ML18030A279
| ML18030A279 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/08/1981 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Youngblood B Office of Nuclear Reactor Regulation |
| References | |
| PLA-772, NUDOCS 8105140272 | |
| Download: ML18030A279 (4) | |
Text
REGUL RY INFORMATION DISTRIBUTI
. SYSTEM (RIDS)
ACCESSION NBR;8105140272 DOC ~ DATE! 81/05/08 NOTARIZED!
NO FACIL:50 387 Susquehanna Steam Electric Station~
Unit l~ Pennsylva 50 388 Susquehanna Steam Electric Station~
Unit 2~ Pennsylva AUTH BYNAME AUTHOR AFFLLIATION CURTIS'
~ <l ~
Pennsy 1 van f a Power 8 Light Coo REC IP ~ NAME RKC IP IENT AFFILIATION YOUNGBLOODiB,J ~
Licensing dranch 1
SIZE:
NOTES:Send I8,E 3 copies FSAR 8 all
- amends, Send I8,E 3 copies FSAR 8, all amends.
SUBJECT:
Documents 810323"27r0330 0403<0413>>16 8
28 30 meetings w/NRC review oranches in BethesdapMD r e open items on plant
- review, DISTRIBUTION CODE.:
B001S COPIES RECEIVED !LTR ENCL I
0 TITLE: PSAR/FSAR AMDTS and Related Correspondence DOCKKT 0500038 050 88 05000387 05000388 RECIPIENT ID CODE/NAME; ACTION:
A/D LICENSNG RUSHBROOKiM ~
INTKRNAI.: ACCID EVAL BR26 CHEM ENG BR Od COAE PERF BR 10 El4fERG PREP 22 GKOSC IENCES 14 HYO/GEO BR li I8,E 06 LIC QUAL BR MECH ENG BR 18 NRC PDR 0?
OP LIC BR PROC/TST REV 20
&S4 BR2?.
REG F ~
01 CT ENG BR25 COPIES L.TTR ENCL 1
1 1
1 1
1 1
2 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LIC BR ¹2 BC STARKgR ~
04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12'QUIP QUAL BR 13 HUM FAC T ENG BR I8,C SYS BR 16 LIC GUID BR NATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 COPIES LTTR ENC 1
1 EXTERNAL'CRS NSIC 27 05 16 1
1 LPDR 03
< <g qtIBl TOTAL NUMBER OF COPIES REQUIRED:
LTTR 56 ENCL
TWO NORTH NINTH STREET, ALLENTOWN, PA.
18101 PHONE:
(215) 821.5151 NORMAN W. CURTIS Vice President Engineering 5 Const~uction 821-5381 May 8, 1981 Mr. B. J. Youngblood, Chief Licensing Branch No.
1 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 9ef~ re ATION
/gf>~o r Docket Nos.
50-387 50-388 SUSQUEHANNA STEAM ELECTRIC STATION
'OG OF NRC MEETINGS ER 100450 FILE 841-3 PLA-772
Dear Mr. Youngblood:
This letter is to document the meetings between the NRC and PP&L to discuss the open items on the Susquehanna review.
These meetings were held in the GE offices in Bethesda, MD and were open to the public.
The meetings were held from March 23 thru March 27, March 30 thru April 3, April 13 thru April 16 and April 28 thru April 30.
PP&L representatives met with the reviewers of the following NRC Review Branches:
Power Systems Core Performance Materials Engineering Containment Systems Instrumentation and Control Quality Assurance Chemical Engineering Mechanical Engineering Hydrology Radiological Fire Protection Auxiliary Systems Reactor Systems Procedures and Test Review Emergency Procedures Structural Engineering Licensee Qualifications Siting Analysis PENNSYLVANIA POWER 8
LIGHT COMPANY
Mr. B. J. Youngblood Page 2
May 8, 1981 The following letters were filed in order to close out the open items during the meeting, PLA-669 thru PLA-690 PLA-694 thru PLA-703 PLA-721 thru PLA-733 Very truly yours, N. W. Curtis Vice President-Engineering 6 Construction-Nuclear CTC/mks