ML18030A306
| ML18030A306 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/09/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| PLA-799, NUDOCS 8106120192 | |
| Download: ML18030A306 (3) | |
Text
'I REGULATO~INFOR~ATION DISTRIBUTION TEN (R IOS)
ACCESS.ION NBR: 8 1 06 1 20 1 92 OOC ~ DATE: 81/06/09 NOTARI 2ED:
NO FACIL:50-387 Susquehanna Steam Electric Station>
Uni t l~ Pennsyl va 50-388 Susquehanna Steam Electric Station, Unit 2I Pennsylva AUTRE NAME aUTXQR AFFILIATION CURTISi~eA ~
Pennsylvania Power 8, Light Co ~
REC IP. ijA~E RECIPIENT AFFILIATION SCHHENCERIA, Licensing B~anch 2
SUBJECT:
Forwards 810450 ltr re carbon tubing from Timken Co inadvertently omitted from orevious util ltr (PLA-828) ~
DISTR I BUT'ION CODE:
800 1 S COP IES RECE I VFO: LTR ENCL ~ SIZE:
TITLE: oSAR/FSAR AXOTS and Related Correspondence NOTES:Send 18E 3 conies FSAR P
al l amends.
1 cv:BAR LRG P4l(L ~ RIB)
Send ICE 3 cozies FSAR 8 all amends
~ 1 cy:BeR LRG PM(L ~ RIB)
DOCKET 050 05000387 05000388 REC I P IENT ID CODE/NAME ACTION
~
A/O LICFNSNG LJC BR w2 LA COPIES LTl'R FNCL l
0 0
~2 BC STARK g R ~
04 COPIES I TTQ ENCL 1
0 1
INTERNAL:
ACCIO EVAl BR26 CHEM E'4G BR CORF PERF HR 10 E~ERG PREP 22 EMRG PQP LIC 36 FE IA-REP OIV HU~ FACT ENG aP IEC SYS BR 16 LIC GUID BR 33 MAJ'L EVG RQ 17 iMP A OELD PO>>ER SYS oR 19 QA BR 21 QEAC SYS BR 23 SIT ANAL GR 2~
1 1
1 1
1 1
0 3
3 1
1 1
1 1
1 1
n 1
0 1
1 1
1 l
1 1
AUX SYS RR '7 CONT SYS 3R 09 EFF TR SYS BR12 EMRG PRP OEV 35 EQUIP QUAL OR13 GEOSC IENCES 28 HYO/GEO BR 30 I ja E 06 LIC QUAL BR 32
~ECH ENG BR 18
~lRC POR 02 OP LI C BR 3a PRnC/TST RFV 20
~
QA ASSESS BR22 0 1 STROCT ENG BR25 1
1 1
1 1
1 3
3 2
2 2
2 3
3 1
1 1
1 1
1
'1 1
1 1
1 1
1 EXTERNAL:
1
" LPOR 03 JUg 16 1981 4%
TOTAL NUMBER OF COPIES REQUIRE,D:
LTTR ~
ENCL
TWO NORTH NINTH STREET, ALLENTOWN, PA.
I 8 I 0l PHONEr t215) 770-5151 NORMAN W. CURTIS Vice President-Engineerinp 8 Construction-Nucieer 770 5381 June 9,
1981 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Docket Nos.
50-387 50-388 SUS(UEHANNA STEAM ELECTRIC STATION SER OUTSTANDING ISSUE 0 55 ER 100450 FILE 841-2 PLA-799
Dear Mr. Schwencer:
Attached is a letter from The Timken Company to Pennsylvania Power E Light Company which was inadvertantly omitted from PLA-828.
Very truly yours, N.
W. Curtis Vice President-Engineering 5 Construction-Nuclear Attachment cc.
R.
M. Stark PENNSYLVANIA POWER 8
LIGHT COMPANY
It"JIMKKM THE TtMKEN COMPANY GENERAL OFFICES CANTON OHIO U S,Ar 44706 TELEPHONE: (216) 453.4511 April 30, 1981 Nr. Daniel Sachs, N4 P
P
& L O2 North 9th Street Allentown, PA 18001
Dear Hz. Sachs:
The following is the information you reauested for the 6" 0.
D. z wall carbon tubing from Our Heat 81526:
1.
The material was heated to 2250 P for piercing.
2.
The material was reheated to 1750'F prior to the final hot, working operations.
3.
The estimated finishing temperature of the material should have been 1700'r".
4.
No reduction in wall thickness occurs during the final hot finishing operations under normal conditions.
I If there are any additional auestions,please do not hesitate to call.
Sincerely, r
/
G. r. Jones Quality Control Coordinator Steel me