ML18030A260

From kanterella
Jump to navigation Jump to search
Forwards Design Assessment Rept Figure Re Liner Plate Wall Embeds & Anchors.Submittal Closes NRC Concern Re Equipment Design
ML18030A260
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/16/1981
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PLA-732, NUDOCS 8104210353
Download: ML18030A260 (4)


Text

RKGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NSR;8104210353 DOC ~ DATE: 81/04/16 NOTARIZED:

NO FACIL:50 387 Susquehanna Steam Electric Station< Unit ii Pennsyl va 50-388 Susquehanna Steam Electric StationE Unit 2E Pennsylva AUTH BYNAME AUTHOR Af FLLIATION CURTI SE N ~ IIS ~

Pennsylvania Power L Light Co ~

REC IP ~ NAME RE C IP IENI'F F ILIATION YOUNGBLOOOE.BAJA Licensing Br'anch 1

SUBJECT:

Forwards design assessment rept figure r e liner plate wall emeds 8 anchors, Submittal closes NRC concern re equipment design

~

DISTRIBUTION CODE:

BOOIS COPIES RECEIVEDtLTR IKNCL g SIZE:

TITLE; PSAR/FSAR AMDTS and Related Correspondence NOTES:Send I8,E 3 copies FSAR 8 all amends'end ILE 3 copies FSAR 8 all amends'OCKET

¹ 0500 987 05000387 05000388 REC IP IENT ID CODE/NAME ACTION:

A/D LICENSNG RUSHBROOKEM ~

INTERNAL: ACCID EVAL BR26 CHEM ENG BR 08 CORE PERF BR 10 KME,RG PREP 2c!

GEOSCIK>>CES 19 hYO/GKO BR 15 ILE 06 LIC QUAL OR MECH ENG BR 1 d NRC PDR 02 OP LIC BR PROC/TST REV 20 RA

~S BR22 G

FIL~

01 ENG BR25 CORI,ES LTTR ENCL 1

0 0

1 1

1 1'

1 1

0 1

1 2

5 3

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1

'RE C I P IENT ID COOK/NAME YOUNGBI OODpB STARKERS 04 AUX SYS BR 07 CONT SYS BR 09 EFF TR SYS BR12 EQUIP QUAL HR13 HUM FACT ENG OR IKC SYS BR 16 LIC GUID BR MATL ENG BR 17 MPA OELD POWER SYS BR 19 QA BR 21 REAC SYS BR 23 SIT ANAL BR 24 SYS INTERAC BH COPIES LTTR ENCL 1

0 1

1 1'

1 1

1 1

3 3

1 1

1 1

1 1

0 1

0 1

1 1

1 1

1 1

1 EXTERNALS ACRS NSIC 27 05.

ib 16 1

1 LPDR 03 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 57 ENCl 51

PPal TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEr (215) 770 5151 NORMAN W. CURTIS Vice President

~ Engineering 8 Construction-Nuclear 7705381 M. B. J.

Youngblood Licensing Branch k'1 U. S. Nuclear Regulatory Commission Washington, D.

C. 20555 April 16, 1981 Susquehanna Steam Electric Station Docket Nos.

50-387 and 50-388 Liner Plate Wall Embeds and Anchors Drawing ER100450 File 841-2 PLA-732

Dear Mr. Youngblood:

Attached is a copy of a DAR figure which shows the liner pl'ate wall embeds and anchors.

This figure will be in the next revision to the DAR.

This closes your concern on the design of the liner plate wall embeds and anchors.

Very truly yours,

@.&~/s N.

W. Curtis Vice President-Engineering and Construction-Nuclear cc R.

M. Stark bss:

N.

W.

W.

E.

B. A.

C. T.

R. J.

Curtis Barberich Snapp Coddington Shovlin goo 5

rh 8$ 042 X11 /$ 5 PENNSYLVANIA POWER IL LIGHT COMPANY

3" x I"x 3'O" MIN I4'W"MAX)

ANCHORS 4 Now 4" x II1 x 6'10 OTOLERAN E

4" x2" x 20' SHEAR LUGS 4 Not 1

or1S-R W.P.

1 0I~

1 0I~

W.P ANCHOR MAY BE ROTATEO TO AVOID INTERFERENCE W/ REBAR TYPICAL PLAN ELEVATION EMBED SCHEDULE IVENT PIPE BRACING LEVEL ONLYI EM-1 668'4" EMBED No W.P.ELEV AZIMUTH DESCRIPTION

,VENT PIPE BRACING SOo eOo 10 12 668'N" VENT PIPE BRACING SUSQUEHANNA STEAM ELECTRIC STATION UNITS 1 AND 2 DESIGN ASSESSMENT REPORT LINER PLATE WALL EMBEDS AND ANCHORS FIGURE