REGULA TO:i INFORMATION DISTRIBUTION o STEi4l (RIOS)
SUBJECT:
Forwards responses to NRC questions re requalification progr am<confirming 810716 telcon, SIZE:
DISTRISUTIOR CODE:
80050 COPIES RECEIVED:LTR ENCL J TITLE: Operator Requal ification PE ogram ACCESSIOV iVBR:8107230117 DOC ~ DATE: 81/07/17 NOTARIZED:
NO DOCKET FACIL:50-387 Susquehanna Steam Electric Station~
Unit 1E Pennsylva 0500//
50-388 Susquehanna Steam Electric Stationi Unit 2i pennsyl AUTRE IVA4lE AUTHOR AFFLLIATION CURTIS/ N ~ 'H ~
Pennsylvania Power 8 Light Co ~
RE C I P ~ V A
%ATE RECIPIENT AFFILIATION SCH'5'lEIVCER E A ~
Licensing Branch 2
NOTFS Send I FrE 3 copi es FSAR 8 al 1
a%ends
~ 1 cy B>R LHG P 1(LR RIB)
Send 18E 3 copies FSAR Il all amends' cy.'SWR-LRG P9(CRIB) 05000387 05000388 RECIPIENT IO CODE/NA~E ACTION:
LIC BR "2 BC 07 INTERNAL: IRE 12'P LIC BR 05 COPIES LTTR ENCL 1
1
?
2 2
2 RECIPIENT IO CODE/NAME STARKERS WREG F I 02 01 COPIES LTTR ENCL 1
1 1
1 1
1 EXTERNAL:
1 1
1 INPOgJ
~ STARNES NSIC 00 g~, 28 1SSl 0'l TOTAL VU'ABER OF COPIES REAU1RED:
LTTR
~
ENCL.
TWO NORTH NINTH STREET, ALLENTOWN, PA. )8101 PHONEr {215) 770-5151 NORMAN W. CURTIS Vice President-Engineering IL Construction-Nuclear 770-5381 July 17, 1981
-'UL 2 3 l99') ~
CLEAR ~Tgg COh'ht 155 ICH Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Project Management Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION REQUALIFICATION PROGRAM ER 100450 FILE 835-04 PLA-884 Deai Mr. Schwencer:
Attached are responses to NRC Questions concerning the Requalification Program for Susquehanna SES.
This information confirms responses given during our telephone conversation of July 16, 1981.
Participants in that conversation were E.
R. Garison and W.
W. Williams of PP&L and R.
M. Stark and R. Campbell of the NRC.
Very truly yours, N.
W. Curtis Vice President-Engineering and Construction-Nuclear WWW/mks Attachment cc:
R. M. Stark NRC 8107230117 810717 PDR ADOCK 05000387 V
PDR PENNSYLVANIA POWER 5
LIGHT COMPANY
In response to NRC questions concerning the Requalification Program for Susquehanna
- SES, the following clarifications and commitments are made.
The next FSAR Revision will reflect these statements:
13.2.1.1 If an individual scores
<80% overall or <70%
in any area on the=annual
- exam, the license holder will be given accelerated upgrade training and re-examined within 2 weeks.
Periodic quizzes will be administered after each series of lectures.
- 13. 2
~ 2
~ 1
~ 2
~ 1 Each license holder will perform at least 10 reactivity manipulations during the 2 year license period.
These manipulations will be performed either on the plant or on the Susquehanna simulator.
13.2.2.1.4 If an individual fails the annual
- exam, the person will receive accelerated upgrade training and be re-examined within 2 weeks.
If the re-exam is failed, the person is immediately removed from license duties and a Performance Review Program will be implemented.
13.2.2.1.2.5 All license holders will attend a minimum of 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> annually on the simulator.
- 13. 2. 2. 1. 5 NRC approval will be required prior to resumption of license duties following an absence from license duties for four months or longer.
Last question (No number)
Each individual will receive a written examination and a performance evaluation annually.
Should the written exam re-take be failed or the performance exam failed, the person is immediately removed from license duties and the Performance Review Program implemented.
PP&L plans to submit the operator replacement training program to the NRC for review by 15 October, 1981.
PP&L plans to submit the mitigating core damage training program to the NRC for review by 1 November, 1981.
Page 2 of 2