ML18030A001
| ML18030A001 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 10/10/1985 |
| From: | Lempges T NIAGARA MOHAWK POWER CORP. |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8510160218 | |
| Download: ML18030A001 (6) | |
Text
REGULATOR Y INFORMATION DISTRIBUT'ION SYSTEM (RIDS) t ACCESS'ION NBR t 85 1 01 602'1 8, DOC ~ DATE!'5/1P/1 0 NOTARIZED; NO DOCKET' FACIL:50. 220 Nine Mile Point-Nuclear Station<
Unit 1 q Niagat a Powe 05000220 AUTH ~ NAME'.
AUTHOR AFFILI'ATION LBMPGES~ T ~ E",
Niagara Mohawk~ Power Corp.
RECIP ~ NAME<
RECIPIENT AFFILIATION VASSALLOj D QB ~
Operating Reactors Bf anch 2.
SUBJECT:
Submits schedu,l e; to meet requirements fo 1 OCFR50
~ 62 r e, ATHS events~ forI 1 i ght water<<cool ed nuc 1 ear power I pl ants; Alternate.
rod inJection sys installed by end of 1988 refuel ing. t maint outage,Uti 1 evaluating standby liquid control sys; DISTRIBUTION CODE:
A055D COPIES RECEI VED t L'ITR g, 'NCL:
SIZE',:
TITLE:'R/Licens i ng Submi t ta l: Salem ATNS Even ts GL 83-28 NOTES:
OL'e 08/22/69 05000220 REC IPI ENT>
ID CODE/NAMEl NRR'RB2 BC 0 1 INTERNAL: ACRS ELD/HDS3 IE/DQAVT NRR/DE/MEB NRR/DHFS/LQB NRR/DL/DRAB NRR/DL/TAPMG NRA/DSI'/ICSB NRR/DS I'/RSB RGN 1 COPIES LTTR ENCL:
3 6
1
=
1 1
1 2
1 1
RECIPIENT' D CODE/NAMEI OA ADM/LFMB IE/DI'RR/DE/EQB NRR/DHFS/HFEB NRR/DL" D IR NRR/DL/SSPB NRR/DS I'/ASB N
I+
IL COPIES'>TTRI ENCL 1
1 1
~
1.
1 1
1 1
1=
EXTERNAL; 20X NRCA PDR.
1
~
1 1
LPDR NS I C 03 05-TOTAL NUMBER OF COPIES REQUIRED:LTTR 3B ENCL
1 4
~
I[
n
'i F
l A
V l
AlV HIIASAIR
. K MQHAMK NIAGARAMOHAWKPOWER CORPORATION/300 ERIE BOULEVARDWEST. SYRACUSE, N.Y. 13202/TELEPHONE (315) 474-1511 October 10, 1985 Director of Nuclear Reactor Regulation Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re:
Nine Mile Point Unit 1
Docket No. 50-220 DPR-63
Dear Mr. Vassallo:
This letter provides you with our intended schedule to meet the r equirements of 10 CFR 50.62.
This regulation addresses anticipated transients without scram (ATWS) events for light water cooled nuclear power plants.
Boiling water reactors must meet Sections 10 CFR 50.62.c(3), c(4),
and c(5).
Section 10 CFR 50.62.c(3) requires an alternate rod injection system with diversity between sensor output to the final actuation device.
The system must have redundant scram air header valves.
Niagara Mohawk will have an alternate rod injection system installed by the end of the 1988 refueling and maintenance outage.
This outage will be the second refueling outage for Nine Mile Point 1 after July 26, 1984.
Section 10 CFR 50.62.c(4) requires a standby liquid control system with the equivalent control capacity as defined in Generic Letter 85-03, dated Januar y 28, 1985.
Niagar a Mohawk is currently evaluating two alternatives to meet this requirement:
(a) use of enriched boron, or (b) modifying the standby liquid control system to increase the injection rate.
Niagara Mohawk will select and implement one of these, or another acceptable alternative, by the end of the 1988 refueling and maintenance outage.
As permitted by 10 CFR 50.62, the standby liquid control system will remain manually initiated.
8>101O P9~
gnQCK 0 'DR 8S>O.ibO>>8 SOao~o P
~ F r
~
I h
I
~
t h
s I f h W
h
--Gctober 10, 1985 Page 2
I The Nine Mile Point Unit 1 reactor coolant recirculation pumps will trip automatically under conditions indicative of an anticipated transient without scram.
Therefore, further modifications are not considered necessary to fulfillthe requirements of 10 CFR 50.62c(5).
Very truly yours, NIAGARA MOHAWK POWER CORPORATION Vice President Nuclear Generation TEL/AJP:ja