991~~9 ur51 NUaEAR
~M13S~
SUSQUEHANNA STEAM ELECTRIC STATION
RESPONSE
TO GENERIC LETTER 81&1 QUALIFICATION OF INSPECTION, EXAMINATION, AND.TESTING AND AUDIT PERSONNEL ER 100450 FILE 841-13 PLA-895
Dear Mr. Eisenhut:
In response to NRC Generic Letter 81&1, dated May 4,
- 1981, PP&L provides the following information.
As presented in Section 17.2 of the Susquehanna SES
- FSAR, PP&L commits to meet the regulatory positions of Regulatory Guides 1.58, Revision 1, and Regulatory Guide 1.146, Revision 0..
PP&L procedures and implementation as they relate to PP&L personnel are in full compliance with the requirements.
For the operational phase of Susquehanna
For the construction phase of Susquehanna
- SES, our Architect-Engineer-Constructor, Bechtel Power Corp.,
by operating under the Bechtel QA Program for SSES, is in compliance with the intent of Reg.
Guides 1.58, Revision 1
and 1.146, Revision 0.
Our NSSS supplier, General Electric Co., addresses 8108i00259 810803 PDR ADOCK 05000387 A
PDR PENNSYLVANIA POWER 5
LIGHT COAIPANY St a
Mr. Darrell G. Eisenhut Page 2
August 3, 1981 their position relative to Reg.
Guide requirements in the GE Quality Assurance Topical Report, NEDO-11209&4A; which was accepted by the NRC on September 29, 1980.
Very truly yours, N.
. Curtis Vice President-Engineering
& Construction-Nuclear RMH/mks