ML18030A331
| ML18030A331 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 07/21/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| PLA-888, NUDOCS 8107280597 | |
| Download: ML18030A331 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCKSSIOV NBR:8107280597 DOC ~ DATE: 81/07/21 NOTARIZED:
NO DOCKET ¹ FACIL:50 387 Susquehanna Steam Electric StationP Unit is Pennsylva 0500038 50 388 Susquehanna Steam Electric Stationr Unit 2r Pennsylva W00038 AUTH'AME AUTHOR AFFILIATION CURTIS'
~ L ~
Pennsylvania Power 8 Light Co ~
RECIP ~ 4AME RECIPIENT AFFILIATION SCHWKNCERt A ~
Licensing Branch 2
SUBJECT:
Advises of nods to co~mon water level ref point r'e SKR Outstanding Issue 9900perator training, on revised r ef level will be completed.Mimics will not be installed beside level indicator s ~
OISTRISUTION COOEl 8001S COPIES RECEIVEOrLTR ENCL Q SIZEt TITLE: PSAR/FSAR AMDTS and Re,lated Cor respondence NOTKStSend IEE 3 copies FSAR 8 all amends F 1 cy:BWR LRG PM(CRIB)
Send ISK 3 copies FSAR 8 all
- amends, 1
cy:BWR LRG PM(CRIB) 05000387 05000388 RECIPIENT ID CODE/NAME ACTION:
A/0 LICKNSNG LIC BR ¹2 LA INTERNAL: ACCID KVAL BR26 CHEM E4G BR 11 CORE PERF BR 10 EMRG PRP DEV 35 EQUIP QUAL BR13 GEOSC IENCES 28 HYD/GEO, BR 30 ICE.
06 LIC QUAL BR 32 MECH KNG BR 18 NRC PDRI 02'P LIC BR 34 PROC/TST REV 20.
SS BR22" REG L
01
~
T ENG BR250 COPIES LTTR EiVCL 1
1 REC IP IENT'D CODE/NAME LIC BR,¹2'C STARKERS 04 AUX SYS BR 27 CONT SYS BR 09 EFF TR SYS BR12'MRG.
PRP LIC 36 FEMA REP DIV 39 HUM'ACT FNG 40 ILC SYS BR 16 LIC GUID BR 33
'vIATI. ENG,BR'7
%PA OEI.D POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT'NAL BR 24 COPIES LTTR ENC 1
1 1
1 0
1 3
1 1
1 1
1 1
1 1
1 1
16 1
1 LPDR NTIS 03 0
TOTAL NUMBER OF COPIES REQUIRED:
LTTR ENCL.,
PPaL TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr t215) 770-5151 NORMAN W. CURTIS Vice President-Engineering 8 Construction-Nucleer 770.5381 July 21, 1981 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of 'Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 t
'or 3U'L 2 T S81 u Ee~~0+
6 SUSQUEHANNA STEAM ELECTRIC STATION SER OUTSTANDING ISSUE 99 ER 100450 FILE 841-2 PLA-888
Dear Mr. Schwencer:
In response to your concern on common water level reference point, PPGL will make the following modifications prior to fuel load:
~
1.
LR-1R615 and LI-1R610 will be converted to an instrument zero reference point.
After this change, all RPV level indication will use instrument zero as the reference point.
2.
Technical specifications and procedures will be altered as necessary to reflect the common reference point.
3.
Operator training on the revised reference level will be completed.
As a result of this change, PPGL will not be installing the mimics, previously suggested, next to the level indicators.
Very truly yours, N.
W. Curtis Vice President-Engineering and Construction-Nuclear CTC/mks 8i072805'717 810721 PDR ADQCK 05000387 E
PDR ENNSYLVANIA POWER 8
LIGHT COMPANY