ML18030A290
| ML18030A290 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/15/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML18030A291 | List: |
| References | |
| PLA-786, NUDOCS 8105220325 | |
| Download: ML18030A290 (3) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR;8105220325 DOC ~ DATE: 81/05/15 NOTARIZED; NO DOCKET ¹ FACIL:50 387 Susquehanna Steam Electric Stations Unit 1r Pennsylva 0503)4 50 388 Susquehanna Steam E)ectrfc Statfoni Unft 2'R Pennsylva AUTH BYNAME AUTHOR AFFILIATION CURTI Sr N ~ 'H B
Pennsylvania Powet 8 Light Co ~
RECIP ~ NAME RECIPIENT AFFILIATION
'. YOUNGBLOODRB,J ~
Licensing Branch 1
SUBJECT>
Forwards three drawings showing that ATHS recirculation oump trip circuit utilizes dedicated sensors to initiate trip.Drawing submittal completes action on SER Outstanding Issue 42.Aperture cards will be available fn PDR, DISTRIBUTION CODE:
BOOIS COPIES RECEIVED:LTR J ENCL $ ~I2E:
TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Send ILE 3 copies FSAR 8 all
- amends, 1
cy.'BWR-LRG PM(CRIB)
Send I8E 3 copies FSAR 8 all amends, 1 cy:BIrR"LRG PM(L RIB) 05000387 05000388 RECIPIENT ID CODE/NAME ACTIONS A/0 LICENSNG RUSHBRGOK MD INTERNAL: ACCID EYAL BR26 CHEM KVG BR 08 CORE PKRF BR 10 EMERG PREP 22 GEOSC IENCES 14 HYD/GEO BR 15 I8E 06 LIC QUAL BR MECH KNG BR 18 NRC PDR 02 OP LIC BR PROC/TST REY 20 R4D KSS BR22 E'
01 OCT ENG BR25 COPIES LTTR ENCL 1
0 1
0 1
1 1
1 1
1 1
0 1
1 2
2 3
3 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR ¹2 BC STARKRR ~
04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL BR 13 HUM FACT ENG BR I8C SYS BR 16 LIC QUID BR MATL ENG BR 17 MPA GELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT'NAL BR 24 COPIES LTTR ENCL' 0
1 1
1 1
1 3
3 1,1 1
1 1
1 1
1 0
1 0
1 1
1 1
1 1
1 EXTERNAL: ACRS NSIC 27 05, 16 16 1
LPDR 03
~
~
PN
/,roafNRCIE ~'s~
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 56 ENCL 50
a., S PPaL TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONE:
(215) 821-5151 NORMAN W. CURTIS Vice President. Engineering 8 Construction 821-5381 May 15, 1981 Mr. B. J. Youngblood, Chief Licensing Branch No.
1 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION SER OUTSTANDING ISSUE 42 ER 100450 FILE 841-2 PLA-786 Docket Nos.
50-387 50-3 T
q)-1) s ggj(ff) '~~
gy 2 L 1981 ~-
tr ~ Setm4AIt087
Dear Mr. Youngblood:
The ATWS Recirculation Pump Trip (RPT) Circuit utilizes dedicated sensors to initiate the trip.
Each logic system is divisionalized and either system will trip both pumps in a two-out-of-two logic on either high reactor dome
- pressure, or low-low reactor water level with an 8 to 10 second time delay.
The trip coils for this action are in the End-of-Cycle (EOC) breakers which will provide a prompt coast down of the recirculation pumps.
Drawing 731 E 287 WJ Rev.
6 (Reactor Recirculation Pump and MG Set Elementary Diagram) shows the ATWS-RPT.
This letter completes our action on SER Outstanding Issue 42.
Very truly yours, N.
W. Curtis Vice President-Engineering
& Construction-Nuclear CTC/mks Attachment cc:
R.
M. Stark NRC
+e ~tn PENNSYLVANIA POWER 8
LIGHT COMPANY 82 es es ogp5