ML18030A270

From kanterella
Jump to navigation Jump to search
Responds to NRC Concern Re Ground Water Level Monitoring (Ref FSAR Q 371.30).Util Will Revise Answer to Indicate High Water Level Observed in Any One Piezometer Location Around Pond Will Cause Specified Action to Be Taken
ML18030A270
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/30/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PLA-753, NUDOCS 8105050574
Download: ML18030A270 (4)


Text

RKGULAiTO INFORMATION DISTRIBUTION STEM 'RIDS)

ACCESSION NBRs8105050574 DOC,DATEs 81/04/30 NOTARIZED!

NO DOCKET' FACIL450.>>387 Susquehanna Steam Electr.ic Stations Unit 1~ Pennsylva 05000387 50 388 Susquehanna Steam Electric Stations Unit 2'g Pennsylva 05000388 AUTH'YNAME AUTHOR AFFILIATION CURTIS

W ~

Pennsylvania Powers 8 Light'os RECIP ~ NAMEI RECIPIENT'FFILIATION YOUNGBLOODr8 J ~

Licensing Br anch 1

SUBJKCTs'esponds to NRC concern re: ground water level monitoring, (ref FSAR Q 311 '0) ~ Util~ will revise answer-to indicate high water lave.l observed in any one.piezometer location around pond will cause>> specified action to be taken.

DISTRIBUTION CODEl BODIS COPIES RECEIVED>>LTR JENCL@

SIZE>>

J'ITLE'.

PSAR/FSAR AMDTS and Related Correspondence NOTESsSend I8E 3 cop)es FSAR 8 all amends, Send I8E 3 copies-FSAR 8 all amends; 05000387 05000388 RECIPIENT ID CODE/NAMEI ACTION:

A/D LICKNSNG RUSHBROOKgM ~

INTERNAL's ACCID ElVAL BRPb CHEM ENG BR 08 CORE PERP BR 10.

EMKRG PREP 22".

GEOSCIENCES 14 HYD/GEOI BR 15, I8E>

06 LIC QUAL'R MECH ENG BR 18 NRC PDR 02, OP LIC BR PROC/TST REV 20.

RAD~,SSESS BR22'1.

STRUCT KNG BR25.

COPIES LTTR ENC 1

1 1

1 1

1 2

1 1

1 1

1 1

1 L

RECIPIENT ID CODE/NAME LXC BR N2" BC STARKrR'o 04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12'QUIP QUAL BR13 HUM FACT< ENG-BR I8C SYS BR 16'IC GUID BR MATL>> ENG BR 17 MPA OELD POWER SYS'R 19 QA BR 21 REAC., SYS BR 23 SIT~ ANAL" BR 24 COPIES LTTR ENCL" 1

1 1

-3 1>>

1 1

1 1

1 1

1 1

1 EXTERNAL'. ACRS NS'I C 27 05>>

16 1

1 LPDR 03 MAY 06 l991 TOTAL NUMBER OF COPIES REQUIRED!

LlTTR ENCL~

I N

)

J

/

Q, f

4

~ i II e

fI II~

k 4

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr (215) 770-5151 NORMAN W. CURTIS Vice President-Engineering 5 Construction-Nuclear 770.5381 Mr. B. J.

Youngblood, chief Licensing Branch No.

1 U. S. Nuclear Regulatory Commission Washington, D.C.

20555 April 30, 1981 Susquehanna Steam Electric Station SER Outstanding Issue No.

2',

ER100450 File 841-2 PLA-753

Dear Mr. Youngblood:

In response to your concern regarding ground water level monitoring

( Reference FSAR g 371.30 ),

PPImL will revise the answer to indicate that a high water level observed in any one piezometer location around the pond will cause the specified actions to be taken.

This change will be submitted in a later FSAR revision.

Very truly yours,

~ Cc~e~~/

N.W. Cur.tis Vice President-Engineering and Construction-Nuclear cc:

R.M. Stark I /~c C

g g4 r-j 0

gol

. 5

(/o S ~060SO>>~

A PENNSYLVANIA POWER IL LIGHT COMPANY

c 4'7 r