ML18030A169

From kanterella
Jump to navigation Jump to search
Informs of Plans to Construct Holding Facility for Low Level Radwaste at Util.Facility Will Provide Interim Storage for 4-yr Max.Const Will Begin in Mar 1981
ML18030A169
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/25/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Jennifer Davis, Harold Denton
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS), Office of Nuclear Reactor Regulation
References
NUDOCS 8012020448
Download: ML18030A169 (4)


Text

RKGUL'ATOP'NFORMATION DISTRIBUTIOV TEA (RIDS)

ACCESSION NBR: 8012020448 DOC, DATE: 80/11/25 NOTARIZED! NO DO FACIL;50 387 Susquehanna Steam Electric Stationi Unit ii Pennsylva 050 0387 50-388 Susquehanna Steam Electric Stationi Unit 2i Pennsylva 0 AUTH'AME AUTHOR AFFILIATION CURTIS' ~ rl ~ Pennsylvania Power L Liight Co ~

RECIP ~ NAME RECIPIENT AFFILIATION iaaf.

DENTON~H,R. Office of Nuclear Reactor Regulationr Director DAYIS~J,G, Office of Nuclear Material Safety L Safeguards elJ.~q

SUBJECT:

Informs of pl ans to~

radwaste at util, Facility construct will

~~y I

provide feei i ty for low evel 1

interim storage for 1

yr max ~ Const will begin in Mar 1981 DISTRIBUTION CODE: 8001S COPIES RECEIVED:LITR i KNCLi o SIZE ~

TITLE: PSAR/FSAR AMDTS and Related Correspondence NOTES:Send ILE' copies FSAR L 'all 05000387 ILE' copies FSAR L all amends, amends'end 05000388 RKCIPIEiVT COPIES REC'IPIENl'I COPIES ID CODE/iVAME, LITTR KNC ID CODE/NAPIE LTTR ENC ACTION: A/D L'ICENSNG 1 YOUNGBLOODtB'TARKgR 1

RUSHBROOKzR. 1 ~ 04 INTKRNALI~ ACC ID EVALI SR26 1 AUX'YS BR 07 1 CHEM EVG BR 08 1 CONT SYS SR 09 1 CORE PKRF BR 10 1 EFF'R SYS BR12 1 EMERG PREP 22 1 EQUIP QUALI BR13 3 GEOSCIEiVCE8 14 1 HUM FACT ENG BR 1 HYD/GEO BR 15 2 ILC SYS BR 16 1 ILK 06 3 LICi QUID BR 1 LIC QUAL) BR 1 MATLi ENG BR- 17 1 MECH ENG BR 18 1 "MPA 1 NRC POR 02 1 OELD 1 OP I.IIC BR 1 POKIER SYS BR 19 1 PROC/TST REV 20 1 QA BR 21 1 RAD S BR22 1 REAC SYS BR 23 1 G FILE, 01 SIT ANAL BR 24 NG BR25 1 SYS INTKRACi BR 1 EXTERNAL,; ACRS 27 16 1 LPDR 03 NSIC 05 1

~AvS5 Q sN~hm4' TOTAL NUMBER OFi COPIES

'I'0 REQUIRED'TTR ~ ENCL

1 If l9 f

I'WO 5

NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEL {215) 82'1-5151 fLLjLf NORM~URTIS Pr~aa~'Englne~ng C~gtrn-Nuclear Vice 821-53~@-j K'AW8, Q~",; l9 l f icr'i-,

C5~w

,))45 i co cA November 25, 1980 Harold R. Denton, Director Office of Nuclear Reactor Regulation Nuclear Regulatory Commission washington, D.C. 20555 John G. Davis, Director Office of Nuclear Material Safety g Safeguards Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

This letter is to inform you that Pennsylvania Power 5 Light Company currently plans to construct a holding facility for low-level radioactive waste at its Susquehanna Steam Electric Station. The facility will provide interim for a maximum period of four years and is intended storage'apability for contingency use only. Ne are in the process of finalizing the design of the facility and anticipate filing for the nec-essary license at the appropriate time. Construction is ex-pected to begin in March 1981.

Sincerely, Norman N. Curtis cc: Mr. Darrell G. Eisenhut

<Vl O

'L PENNSYLVANIA POWER 8L LIGHT COMPANY Jl QiQXRQR 8 5%1

~e&

'J

'1$

J l

I I

lH