ML18030A126

From kanterella
Jump to navigation Jump to search
Forwards Final Deficiency Rept Re Insulation Damage & Deficient Pin Crimps in Power Generation Control Complex/ Advanced Control Room Panel Connectors
ML18030A126
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/08/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18030A127 List:
References
PLA-506, NUDOCS 8007140170
Download: ML18030A126 (3)


Text

REGULATORY Ir OHMATIOrV DISTRIBUTION SYS (RIDS)

ACCESSION NBR:8007140170 DOC ~ DATE: 80/07/08 NOTARIZED: NO DOCKET FACIL:5 . souehanna Steam Electric Station~ Unit 1i Pennsylva 05000387 88 save@anna Steam Electric Stationi Unit 2g Pennsylva 05000388 AUT ~ AUfHOR AFFILIATION CURT I ~ N ~

'6 ~ Pennsylvania Power 8 Light Co ~

REC{P ~ NA~iE RECIPIENT AFF ILIATION GRIER,B,H. Region li Philadelphia> Office of the Director

SUBJECT:

Forwards final deficiency reot re insulation damage deficient oin crimps in power generation contr ol comolex/

aavancea control room oanel connectors.

DISTRIBUTION CODE: 8019S COPIES RECEIVED;LTR ENCL SIZE:

TITLE; Cons t ruc t on i Deficiency Report (10CFR50 ~ 55E)

,.;,dna' r f+~,c~p ie~ Fse~a HII w~~a~

REC IP [E'l T COPIES RECIPIENT COPIES ID CODE/VA-'"E LTTR ENCL ID CODE/NAVE LTTR ENCL AC T ION: AOA.iC L+~pp~g~ gy FA4~~1 1 1 BCPba~gy j+~ 14 gg 1 1 1 1 PP~p~ 1 INTERNAL; AD/RCI/IE

-DIRE HU)M FAC SFY EQUIP QUAL BR16 HYO/GEO BR 22 LIC QUAL BR MPA 08 OELO 23 P - i-- . BR

.EG FILE 01 EXTERNAL: ACRS 24 16 16 LPOR 03 1 1 NSIC 04 1 1 JUL Z 5 )gga TOTAL NUMBER OF COPIES REQUIRED'TTR ~ E 'CL egg

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONE: (215) 821-$ 1S1 NORMAN W. CURTIS vice presroent-Engineenng 8 construceon 821.5381 July 8, 1980

~0

/

Mr. Boyce H. Grier Director, Region I U. S. Nuclea Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA ST~~ ELECTRIC STATION FINAL REPORT OF A DEFICIENCY ON PGCC/ACR ELECTRICAL CONNECTORS ERs 100450/100508 FILE 840-4/900-10 PLA-506

Reference:

PLA-447 dated 2/1/80

Dear Mr. Grier:

This letter serves to provide the Commission with a final report of a deficiency on Power Generation Control Complex/Advanced Control Room (PGCC/ACR) panel connectors originally reported in the referenced letter.

The information is furnished in fulfillment of our obligations under the provisions of 10CFR50.55(e).

The attachment to this letter describes the deficient condition along with its safety implications and the corrective action being taken to achieve resolution.

Ne trust the Commission will find the information forwarded by this letter to be satisfactory.

Very truly yours, N. W. Curtis Vice President<<Engineering & Construction-Nuclear Po/1 Attachment ARS I jmk zA 8007> 40 I yg PENNSYLVANIA POWER 8 LIGHT COMPANY

Mr. Boyce H. Grier July 8, 1980 cc: Mr. Victor Stello (15)

Director-Office of Inspection 6 Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G. McDonald, Director Office of Management Information & Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, Pennsylvania 18655