Discusses Summary of Case Load Forecast Panel 800320-21 Site Visit to Facilities Re Util Scheduling Methods & Present Problems.Tmi Impacts Not Included in Schedule.Qc/Qa Reviews & Documentation Require 4 Wks
ML18030A111
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 05/23/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
PLA-487, NUDOCS 8006060369
Download: ML18030A111 (3)


Text

REGULATORY I VFORHA T ION D I STR I HUT ION, S

Ei~

(R I DS)

~>J<

ACCESSION NgR:8006060369 DOC ~ DATE: 80/05/23 NOTARIZED:

NO FACIL:'hree Hi l e Is l and IVuc 1 ear Stat i onP Uni t 2P Net rooo1 i t Susquehanna Steam Electric StationP Unit ii Pennsylva Susquehanna Steam Electric Station<

Unit 2P Pennsylva AUTH ~

IA E

AUTHUR AFF 1L I A T ION C UR 'f I S P N ~ >s ~

Pennsylvania Power 8 Light Co.

REC IP 0 "(A"E.

RECIPIEIVT AFFILIATION YOUNGSLOOD<B.S.

Licensinq Sranch DOCKET 05000320 05000387 05000388 1

1 3

3 4

4 1

1 2

2 1

1 1

1 1

1 0

1 1

1 1

0 1

0 2

2 1

0 1

1

,1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 0

1 0

1 0

1 0

09 GEO SC I EIV 8R 11 t~!ECH ETVG BR l 3 NATL E~lG BR 1 6 ANALYSIS 8R lo AUX SYS BR 20 I I C

SYS 8!7 22 AO SI lE TECH 27 EFFL TR T SYS 29 KIRK'~ODD AD PLAVT SYS AO/CORE 8

CONT HYIOPO

~METEOR dR JELD

SUBJECT:

Discusses summary of Case Load Forecast Panel 800320 21 site visit at facilities re util scheduling methods 8 present prohlems AT"!j impacts not included in schedule QC/QA reviews

'4 documentation require 4

wtcs ~

DISTRISOTION CODE:

SOOIS COPIES RECEIVED:LTR ENCL Q SIZE:

TITLE: PEAR/FEAR ANDTS and Related Correapdndenae NOTES:gal//D X tL 6' 0/tt~ FSB~ N- /(ZC~W~~. 8R/~~LFT/TLA~/8 8+.D~

ICjj-5'CAt5 - ORB STtt 8C.

IZI TETAIC/O

/EAf-mO F/

SPEC.. C./RAFA/8 rZ.

REC I P iaNr COPIES RECIPIENT COPIES ID CODE/IAMi=

LTTR ENCL IO CODE/zeAME LTTR ENCL AC T ION:

05 PlLI~~~(+(++p~((~

1 1,

AO 4t4I W.~l <~+(CE.

1 0

BC I ~g gg, 1

0 LALu/R8H 1

0

(=(Qg

~W]

b('P(CQ INTERNAL:

REG FILE 02 NHC PDH 08 OPFRA LIC BR 10 QAB 12 STRUC ENG ttR 15 REAC SYS BR 17 CORE PEHF BR 19 CONTAIV SYS 21 PO>>ER SYS HR 26 ACCDNT AHLYS 28 RAO ASST RR AQ F'R ENG AD Sit'E ANLYS1S D IRECTOR NRR MPA EXTERiVAI: 03 LPDR 30 ACRS 10 10 04 NSIC 1

1 80 el TOTAL NU>HER OF COPIES REQUIRED:

LTTH ~

ENCL

1'WO NORTH NINTH STREET, ALLENTOWN, PA.

18101 PHONE: t215) 821.5151 May 23, 1980 NORMAN W, CURTIS Vice President. Engineering 6 Construction 821-538t Mr. B. J.

Youngblood, Chief Licensing Projects Branch 1

Division of Project Management U.S. Nuclear Regulatory Commission Washington, D.C.

10555 SUSQUEHANNA STEAM ELECTRIC STATION CASE LOAD FORECAST PANEL MEETING

SUMMARY

ER 100450 FILE 841-3 PLA 487 Docket Nos.

50-387, 50-388

Dear Mr. Youngblood:

We have reviewed the summary of the site visit your Case Load Forecast Panel made to our Susquehanna plant on March 20-21, 1980.

We appreciated the opportunity to discuss our scheduling methods and the scheduling problems we are presently facing.

Several items in the summary of the visit require clarification.

We added a three months contingency allowance between fuel load and commercial operation in 1978.

Conse-

quently, a slip in the fuel load date of three months would not cause a delay in commercial operation.

A slip to November, 1981 would however, cause commercial operation of-Susquehanna to be delayed.

We would like to point out that until the next Project Forecast is completed in the fall of 1980, a new and definitive fuel load date cannot be established.

While the reported percent complete (77% at the time of the meeting) includes an estimate of TMI impacts (short-

, term lessons learned),

the schedule does not yet reflect these impacts.

No TMI impacts are included in the above schedule

'ontingency.

Our final comments are that 12% of the plant is within two weeks of "construction completion" not "turnover for testing" as stated in the summary.

About four weeks are allowed between tt tPr, 0

PENNSYLVANIA POWER 8

LIGHT,COMPANY 80060603@y P

Mr. B. J. Youngblood, Chief Page 2

"construction completion" and "turnover for testing" for documen't-ation and QC/QA reviews.

The systems necessary to support reactor vessel and primary system hydro testing are not within two weeks of turnover, but are on a schedule compatible with a September l hydro test.

If we can be of further assistance, please let me know.

Very truly yours, N.

W. Curtis