Responds to NRC 810325 Request for Estimate of Monthly Cost to Maintain Unit 1 in Inactive Status While Awaiting Full Power Ol.Delay of Unit 1 Will Impact Unit 2 & Cause Addl Expenses
ML18030A271
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/02/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Tedesco R
Office of Nuclear Reactor Regulation
References
PLA-705, NUDOCS 8105050584
Download: ML18030A271 (4)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8105050584 DOC ~ DATE! 81/04/02 NOTARIZED:

NO DOCKET ¹ FACIL:50 387 Susquehanna Steam Electric Station~

Unit 1~ Pennsylva 0

- 8 50 388 Susquehanna Stcam Electric Stationi Unit 2i Pennsylva 050003 AUTH BYNAME AUTHOR'FFILIATION CURTISi N ~ A ~

Pennsylvania Power 8, Light Co ~

RKCIPe NAME RECIPIENT AFFILIATION TKDESCOiR ~ LE Assi stant Director for Licensing

SUBJECT:

Responds to NRC 810325 r equest for estimate of monthly cost to maintain Unit 1 in inactive status while awaiting full power OL ~ Delay of Unit" 1 will impact Unit 2ause addi expenses; DISTRIBUTION CODE!

B001S COPIES RECEIVED!LTR ENCL SIZE:

t TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Send I8,E 3 copies FSAR 8 all

amends, Send I8E 3 copies FSAR 5 all amends'5000387 05000388 RKC IP IENT ID CODE/NAME:

ACTION!

A/D LICENSNG RUSHBROOKiM~

INTERNALS ACCID EVAL BR26=

CHEM ENG BR 08 CORE PKRF BR 10 EMERG PREP 22!

GEOSCIENCES 14 HYD/GKO. BR 15, ILK.

06 LIC QUAL BR MECH ENG. BR 18 NRC PDR 02:

OP LIC BR PROC/TST REV 20 RAD SS BR22' FI 01.

T0 KNG BR25.

COPIES LTTR ENCL 1

0 1

0 1

1 1

1 1

1 0

1 1

?

2 3

3 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LIC BR ¹2" BC STARKiR ~

04 AUX SYS BR*

07 CONT'YS BR 09 EFF TR SYS BR12 EQUIP QUAL BR13 HUM FACT ENG BR I8C SYS BR 16 LIC GUID eR MATL KNG BR 17 MPA OEI.D POWER'YS BR 19 QA. BR 21 REAC SYS BR 23 SIT ANAL BR 24 COPIES LTTR ENCL 1

0 1

1 1

1 1

1

~

1 1

3 1

1 1

1 1

1 1

1 1

0 1

0

,1 1

1 1

1 1

1 EXTERNALS ACRS NSIC 27 05i 16 16 1

1 LPDR 03 1

1 gpy 0 g SS>

TOTAL NUMBER'F COPIES REQUIRFDe LTTR 56 ENCL-"

50 H)y

TWO NORTH NINTH STREETS ALLENTOWN~ PA I 8 I 0 I PHONEr {2 I 5) 770 5 I 5 I NORMAN W. CURTIS Vice President

~ Enpineerinp IL Construction-Nuciear 770.5381 April 2, 1981 Mr. R. L. Tedesco Asst. Director for Licensing Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555 SUSQUEHANNA STEAM ELECTRIC STATION ESTIMATED COST TO MAINTAIN UNITS INACTIVE ER 100450 FILE 841-2 PLA-705

Dear Mr. Tedesco:

ef/j/ylr~

'lg/

~g u,

'98)~

Og Crrrpr Or+7 XIt{

This letter provides a response to your letter on March 25 requesting an estimate of the monthly cost to maintain Unit 1 in an inactive status while awaiting a full power license.

Susquehanna SES will be an integral part of the Pennsylvania-New Jersey-Maryland (PJM) generation system.

A licensing delay to this unit will impact the whole system.

Replacement energy will be supplied by coal-fired and oil-fired units in the PJM system.

Therefore, the attached table shows replacement energy cost estimated for the PJM system.

The additional capital cost estimated for a delay of 8 months is

$ 235 million.

This cost has two components.

First, an additional cost of capital used during construction of $ 150 million.

This results from the interest charges on the total Unit 1 investment being extended over the delay period.

Second, an additional investment of $85 million is estimated to maintain current levels of engineering, plant staff, project management, other technical personnel, and construction services during the delay period.

Although it is not specifically requested, it is important to note that a delay of Unit 1 will likely impact Unit 2 and cause additional expenses.

Very truly yours, N.

W. Curtis Vice President-Engineering 6 Construction-Nuclear 6oo/

5 DPM/mks Attachment cc:

R.

M. Stark NRC PENNSYLVANIA POWER 8

LIGHT COMPANY 81 05 05058 4

COSTS OF LICENSING DELAYS Ener Cost Energy Mix Replacement Fuel Cost Nuclear Fuel Cost Incremental Fuel Cost Replacement Energy Cost/Month Delayed 30K coal 70% oil 60 mills/kwh 10 mills/kwh 50 mills/kwh

$ 25 x 10 6 Ca ital Cost Total Capital Cost (Unit 1)

Cost/Month Delayed

$ 1848 x 10 6 930 x 10 6