ML18030A149

From kanterella
Jump to navigation Jump to search
Interim Deficiency Status Update Rept Re Pacific Check Valves.Bechtel Investigation & Rept Re Defective Check Valves Will Not Be Available Until 801231.Will Submit Final Rept by 810131
ML18030A149
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 10/06/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-554, NUDOCS 8010140331
Download: ML18030A149 (4)


Text

REGULATORY INFORMATION DISTRIBUTIOV SYSTEM (RIOS)

ACCESSIOV NBH:8010140331 OOC DATE: 80/10/06 VOTARIZED: NO Electric Stationt Unit li Pennsyl va

~

FACIL:50-38 'usquehanna Steam u5000387

-388 Su auehanna Steam Electric Station~ Unit 2i Pennsylva 05000388 A AUTHOR AF F ILIAT ION CU TISgN ~ ~ ~ Pennsylvania Power 8 Light Co ~

RECIP ~ NAME RKC IP IEN T AFF ILIA1'ION GR IERg 8 ~ H ~ Region l~ Philadelohiai Office of the Director

SUBJECT:

amends'OCKET Interim deficiency status update rept re Pacific check valves.Bechtel investigation 8 rept re defective check valves will not oe available until 801231.'/fill submit final rept oy 810131 ~

DISTR IBUTIOV COOK: B019S COPIES RECEIVED:LTR TITLE: Construction Deficiency Report (10CFR50.55E) g KVCL Q,'IZE:

NOTES:Send ILK 3 cooies FSAR 8 all 05000387 05000388 REC IP IKN T COPIES REC IP IEN 1'D COPIES ID CODE/NAME LT 1'R EiVCL COOK/NA'iE LTTR ENCL ACT ION: AID LICENSiVG Oil YOUNGBLOODzB 05 RUSHBROOK '0 ~ 06 STARKpR ~ 07 INTERNAL: AD/RC I/IE 17 AEOD 18 ASLBP/J ~ HARD D/DIR HUH FAC15 KDO 8 STAFF 19 EQUIP QUAL BR 1 1 HYD/GKO BR 22 IRK 09 LIC QUAL BR iVRC PDR Q RE V 12 02 13 OELD'1

,1PA QA BR 20 10 EG FILE 01 RUTHERFORD 8 ~ IE S Ev 21 EXTERNAL: ACRS 16 16 LPDR 03 NSIC 08 1 OCT 15 1980 y

TOTAL iVU<BER OF COP IKS REQUIRED LT TR ~ ENCL

TWO NORTH NINTH STREET, ALLENTOWN, PA. ISIOI PHONEr t215) 821 ~ 5151 NORMAN W. CURTIS Vice President- Engineering 8 Construction-Nuciear 821-5381 October 6, 1980 Mr. Boyce H. Grier Director, Region I U. S. Nucleax Regulatoxy Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION STATUS UPDATE ON DEFICIENCY OF PACZFZC CHECK VALVES ERs 100450/100508 FILES 804-4/900-10 PLA-554

References:

PLA-502 dated 07/03/80 PLA-466 dated 03/31/80

Dear Mr. Gxier:

This letter serves to provide the current status relative to a condition identified in the above referenced correspondence which advised the Commission of a deficiency xeportable undex the pxovisions of 10CFR50.55(e) .

PPGL has been advised by Bechtel that. its investigation and report relative to the defective check valves will not be available until December, 1980; Conse-guently, PPSL expects to provide the Commission a final report in January, 1981.

Very truly yours, N. W. Curtis Vice President-Engineering & Construction-Nuclear 4

FLWsmcb cc: Mr. Victor Stello (15)

Director-Office of Inspection 6 Enforcement U. S. Nuclear Regulatoxy Commission Washington, D.C. 20555 Mr. G. McDonald', Director Office of Management Information a Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatoxy Commission P. 0 Box 52 Shickshinny, Pennsylvania 18655 PEHHSYLVANIA POWER 8 LIGHT COMPAH)'

OX4Q  % I'

fiture D TYPICAL BWR-I PLANT PRE11ARY CONTAUIMENT~ REACTOR CORE ISOLATIIXICODLING CMDKINATE'UREUQKCTION HICN PRESSURE i~

II V SYSTEM SOUNDARIES

STOR'AGE 'f SYSTEM II .pe

'?r?/..5?vi"g; I REACTOR COOLANT SYSTEM To RCIC II II ASSOCIATED AUXILIARY YI PLSIP SUCTION II PROM COXOEliSATE SYSTEHS 8 ENGINEERED II II II II STORAGE SAFETY FEATURES II II rr/M./v.?t/ tl HAIN STEAM 8 FEEDWATER II II II R?MPH ~

~

\

s~

II II To CONDENSER SYSTEMS I %TO MAUI II II AUXILIARYCOOLING SYSTEMS 4 C VDKNSER II CQÃTATIME'.IT SPRAY MAUISTEAM I II REACTOR Co.'i fRGL RCO II DRIVE SYSTEM L + AVJ L W'ESSE

/5~0/ ~

SERVICE fKEDWATER V

/IO/r r. CORE 5PRAY WATKlt PUMPS II II To SUPP.

POOL i~

I YNIKPmP DISCHARGE,i DRYIVELL ANt COOLER5 I COOLUIG 11'AIKR To NEAT ENCE'.icERS II

~-A 'I CCOLDIG WATER SYSTEM 11

~ V II I II STAND NY LIOLTD II II ll I COXTROL SYSTEM ++ I CCOLDIC WATER II II I PUMPS

(~%Hi ltEACTOR CLEANUP II II II II I

I II II I-I II PUSIP MOTOR SYSTEM II CCOLUIG 5-REGKNCI 'vi II NIGH PRESSURE 4:r 1

EX LIOUIDCONTROL PUMPS r/

SAMPLEic/'/

RECIRCULATICIIPUMPS

//

//

/r

?/rr/V~

r /r

/

/r ILN iEXCN, rr riJ/ ~g 4 SERT.

WATKR RESUH.'At. HEAT II Tn rnid iNYR DEICHARCK RKSIOVAL PUMPS II ~

It 0%SUPPRESSION/O Rf tloVALSYSTKAI vr

'V 0 SUPPRKSSIO POOL POOL /r SKRITCE LOW PRESSLTIE A WATER DNCH SKRVICI CORK'ISECTIOH h V' I WATKR PUMPA USKRVICE

'IVATKR PUMPS